Sushila Complex
Certificate SignedBaramati (M Cl), Pune 413102 |Promoter: Sushila Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- Office, Room, Shop114 units in all
- Address
- 145PIN 413102
- Designated bank account
- 21
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 2 years
The latest completion date on record passed 1 year and 10 months ago.
- Registered
- 31 Aug 2017
- Promised
- 30 Dec 2022
- Revised
- 31 Dec 2024
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100010493 | 31 Aug 2017 | 30 Dec 2022 | 31 Dec 2024 | Sushila Developers | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Sushila Complex | 6 | 114 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
18 of 114 units booked (16%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office | 9.18 sq m · 99 sq ft | 3 | 0 |
| Office | 10.48 sq m · 113 sq ft | 1 | 0 |
| Office | 16.95 sq m · 182 sq ft | 1 | 0 |
| Office | 16.98 sq m · 183 sq ft | 1 | 0 |
| Office | 17.04 sq m · 183 sq ft | 1 | 0 |
| Office | 20.03 sq m · 216 sq ft | 24 | 0 |
| Office | 20.04 sq m · 216 sq ft | 1 | 0 |
| Office | 21.16 sq m · 228 sq ft | 3 | 0 |
Show all 25 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office | 21.17 sq m · 228 sq ft | 1 | 0 |
| Office | 23.08 sq m · 248 sq ft | 1 | 0 |
| Office | 24.56 sq m · 264 sq ft | 1 | 0 |
| Room | 10.65 sq m · 115 sq ft | 1 | 0 |
| Room | 15.05 sq m · 162 sq ft | 1 | 0 |
| Room | 19.68 sq m · 212 sq ft | 1 | 0 |
| Room | 20 sq m · 215 sq ft | 16 | 0 |
| Room | 23.22 sq m · 250 sq ft | 3 | 0 |
| Shop | 8.32 sq m · 90 sq ft | 1 | 0 |
| Shop | 10.62 sq m · 114 sq ft | 1 | 0 |
| Shop | 12.47 sq m · 134 sq ft | 1 | 0 |
| Shop | 12.81 sq m · 138 sq ft | 32 | 9 |
| Shop | 14.86 sq m · 160 sq ft | 8 | 7 |
| Shop | 16.32 sq m · 176 sq ft | 1 | 0 |
| Shop | 16.59 sq m · 179 sq ft | 2 | 0 |
| Shop | 16.89 sq m · 182 sq ft | 4 | 1 |
| Shop | 19.25 sq m · 207 sq ft | 4 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 120 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD.pdf · uploaded 29 Jul 2017Source
Legal
Show all 122 documentsShow fewer documents
Migrated
- 1 Details of encumbrancesEncumdra.pdf · uploaded 29 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)Appruval plan.pdf · uploaded 29 Jul 2017Source
- 1 Building Plan Approval (IOD)Appruval plan (2).pdf · uploaded 29 Jul 2017Source
- 2 Building Plan Approval (IOD)Appruval plan.pdf · uploaded 29 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMIS MENT.pdf · uploaded 29 Jul 2017Source
- 1 Declaration in FORM BDECLETION.pdf · uploaded 29 Jul 2017Source
- 1 Proforma of Allotment letterALLOTMENT.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH 01.pdf · uploaded 30 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Enn CIRTIFICATE.PDF · uploaded 31 Jul 2017Source
- 1 Certificates of CA (Form 3)CERTIFICATS.pdf · uploaded 31 Jul 2017Source
- 1 Declaration about Commencement CertificateBaramati Nagar Par 001.pdf · uploaded 11 Jan 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200227813923_For_Asset_Based_Search_10_01_2022_21_43_25_339.pdf · uploaded 11 Jan 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)sushila - 1 001.pdf · uploaded 14 Jan 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)SUSHILA- 2020-2021 001.pdf · uploaded 14 Jan 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FY 2018-19.pdf · uploaded 14 Jan 2022Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FY2018-19.pdf · uploaded 14 Jan 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FY2019-20.pdf · uploaded 14 Jan 2022Source
- 2 Proforma of Allotment letter1 Proforma of the allotment letter and agreement for sale.pdf · uploaded 14 Jan 2022Source
- 3 Proforma of Allotment letterSHREE KARPE RAAM BABURAO (1).pdf · uploaded 14 Jan 2022Source
- 4 Proforma of Allotment letterMAngesh Popat Dalavi 1.pdf · uploaded 14 Jan 2022Source
- 5 Proforma of Allotment letterPrashant Satav (1).pdf · uploaded 14 Jan 2022Source
- 6 Proforma of Allotment letterZakir Shaikh (2).pdf · uploaded 14 Jan 2022Source
- 7 Proforma of Allotment letterShrikant Zore (1).pdf · uploaded 14 Jan 2022Source
- 8 Proforma of Allotment letterPravin Salunkhe (1).pdf · uploaded 14 Jan 2022Source
