Square 9

Certificate Signed

Bhosari, Pune 411034 |Promoter: Skyline Builders & Developers

3 May 2021Registered with MahaRERA
30 Jun 2027Promised completion
1Building
98Units registered16 booked (16%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Mixed
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, Office space, Shop98 units in all
Address
Cts No 2341, 2341/1 To 2341/3, 2342, 2342/1 To 2342/10, Kasarwadi, BhosariPIN 411034
Designated bank account
229
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.38750, 75.16320
Square 9 is at latitude 19.38750, longitude 75.16320.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2027

Registered
3 May 2021
Promised
30 Jun 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000291573 May 202130 Jun 202730 Jun 2027Skyline Builders & DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Square 9798

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 of 98 units booked (16%), as the promoter reported to MahaRERA

1BHK · 6 unitsOffice space · 47 unitsShop · 45 units
TypeCarpet areaUnitsBooked
1BHK32.81 sq m · 353 sq ft40
1BHK33.25 sq m · 358 sq ft10
1BHK37.9 sq m · 408 sq ft10
Office space13.86 sq m · 149 sq ft60
Office space19.63 sq m · 211 sq ft30
Office space19.85 sq m · 214 sq ft30
Office space21.08 sq m · 227 sq ft10
Office space22.51 sq m · 242 sq ft10
Show all 40 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space23.43 sq m · 252 sq ft30
Office space26.14 sq m · 281 sq ft164
Office space27.37 sq m · 295 sq ft30
Office space28.1 sq m · 302 sq ft30
Office space43.62 sq m · 470 sq ft30
Office space53.63 sq m · 577 sq ft11
Office space61.24 sq m · 659 sq ft41
Shop13.67 sq m · 147 sq ft10
Shop13.86 sq m · 149 sq ft20
Shop14.85 sq m · 160 sq ft10
Shop15.3 sq m · 165 sq ft10
Shop15.68 sq m · 169 sq ft42
Shop19.63 sq m · 211 sq ft10
Shop19.73 sq m · 212 sq ft10
Shop19.85 sq m · 214 sq ft10
Shop20.16 sq m · 217 sq ft10
Shop20.56 sq m · 221 sq ft10
Shop21.08 sq m · 227 sq ft10
Shop22.51 sq m · 242 sq ft10
Shop22.59 sq m · 243 sq ft10
Shop23.43 sq m · 252 sq ft10
Shop26.14 sq m · 281 sq ft113
Shop27.37 sq m · 295 sq ft21
Shop28.1 sq m · 302 sq ft21
Shop28.47 sq m · 306 sq ft21
Shop31.5 sq m · 339 sq ft10
Shop32.34 sq m · 348 sq ft11
Shop32.76 sq m · 353 sq ft10
Shop43.62 sq m · 470 sq ft21
Shop61.24 sq m · 659 sq ft30
Shop75.72 sq m · 815 sq ft10
Shop419.46 sq m · 4,515 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 119 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN CARD SKYLINE BUILDERS DEVELOPERS.pdf · uploaded 22 Feb 2021Source
  • Other – Finance20231230185842_compressed (1).pdf · uploaded 31 Jan 2024Source
  • Other – FinanceDECLARATION TO RERA ABOUT CREDIT FACILITY.pdf · uploaded 31 Jan 2024Source

Legal

  • Declaration Form BDECLARATION FORM B.pdf · uploaded 23 Feb 2021Source
  • Legal Title reportLegal title report.pdf · uploaded 29 Apr 2021Source
  • OtherCASE DECLARATION IN RERA.pdf · uploaded 16 Nov 2021Source
  • OtherDECLARATION TO RERA ABOUT LOAN AVAILED BY BARAMATI BANK.pdf · uploaded 27 Dec 2021Source
Show all 120 documentsShow fewer documents

Legal

  • OtherINDIA GARAGE - KARANAMA_compressed-compressed-compressed (2) (2).pdf · uploaded 8 Aug 2022Source
  • Legal Title reportSearch Report New.pdf · uploaded 29 May 2023Source

