Sushila Complex

Certificate Signed

Baramati (M Cl), Pune 413102 |Promoter: Sushila Developers

31 Aug 2017Registered with MahaRERA
30 Dec 2022Promised completion
31 Dec 2024Revised completionPushed back 2 years
1Building
114Units registered18 booked (16%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
Office, Room, Shop114 units in all
Address
145PIN 413102
Designated bank account
21
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.37348, 72.88699
Sushila Complex is at latitude 19.37348, longitude 72.88699.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years

The latest completion date on record passed 1 year and 10 months ago.

Registered
31 Aug 2017
Promised
30 Dec 2022
Revised
31 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210001049331 Aug 201730 Dec 202231 Dec 2024Sushila DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sushila Complex6114

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

18 of 114 units booked (16%), as the promoter reported to MahaRERA

Office · 38 unitsRoom · 22 unitsShop · 54 units
TypeCarpet areaUnitsBooked
Office9.18 sq m · 99 sq ft30
Office10.48 sq m · 113 sq ft10
Office16.95 sq m · 182 sq ft10
Office16.98 sq m · 183 sq ft10
Office17.04 sq m · 183 sq ft10
Office20.03 sq m · 216 sq ft240
Office20.04 sq m · 216 sq ft10
Office21.16 sq m · 228 sq ft30
Show all 25 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office21.17 sq m · 228 sq ft10
Office23.08 sq m · 248 sq ft10
Office24.56 sq m · 264 sq ft10
Room10.65 sq m · 115 sq ft10
Room15.05 sq m · 162 sq ft10
Room19.68 sq m · 212 sq ft10
Room20 sq m · 215 sq ft160
Room23.22 sq m · 250 sq ft30
Shop8.32 sq m · 90 sq ft10
Shop10.62 sq m · 114 sq ft10
Shop12.47 sq m · 134 sq ft10
Shop12.81 sq m · 138 sq ft329
Shop14.86 sq m · 160 sq ft87
Shop16.32 sq m · 176 sq ft10
Shop16.59 sq m · 179 sq ft20
Shop16.89 sq m · 182 sq ft41
Shop19.25 sq m · 207 sq ft41

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 120 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardPAN CARD.pdf · uploaded 29 Jul 2017Source

Legal

  • Legal Title reportLIGEL T ITAL.pdf · uploaded 29 Jul 2017Source
  • Declaration Form BDECLETION.pdf · uploaded 29 Jul 2017Source
  • Declaration Form B5 (12).pdf · uploaded 13 Mar 2024Source