- 9 Proforma of Allotment letterPradip Salunke (1).pdf · uploaded 14 Jan 2022Source
- 10 Proforma of Allotment letterSHREE KARPE RAAM BABURAO.pdf · uploaded 14 Jan 2022Source
- 11 Proforma of Allotment letterBHARAT SATE_merged (1).pdf · uploaded 14 Jan 2022Source
- 12 Proforma of Allotment letterRAVINDRA MATHRE.pdf · uploaded 14 Jan 2022Source
- 13 Proforma of Allotment letterUddav Bhavar (1).pdf · uploaded 14 Jan 2022Source
- 14 Proforma of Allotment letterShrirang Jadhav (1).pdf · uploaded 14 Jan 2022Source
- 15 Proforma of Allotment lettersANTOSH bARATE (1).pdf · uploaded 14 Jan 2022Source
- 1 Disclosure of sold/ booked inventoryKaagaz_20220114_190906068424.pdf · uploaded 15 Jan 2022Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Cert.pdf · uploaded 2 Nov 2022Source
- 2 Disclosure of sold/ booked inventoryDiscolsure Of Sold Unsold final.pdf · uploaded 2 Nov 2022Source
- 2 Certificates of CA (Form 3)CA CER- 2-11-2022 001.pdf · uploaded 2 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM-5 20-21.pdf · uploaded 18 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 21-22 (2).pdf · uploaded 18 Nov 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentSushila Developers Commencement certificate _compressed.pdf · uploaded 8 Feb 2024Source
- 2 Declaration about Commencement CertificateSKM_C226i24020913041_0001.pdf · uploaded 9 Feb 2024Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (311217) _11zon.pdf · uploaded 21 Feb 2024Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 ( 31032018)_11zon.pdf · uploaded 21 Feb 2024Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 ( 31032019)_11zon.pdf · uploaded 21 Feb 2024Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31032020)_11zon.pdf · uploaded 21 Feb 2024Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31032021)_11zon.pdf · uploaded 21 Feb 2024Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (311221)_11zon.pdf · uploaded 21 Feb 2024Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31032022)_11zon.pdf · uploaded 21 Feb 2024Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (30062022)_11zon.pdf · uploaded 21 Feb 2024Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (30092022)_11zon.pdf · uploaded 21 Feb 2024Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31122022)_11zon.pdf · uploaded 21 Feb 2024Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31032023)_11zon.pdf · uploaded 21 Feb 2024Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (30062023)_11zon.pdf · uploaded 21 Feb 2024Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (30092023)_11zon.pdf · uploaded 21 Feb 2024Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 (31122023)_11zon.pdf · uploaded 21 Feb 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2 ( 31032019)_11zon.pdf · uploaded 21 Feb 2024Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A (2017 -18).pdf · uploaded 21 Feb 2024Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A (2018-19).pdf · uploaded 21 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A (2021-22).pdf · uploaded 21 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A (2022-23).pdf · uploaded 21 Feb 2024Source
- 3 Certificates of CA (Form 3)Form 3 (31-03-2017)_11zon.pdf · uploaded 23 Feb 2024Source
- 4 Certificates of CA (Form 3)Form 3 (31-03-2018)_11zon.pdf · uploaded 23 Feb 2024Source
- 5 Certificates of CA (Form 3)Form 3 (31-03-2019)_11zon.pdf · uploaded 23 Feb 2024Source
- 6 Certificates of CA (Form 3)Form 3 (31-03-20)_11zon.pdf · uploaded 23 Feb 2024Source
- 7 Certificates of CA (Form 3)Form 3 (31-03-2021)_11zon.pdf · uploaded 23 Feb 2024Source
- 8 Certificates of CA (Form 3)Form 3 (31-12-2021)_11zon.pdf · uploaded 23 Feb 2024Source
- 9 Certificates of CA (Form 3)Form 3 (31-03-2022)_11zon.pdf · uploaded 23 Feb 2024Source
- 10 Certificates of CA (Form 3)Form 3 (30-06-2022)_11zon.pdf · uploaded 23 Feb 2024Source
- 11 Certificates of CA (Form 3)Form 3 (31-12-2022)_11zon.pdf · uploaded 23 Feb 2024Source
- 12 Certificates of CA (Form 3)Form 3 (31-03-2023)_11zon.pdf · uploaded 23 Feb 2024Source
- 13 Certificates of CA (Form 3)Form 3 (30-06-2023)_11zon.pdf · uploaded 23 Feb 2024Source
- 14 Certificates of CA (Form 3)Form 3 (30-09-2023)_11zon.pdf · uploaded 23 Feb 2024Source