Migrated

  • 1 PAN CardPAN CARD SKYLINE BUILDERS DEVELOPERS.pdf · uploaded 22 Feb 2021Source
  • 1 Details of encumbrancesSearch AND Title Report Of Kasarwadi Project.pdf · uploaded 23 Feb 2021Source
  • 1 Copy of Layout Approval (in case of layout)SANCTION DRAWING 1-3-merged-compressed (3).pdf · uploaded 23 Feb 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentSANCTION DRAWING 1-3-merged-compressed (3).pdf · uploaded 23 Feb 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 23 Feb 2021Source
  • 1 Declaration in FORM BDECLARATION FORM B.pdf · uploaded 23 Feb 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 23 Feb 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 23 Feb 2021Source
  • 1 Proforma of Allotment letterAgreement For Sale.pdf · uploaded 23 Feb 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 24 Feb 2021Source
  • 1 Copy of the legal title reportLegal title report.pdf · uploaded 29 Apr 2021Source
  • 1 OtherCASE DECLARATION IN RERA.pdf · uploaded 16 Nov 2021Source
  • 2 OtherDECLARATION TO RERA ABOUT LOAN AVAILED BY BARAMATI BANK.pdf · uploaded 27 Dec 2021Source
  • 2 Copy of Layout Approval (in case of layout)1-5_merged-compressed.pdf · uploaded 27 Apr 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE NO 2-compressed_compressed (1).pdf · uploaded 27 Apr 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE NO 2-compressed_compressed (1).pdf · uploaded 27 Apr 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE 2_compressed.pdf · uploaded 27 Apr 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 8 Aug 2022Source
  • 3 OtherINDIA GARAGE - KARANAMA_compressed-compressed-compressed (2) (2).pdf · uploaded 8 Aug 2022Source
  • 1 CERSAI detailscredai certificate.pdf · uploaded 24 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 pg1 (1)_merged.pdf · uploaded 24 Mar 2023Source
  • 1 Proforma of Agreement for saleAgreement- Survey No.pdf · uploaded 24 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - Quality Assurance Certificate New.pdf · uploaded 30 Mar 2023Source
  • 2 Copy of the legal title reportSearch Report New.pdf · uploaded 29 May 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA CERTIFICATE compressed.pdf · uploaded 31 Jan 2024Source
  • 1 Other – Finance20231230185842_compressed (1).pdf · uploaded 31 Jan 2024Source
  • 2 Other – FinanceDECLARATION TO RERA ABOUT CREDIT FACILITY.pdf · uploaded 31 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Adobe Scan 18 Mar 2024.pdf · uploaded 18 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A - Quality Assurance Certificate New (FY2022-2023).pdf · uploaded 10 Apr 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory.pdf · uploaded 10 Apr 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA CERT SKYLINE.pdf · uploaded 20 Apr 2024Source
  • 2 a Details of encumbrances concerned to FinanceLEGAL Encumbrances.pdf · uploaded 3 Jul 2024Source
  • 1 b Details of encumbrances concerned to LegalLEGAL Encumbrances.pdf · uploaded 3 Jul 2024Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf · uploaded 3 Jul 2024Source
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD BOOKED UNSOLD INVENTERIES.pdf · uploaded 3 Jul 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in Other Real Estate Organizations.pdf · uploaded 3 Jul 2024Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report.pdf · uploaded 3 Jul 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report.pdf · uploaded 3 Jul 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECT CERTIFICATE.pdf · uploaded 12 Jul 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 ENGINEERS CERTIFICATE.pdf · uploaded 12 Jul 2024Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory 2023-2024 REVISED.pdf · uploaded 12 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM -3 CA CERTIFICATE.pdf · uploaded 12 Jul 2024Source
  • 2 Copy of Layout Approval (in case of layout)2-5.pdf · uploaded 22 Feb 2025Source
  • 3 Copy of Layout Approval (in case of layout)3-5.pdf · uploaded 22 Feb 2025Source
  • 4 Copy of Layout Approval (in case of layout)4-5.pdf · uploaded 22 Feb 2025Source
  • 5 Copy of Layout Approval (in case of layout)5-5.pdf · uploaded 22 Feb 2025Source
  • 1 Copy of Layout Approval (in case of layout)1-5.pdf · uploaded 22 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 22 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 22 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 Q2.pdf · uploaded 22 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 22 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Q2.pdf · uploaded 22 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 22 Feb 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 22 Feb 2025Source
  • 1 Building Plan Approval / NA Order for plotted development1-5.pdf · uploaded 22 Feb 2025Source
  • 2 Building Plan Approval / NA Order for plotted development2-5.pdf · uploaded 22 Feb 2025Source
  • 3 Building Plan Approval / NA Order for plotted development3-5.pdf · uploaded 22 Feb 2025Source
  • 4 Building Plan Approval / NA Order for plotted development4-5.pdf · uploaded 22 Feb 2025Source
  • 5 Building Plan Approval / NA Order for plotted development5-5.pdf · uploaded 22 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 22 Feb 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 22 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 20 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 20 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 20 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 20 Apr 2025Source
  • Form 1FORM 1.pdf · uploaded 30 Jul 2025Source
  • Form 2FORM 2.pdf · uploaded 30 Jul 2025Source
  • Form 3FORM 3.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 1Withdrawal Application ARCHITECT.pdf · uploaded 19 Nov 2025Source
  • Withdrawal Update Form 2Withdrawal Application Form2 ENG.pdf · uploaded 19 Nov 2025Source
  • Withdrawal Update Form 3FORM 3_SIGNED.pdf · uploaded 19 Nov 2025Source
  • Form 5 (FY 2023-2024)SKYLINE FORM 5.pdf · uploaded 1 Dec 2025Source
  • Form 5 (FY 2024-2025)SKYLINE BUILDERS 2025.pdf · uploaded 1 Dec 2025Source
  • Withdrawal Update Form 1Withdrawal Application ARCHITECT.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 2Withdrawal Application Form2 ENG.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 3FORM 3_SIGNED.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 17 Feb 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 17 Feb 2026Source
  • Withdrawal Update Form 3SIGNED FORM 3.pdf · uploaded 17 Feb 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 5 Mar 2026Source
  • Withdrawal Update Form 3SIGNED FORM 3.pdf · uploaded 5 Mar 2026Source
  • Form 2A (FY 2023-2024)FORM 2A-FY2023-2024 REVISED.pdf · uploaded 1 Apr 2026Source
  • Form 2A (FY 2024-2025)FORM 2A-FY2024-2025.pdf · uploaded 1 Apr 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 29 Apr 2026Source