Migrated

  • 1 PAN CardPAN CARD.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of the legal title reportLIGEL T ITAL.pdf · uploaded 29 Jul 2017Source
Show all 122 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesEncumdra.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Appruval plan.pdf · uploaded 29 Jul 2017Source
  • 1 Building Plan Approval (IOD)Appruval plan (2).pdf · uploaded 29 Jul 2017Source
  • 2 Building Plan Approval (IOD)Appruval plan.pdf · uploaded 29 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMIS MENT.pdf · uploaded 29 Jul 2017Source
  • 1 Declaration in FORM BDECLETION.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterALLOTMENT.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH 01.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Enn CIRTIFICATE.PDF · uploaded 31 Jul 2017Source
  • 1 Certificates of CA (Form 3)CERTIFICATS.pdf · uploaded 31 Jul 2017Source
  • 1 Declaration about Commencement CertificateBaramati Nagar Par 001.pdf · uploaded 11 Jan 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200227813923_For_Asset_Based_Search_10_01_2022_21_43_25_339.pdf · uploaded 11 Jan 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)sushila - 1 001.pdf · uploaded 14 Jan 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SUSHILA- 2020-2021 001.pdf · uploaded 14 Jan 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FY 2018-19.pdf · uploaded 14 Jan 2022Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FY2018-19.pdf · uploaded 14 Jan 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FY2019-20.pdf · uploaded 14 Jan 2022Source
  • 2 Proforma of Allotment letter1 Proforma of the allotment letter and agreement for sale.pdf · uploaded 14 Jan 2022Source
  • 3 Proforma of Allotment letterSHREE KARPE RAAM BABURAO (1).pdf · uploaded 14 Jan 2022Source
  • 4 Proforma of Allotment letterMAngesh Popat Dalavi 1.pdf · uploaded 14 Jan 2022Source
  • 5 Proforma of Allotment letterPrashant Satav (1).pdf · uploaded 14 Jan 2022Source
  • 6 Proforma of Allotment letterZakir Shaikh (2).pdf · uploaded 14 Jan 2022Source
  • 7 Proforma of Allotment letterShrikant Zore (1).pdf · uploaded 14 Jan 2022Source
  • 8 Proforma of Allotment letterPravin Salunkhe (1).pdf · uploaded 14 Jan 2022Source
  • 9 Proforma of Allotment letterPradip Salunke (1).pdf · uploaded 14 Jan 2022Source
  • 10 Proforma of Allotment letterSHREE KARPE RAAM BABURAO.pdf · uploaded 14 Jan 2022Source
  • 11 Proforma of Allotment letterBHARAT SATE_merged (1).pdf · uploaded 14 Jan 2022Source
  • 12 Proforma of Allotment letterRAVINDRA MATHRE.pdf · uploaded 14 Jan 2022Source
  • 13 Proforma of Allotment letterUddav Bhavar (1).pdf · uploaded 14 Jan 2022Source
  • 14 Proforma of Allotment letterShrirang Jadhav (1).pdf · uploaded 14 Jan 2022Source
  • 15 Proforma of Allotment lettersANTOSH bARATE (1).pdf · uploaded 14 Jan 2022Source
  • 1 Disclosure of sold/ booked inventoryKaagaz_20220114_190906068424.pdf · uploaded 15 Jan 2022Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Cert.pdf · uploaded 2 Nov 2022Source
  • 2 Disclosure of sold/ booked inventoryDiscolsure Of Sold Unsold final.pdf · uploaded 2 Nov 2022Source
  • 2 Certificates of CA (Form 3)CA CER- 2-11-2022 001.pdf · uploaded 2 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM-5 20-21.pdf · uploaded 18 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 21-22 (2).pdf · uploaded 18 Nov 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentSushila Developers Commencement certificate _compressed.pdf · uploaded 8 Feb 2024Source
  • 2 Declaration about Commencement CertificateSKM_C226i24020913041_0001.pdf · uploaded 9 Feb 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (311217) _11zon.pdf · uploaded 21 Feb 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 ( 31032018)_11zon.pdf · uploaded 21 Feb 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 ( 31032019)_11zon.pdf · uploaded 21 Feb 2024Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31032020)_11zon.pdf · uploaded 21 Feb 2024Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31032021)_11zon.pdf · uploaded 21 Feb 2024Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (311221)_11zon.pdf · uploaded 21 Feb 2024Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31032022)_11zon.pdf · uploaded 21 Feb 2024Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (30062022)_11zon.pdf · uploaded 21 Feb 2024Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (30092022)_11zon.pdf · uploaded 21 Feb 2024Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31122022)_11zon.pdf · uploaded 21 Feb 2024Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31032023)_11zon.pdf · uploaded 21 Feb 2024Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (30062023)_11zon.pdf · uploaded 21 Feb 2024Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (30092023)_11zon.pdf · uploaded 21 Feb 2024Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31122023)_11zon.pdf · uploaded 21 Feb 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2 ( 31032019)_11zon.pdf · uploaded 21 Feb 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A (2017 -18).pdf · uploaded 21 Feb 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A (2018-19).pdf · uploaded 21 Feb 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A (2021-22).pdf · uploaded 21 Feb 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A (2022-23).pdf · uploaded 21 Feb 2024Source
