Westfield 3
Certificate SignedBaner, Pune 411045 |Promoter: Grd Infraprojects Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- Office space, Residential Office, Shop42 units in all
- Address
- S No 3 2 1 2, 3 2 1 1, Balewadi road, BalewadiPIN 411045
- Designated bank account
- 171
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 3 Nov 2020
- Promised
- 31 Dec 2026
- Revised
- 30 Apr 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100026904 | 3 Nov 2020 | 31 Dec 2026 | 30 Apr 2027 | Grd Infraprojects Private Limited | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Westfield 03 | 5 | 42 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
12 of 42 units booked (29%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 37.88 sq m · 408 sq ft | 5 | 2 |
| Office space | 41.96 sq m · 452 sq ft | 5 | 2 |
| Office space | 55.11 sq m · 593 sq ft | 5 | 1 |
| Office space | 59.91 sq m · 645 sq ft | 5 | 0 |
| Office space | 64.19 sq m · 691 sq ft | 5 | 2 |
| Office space | 70.83 sq m · 762 sq ft | 1 | 0 |
| Residential Office | 46.25 sq m · 498 sq ft | 5 | 3 |
| Residential Office | 70.84 sq m · 763 sq ft | 4 | 1 |
Show all 15 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Shop | 24.55 sq m · 264 sq ft | 1 | 0 |
| Shop | 42.35 sq m · 456 sq ft | 1 | 0 |
| Shop | 43.32 sq m · 466 sq ft | 1 | 0 |
| Shop | 50 sq m · 538 sq ft | 1 | 0 |
| Shop | 52.01 sq m · 560 sq ft | 1 | 0 |
| Shop | 56.77 sq m · 611 sq ft | 1 | 1 |
| Shop | 58.16 sq m · 626 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 149 filings listed on MahaRERA's project page
Finance
- PAN CardGRD PAN CARD.pdf · uploaded 24 Oct 2020Source
Legal
- Declaration Form BForm B Ganpat Wadekar.pdf · uploaded 27 Oct 2020Source
- Declaration Form BForm B Abhay Kodgire.pdf · uploaded 27 Oct 2020Source
- Declaration Form BForm B Gaurav Attarde.pdf · uploaded 27 Oct 2020Source
- Declaration Form BForm B Sandeep Choudhari.pdf · uploaded 27 Oct 2020Source
- Legal Title reportLegal Title Report_Highlighted.pdf · uploaded 30 Oct 2020Source
- Other – LegalConsent Letter Promoter - Enclosed format.pdf · uploaded 7 Jun 2023Source
Show all 150 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardGRD PAN CARD.pdf · uploaded 24 Oct 2020Source
- 1 Details of encumbrancesNo Emcumbrance .pdf · uploaded 27 Oct 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentSanction plan I_compressed.pdf · uploaded 27 Oct 2020Source
- 2 Building Plan Approval / NA Order for plotted developmentSanction plan II_compressed.pdf · uploaded 27 Oct 2020Source
- 1 Declaration in FORM BForm B Ganpat Wadekar.pdf · uploaded 27 Oct 2020Source
- 2 Declaration in FORM BForm B Abhay Kodgire.pdf · uploaded 27 Oct 2020Source
- 3 Declaration in FORM BForm B Gaurav Attarde.pdf · uploaded 27 Oct 2020Source
- 4 Declaration in FORM BForm B Sandeep Choudhari.pdf · uploaded 27 Oct 2020Source
- 1 Proforma of Allotment letterDraft Agreement for Sale (2)-3-20.pdf · uploaded 27 Oct 2020Source
- 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 27 Oct 2020Source
- 1 Copy of the legal title reportLegal Title Report_Highlighted.pdf · uploaded 30 Oct 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement certificate 1_Highlighted.pdf · uploaded 30 Oct 2020Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement certificate II_Highlighted.pdf · uploaded 30 Oct 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 updated.pdf · uploaded 30 Oct 2020Source
- 1 Copy of Layout Approval (in case of layout)Sanction plan III_compressed.pdf · uploaded 31 Oct 2020Source
- 2 Copy of Layout Approval (in case of layout)Revised Sanction plan III (1).pdf · uploaded 5 Apr 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentRevised Sanction plan I_compressed (1) (1).pdf · uploaded 5 Apr 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentRevised Sanction plan II (1).pdf · uploaded 5 Apr 2022Source
- 3 Commencement Certificates / NA Order for plotted developmentRevised CC4141-21.pdf · uploaded 5 Apr 2022Source
- 1 Declaration about Commencement CertificateWestfield 03 DECLARATION ABOUT COMMENCEMNT CERTIFICATE-compressed.pdf · uploaded 16 Jun 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Westfield 03 Architecture Certificate Of Rera-compressed.pdf · uploaded 16 Jun 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Westfield 03 Quality Assurance Certificate.pdf · uploaded 16 Jun 2022Source