- 15 Certificates of CA (Form 3)Form 3 (31-12-2023)_11zon.pdf · uploaded 23 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form 5 ( 2017- 2018).pdf · uploaded 23 Feb 2024Source
- 3 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 (2018-2019).pdf · uploaded 23 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 (2022-2023).pdf · uploaded 23 Feb 2024Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (31-12-2017).pdf · uploaded 27 Feb 2024Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (31-03-2018).pdf · uploaded 27 Feb 2024Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (11-10-2019).pdf · uploaded 27 Feb 2024Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (15-02-2020).pdf · uploaded 27 Feb 2024Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (06-08-2021).pdf · uploaded 27 Feb 2024Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (11-11-2021).pdf · uploaded 27 Feb 2024Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (18-05-2022).pdf · uploaded 27 Feb 2024Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (04-10-2022).pdf · uploaded 27 Feb 2024Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (31-12-2023).pdf · uploaded 27 Feb 2024Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (31-03-2023).pdf · uploaded 27 Feb 2024Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 (20-06-2023).pdf · uploaded 27 Feb 2024Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 (30-09-2023).pdf · uploaded 27 Feb 2024Source
- 3 Disclosure of sold/ booked inventory30-03-2023_11zon.pdf · uploaded 2 Mar 2024Source
- 4 Disclosure of sold/ booked inventory30-06-2023_11zon.pdf · uploaded 2 Mar 2024Source
- 5 Disclosure of sold/ booked inventory30-09-2023_11zon.pdf · uploaded 2 Mar 2024Source
- 6 Disclosure of sold/ booked inventory31-12-2023_11zon.pdf · uploaded 2 Mar 2024Source
- 7 Disclosure of sold/ booked inventory(Sold unsold) 30-03-2023_compressed.pdf · uploaded 6 Mar 2024Source
- 8 Disclosure of sold/ booked inventory(Sold unsold) 30062023 _compressed.pdf · uploaded 6 Mar 2024Source
- 9 Disclosure of sold/ booked inventory(Sold Unsold) 30-09-2023_compressed.pdf · uploaded 6 Mar 2024Source
- 10 Disclosure of sold/ booked inventory(Sold unsold) 30-01-2024 _compressed.pdf · uploaded 6 Mar 2024Source
- 2 Declaration in FORM B5 (12).pdf · uploaded 13 Mar 2024Source
- 16 Certificates of CA (Form 3)Form 3 31-12-2023_compressed.pdf · uploaded 13 Mar 2024Source
- 17 Certificates of CA (Form 3)Form 3 30-06-2023_compressed.pdf · uploaded 13 Mar 2024Source
- 18 Certificates of CA (Form 3)Form 3 30-06-2022_compressed.pdf · uploaded 13 Mar 2024Source
- 19 Certificates of CA (Form 3)Form 3 31-03-20_compressed.pdf · uploaded 13 Mar 2024Source
- 20 Certificates of CA (Form 3)Form 3 30-09-2023_compressed.pdf · uploaded 13 Mar 2024Source
- 21 Certificates of CA (Form 3)Form 3 31-03-2018_compressed.pdf · uploaded 13 Mar 2024Source
- 22 Certificates of CA (Form 3)Form 3 31-03-2017_compressed.pdf · uploaded 13 Mar 2024Source
- 23 Certificates of CA (Form 3)Form 3 31-03-2021_compressed.pdf · uploaded 13 Mar 2024Source
- 24 Certificates of CA (Form 3)Form 3 31-03-2019_compressed.pdf · uploaded 13 Mar 2024Source
- 25 Certificates of CA (Form 3)Form 3 31-03-2023_compressed.pdf · uploaded 13 Mar 2024Source
- 26 Certificates of CA (Form 3)Form 3 31-03-2022_compressed.pdf · uploaded 13 Mar 2024Source
- 27 Certificates of CA (Form 3)Form 3 31-12-2022 (1)_compressed.pdf · uploaded 13 Mar 2024Source
- 28 Certificates of CA (Form 3)Form 3 31-12-2021_compressed.pdf · uploaded 13 Mar 2024Source
- 29 Certificates of CA (Form 3)form 3 sushila complex.pdf · uploaded 25 Mar 2024Source
Technical
Technical (Architect)
- DocumentForm 1 (30-09-2023).pdf · uploaded 27 Feb 2024Source
Technical (Engineer)
- DocumentForm 2 (31122023)_11zon.pdf · uploaded 21 Feb 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Baramati (M Cl), Baramati taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Niira Road
- South
- Gvoerment
- East
- Gunavadi Road
- West
- 146
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Kanhekar Prakash | — |
Source: MahaRERA project page. Contact details are not shown.