  • 3 Certificates of CA (Form 3)Form 3 (31-03-2017)_11zon.pdf · uploaded 23 Feb 2024Source
  • 4 Certificates of CA (Form 3)Form 3 (31-03-2018)_11zon.pdf · uploaded 23 Feb 2024Source
  • 5 Certificates of CA (Form 3)Form 3 (31-03-2019)_11zon.pdf · uploaded 23 Feb 2024Source
  • 6 Certificates of CA (Form 3)Form 3 (31-03-20)_11zon.pdf · uploaded 23 Feb 2024Source
  • 7 Certificates of CA (Form 3)Form 3 (31-03-2021)_11zon.pdf · uploaded 23 Feb 2024Source
  • 8 Certificates of CA (Form 3)Form 3 (31-12-2021)_11zon.pdf · uploaded 23 Feb 2024Source
  • 9 Certificates of CA (Form 3)Form 3 (31-03-2022)_11zon.pdf · uploaded 23 Feb 2024Source
  • 10 Certificates of CA (Form 3)Form 3 (30-06-2022)_11zon.pdf · uploaded 23 Feb 2024Source
  • 11 Certificates of CA (Form 3)Form 3 (31-12-2022)_11zon.pdf · uploaded 23 Feb 2024Source
  • 12 Certificates of CA (Form 3)Form 3 (31-03-2023)_11zon.pdf · uploaded 23 Feb 2024Source
  • 13 Certificates of CA (Form 3)Form 3 (30-06-2023)_11zon.pdf · uploaded 23 Feb 2024Source
  • 14 Certificates of CA (Form 3)Form 3 (30-09-2023)_11zon.pdf · uploaded 23 Feb 2024Source
  • 15 Certificates of CA (Form 3)Form 3 (31-12-2023)_11zon.pdf · uploaded 23 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 ( 2017- 2018).pdf · uploaded 23 Feb 2024Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 (2018-2019).pdf · uploaded 23 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 (2022-2023).pdf · uploaded 23 Feb 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (31-12-2017).pdf · uploaded 27 Feb 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (31-03-2018).pdf · uploaded 27 Feb 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (11-10-2019).pdf · uploaded 27 Feb 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (15-02-2020).pdf · uploaded 27 Feb 2024Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (06-08-2021).pdf · uploaded 27 Feb 2024Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (11-11-2021).pdf · uploaded 27 Feb 2024Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (18-05-2022).pdf · uploaded 27 Feb 2024Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (04-10-2022).pdf · uploaded 27 Feb 2024Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (31-12-2023).pdf · uploaded 27 Feb 2024Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (31-03-2023).pdf · uploaded 27 Feb 2024Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 (20-06-2023).pdf · uploaded 27 Feb 2024Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (30-09-2023).pdf · uploaded 27 Feb 2024Source
  • 3 Disclosure of sold/ booked inventory30-03-2023_11zon.pdf · uploaded 2 Mar 2024Source
  • 4 Disclosure of sold/ booked inventory30-06-2023_11zon.pdf · uploaded 2 Mar 2024Source
  • 5 Disclosure of sold/ booked inventory30-09-2023_11zon.pdf · uploaded 2 Mar 2024Source
  • 6 Disclosure of sold/ booked inventory31-12-2023_11zon.pdf · uploaded 2 Mar 2024Source
  • 7 Disclosure of sold/ booked inventory(Sold unsold) 30-03-2023_compressed.pdf · uploaded 6 Mar 2024Source
  • 8 Disclosure of sold/ booked inventory(Sold unsold) 30062023 _compressed.pdf · uploaded 6 Mar 2024Source
  • 9 Disclosure of sold/ booked inventory(Sold Unsold) 30-09-2023_compressed.pdf · uploaded 6 Mar 2024Source
  • 10 Disclosure of sold/ booked inventory(Sold unsold) 30-01-2024 _compressed.pdf · uploaded 6 Mar 2024Source
  • 2 Declaration in FORM B5 (12).pdf · uploaded 13 Mar 2024Source
  • 16 Certificates of CA (Form 3)Form 3 31-12-2023_compressed.pdf · uploaded 13 Mar 2024Source
  • 17 Certificates of CA (Form 3)Form 3 30-06-2023_compressed.pdf · uploaded 13 Mar 2024Source
  • 18 Certificates of CA (Form 3)Form 3 30-06-2022_compressed.pdf · uploaded 13 Mar 2024Source
  • 19 Certificates of CA (Form 3)Form 3 31-03-20_compressed.pdf · uploaded 13 Mar 2024Source
  • 20 Certificates of CA (Form 3)Form 3 30-09-2023_compressed.pdf · uploaded 13 Mar 2024Source
  • 21 Certificates of CA (Form 3)Form 3 31-03-2018_compressed.pdf · uploaded 13 Mar 2024Source
  • 22 Certificates of CA (Form 3)Form 3 31-03-2017_compressed.pdf · uploaded 13 Mar 2024Source
  • 23 Certificates of CA (Form 3)Form 3 31-03-2021_compressed.pdf · uploaded 13 Mar 2024Source
  • 24 Certificates of CA (Form 3)Form 3 31-03-2019_compressed.pdf · uploaded 13 Mar 2024Source
  • 25 Certificates of CA (Form 3)Form 3 31-03-2023_compressed.pdf · uploaded 13 Mar 2024Source
  • 26 Certificates of CA (Form 3)Form 3 31-03-2022_compressed.pdf · uploaded 13 Mar 2024Source
  • 27 Certificates of CA (Form 3)Form 3 31-12-2022 (1)_compressed.pdf · uploaded 13 Mar 2024Source
  • 28 Certificates of CA (Form 3)Form 3 31-12-2021_compressed.pdf · uploaded 13 Mar 2024Source
  • 29 Certificates of CA (Form 3)form 3 sushila complex.pdf · uploaded 25 Mar 2024Source

Technical

  • DocumentAppruval plan (2).pdf · uploaded 29 Jul 2017Source
  • DocumentAppruval plan.pdf · uploaded 29 Jul 2017Source
  • DocumentAppruval plan.pdf · uploaded 29 Jul 2017Source

Technical (Architect)

  • DocumentForm 1 (30-09-2023).pdf · uploaded 27 Feb 2024Source

Technical (Engineer)

  • DocumentForm 2 (31122023)_11zon.pdf · uploaded 21 Feb 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Baramati (M Cl), Baramati taluka

Survey, CTS, gat or plot numbers

145

Boundaries

North
Niira Road
South
Gvoerment
East
Gunavadi Road
West
146

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKanhekar Prakash—