- 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 16 Jun 2022Source
- 1 Disclosure of sold/ booked inventoryWestfield 03 Discloser for sold unlsold invetory compressed.pdf · uploaded 16 Jun 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Final Rera Form-3_compressed.pdf · uploaded 2 Jul 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Signed Form-5.pdf · uploaded 2 Jul 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3 Westfield - 3.pdf · uploaded 29 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Signed Form 5_Westfield 3 GRD Infraprojects PVT LTD.pdf · uploaded 29 Nov 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Q3 (Westfield- 03).pdf · uploaded 16 Feb 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - 3 (Q3).pdf · uploaded 26 Feb 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Westfield 3 (Dec-2022).pdf · uploaded 27 Feb 2023Source
- 2 Disclosure of sold/ booked inventoryPromoter Disclosure 3, Q3.pdf · uploaded 28 Feb 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Q3 (Westfield- 03) Revised.pdf · uploaded 28 Feb 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentFinal Revised Sanction Plan Dt 29-03-2023 - 01_compressed.pdf · uploaded 3 May 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentFinal Revised Sanction Plan Dt 29-03-2023 - 02_compressed.pdf · uploaded 3 May 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentFinal Revised Sanction Plan Dt 29-03-2023 - 03_compressed.pdf · uploaded 3 May 2023Source
- 4 Commencement Certificates / NA Order for plotted developmentW03 Final Commencement certificate 29-03-2023.pdf · uploaded 3 May 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Westfield 03 Architect Certificate - Form 1.pdf · uploaded 3 May 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Westfield 03 engineer certificate form 2 31-Mar-2023.pdf · uploaded 3 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineers Certificate on Quality Assurance.pdf · uploaded 15 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Annual Audit Report of Statutory.pdf · uploaded 15 May 2023Source
- 1 Other – TechnicalRevised Highlited Plan.pdf · uploaded 17 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)W03 Form 2A FY 21-22.pdf · uploaded 18 May 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineer certificate - Form 2A (FY 2022-23).pdf · uploaded 18 May 2023Source
- 3 Disclosure of sold/ booked inventoryPromoters Declaration - W 03 Q4.pdf · uploaded 19 May 2023Source
- 2 Declaration about Commencement CertificatePromoters Declaration - W 03 Q4.pdf · uploaded 20 May 2023Source
- 3 Declaration about Commencement CertificateDeclaration About Commencement Certificate - Westfield 3.pdf · uploaded 20 May 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Q4 (Westfield- 3).pdf · uploaded 22 May 2023Source
- 2 a Details of encumbrances concerned to FinanceGetUserDocumentFileContent.pdf · uploaded 7 Jun 2023Source
- 1 b Details of encumbrances concerned to LegalGetUserDocumentFileContent.pdf · uploaded 7 Jun 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentRevised Highlited Plan page no-1.pdf · uploaded 7 Jun 2023Source
- 1 Other – LegalConsent Letter Promoter - Enclosed format.pdf · uploaded 7 Jun 2023Source
- 2 Other – LegalAllottees Consent - FSI Changes.pdf · uploaded 13 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer certificate - Form 2A (FY 2022-23).pdf · uploaded 16 Jun 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Form 1 Final.pdf · uploaded 11 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1 Q1.pdf · uploaded 2 Aug 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Form 2 W3.pdf · uploaded 2 Aug 2023Source
- 4 Disclosure of sold/ booked inventoryPromoter Disclosure Q1 W3.pdf · uploaded 2 Aug 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Q1 (Westfield- 3).pdf · uploaded 2 Aug 2023Source
- 4 Declaration about Commencement CertificateDeclaration About Commencement Certificate - Westfield 3.pdf · uploaded 25 Sep 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Q1 (Westfield- 3).pdf · uploaded 25 Sep 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Westfield 03 RERA quarterly update Architect Certificate - Form 1 30-09-2023.pdf · uploaded 9 Nov 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate - Form 2 Westfield 03 Dt 30-09-2023.pdf · uploaded 9 Nov 2023Source