Technical

  • DocumentSANCTION DRAWING 1-3-merged-compressed (3).pdf · uploaded 23 Feb 2021Source
  • DocumentSANCTION DRAWING 1-3-merged-compressed (3).pdf · uploaded 23 Feb 2021Source
  • Document1-5_merged-compressed.pdf · uploaded 27 Apr 2022Source
  • DocumentCOMMENCEMENT CERTIFICATE NO 2-compressed_compressed (1).pdf · uploaded 27 Apr 2022Source
  • Document1-5.pdf · uploaded 22 Feb 2025Source
  • Document2-5.pdf · uploaded 22 Feb 2025Source
  • Document3-5.pdf · uploaded 22 Feb 2025Source
  • Document4-5.pdf · uploaded 22 Feb 2025Source
  • Document5-5.pdf · uploaded 22 Feb 2025Source
  • Document1-5.pdf · uploaded 22 Feb 2025Source
  • Document2-5.pdf · uploaded 22 Feb 2025Source
  • Document3-5.pdf · uploaded 22 Feb 2025Source
  • Document4-5.pdf · uploaded 22 Feb 2025Source
  • Document5-5.pdf · uploaded 22 Feb 2025Source

Technical (Architect)

  • DocumentFORM 1.pdf · uploaded 22 Feb 2025Source
  • DocumentARCHITECT CERTIFICATE.pdf · uploaded 22 Feb 2025Source
  • DocumentFORM 1.pdf · uploaded 20 Apr 2025Source
  • DocumentFORM 1.pdf · uploaded 29 Apr 2026Source

Technical (Engineer)

  • DocumentFORM 2 Q2.pdf · uploaded 22 Feb 2025Source
  • DocumentFORM 2.pdf · uploaded 22 Feb 2025Source
  • DocumentFORM 2.pdf · uploaded 20 Apr 2025Source
  • DocumentFORM 2.pdf · uploaded 27 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhosari, Haveli taluka

Survey, CTS, gat or plot numbers

2341/1 TO 2341/323422342/1 TO 2342/10CTS NO 2341

Boundaries

North
Property Of Mr Balasaheb Lande
South
Mani Mangal Road
East
Property Of Jalaram Timbers
West
Old Mumbai Pune Highway

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMr Dayanand K Shinde—
Chartered accountantManish Surana—
Chartered accountantP P Dakle & Co—
Chartered accountantS N Khandelwal And Co—
EngineerManish M Gohil—
OtherRajesh Ratkalkar—

Source: MahaRERA project page. Contact details are not shown.