- 5 Disclosure of sold/ booked inventoryWestfield 03 Dicloser List Sold and unsold Dt 30-09-2023.pdf · uploaded 9 Nov 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q2 (Westfield 3).pdf · uploaded 24 Nov 2023Source
- 2 CERSAI detailsCERSAI_Search_Report_200296098993_For_Asset_Based_Search_07_02_2024_15_07_41_165.pdf · uploaded 8 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Annual Audit (W 3) FY 2022-23.pdf · uploaded 14 Feb 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Westfield 3 Form 2 Engineer Certificate Q 3.pdf · uploaded 6 Mar 2024Source
- 6 Disclosure of sold/ booked inventoryPromoters Disclosure unit wise Westfield 03 Q3.pdf · uploaded 6 Mar 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3- FY 23-24 Q3 Westfield 3.pdf · uploaded 6 Mar 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form -1 Architech Certificate Westfield 3 Q3 FY 2023-24.pdf · uploaded 7 Mar 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 FY 23-24 Q4 W03.pdf · uploaded 20 May 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 FY 23-24 Q4 W-03.pdf · uploaded 20 May 2024Source
- 7 Disclosure of sold/ booked inventoryPromoter Disclosure FY23-24 Q4 W-03.pdf · uploaded 20 May 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 23-24 Q4 W-3.pdf · uploaded 27 May 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 FY 2024-25 Q1.pdf · uploaded 30 Jul 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Fy 2024-25 Q1.pdf · uploaded 30 Jul 2024Source
- 8 Disclosure of sold/ booked inventoryPromoter Disclosure FY 2024-25 Q1.pdf · uploaded 30 Jul 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 FY 2024-25Q1 W-03.pdf · uploaded 30 Jul 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 WF 03.pdf · uploaded 24 Dec 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Westfield 03- Engg certificate.pdf · uploaded 24 Dec 2024Source
- 1 Disclosure of sold/ booked inventorySold WF 03.pdf · uploaded 24 Dec 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2 A.pdf · uploaded 24 Dec 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)20241225161424.pdf · uploaded 25 Dec 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)WF 3 FORM 5.pdf · uploaded 27 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's Certificate Westfield 03.pdf · uploaded 20 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 2024-25 WF 03.pdf · uploaded 20 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3 2024-25 WF 03.pdf · uploaded 20 Feb 2025Source
- 1 Declaration in FORM BFORM B.pdf · uploaded 25 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)WF 03 Form 1.pdf · uploaded 25 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 25 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 25 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of soldBooked Inventory.pdf · uploaded 25 Apr 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT A BANK DECLARATION.pdf · uploaded 25 Apr 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE.pdf · uploaded 25 Apr 2025Source
- 2 Disclosure of Interest in Other Real Estate Organizations2 DISCLOUSRE.pdf · uploaded 25 Apr 2025Source
- Form 112 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 11 Oct 2025Source
- Form 2WF FORM 2 OLD.pdf · uploaded 11 Oct 2025Source
- Form 3WF 03 OLD.pdf · uploaded 11 Oct 2025Source
- Disclosure of Sold and Booked InventoryWF 3 SOLD UNSOLD.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 112 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 1WF 03 FORM-1 APR TO JUNE.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 1WF 03 Form 1 JULLY - SEPT.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 1WF 03 Form 1 JULLY - SEPT.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 2WF FORM 2 OLD.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 2WF 03 Form 2 APRIL JUNE.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 2WF 03 Form 2 JULY-SEP.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 2WF 03 Form 2 JULY-SEP.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 3WF 03 OLD.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 3Form 3 - WF 03 - APRIL- JUNE.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 3Form 3 - WF 03 - APRIL- JUNE.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 3WF 03 Form 3 JULY-SEP.pdf · uploaded 11 Oct 2025Source
- Withdrawal Update Form 1Q3 Form 1 Westfield 03 2026.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 2Q3 Form 2 Wsetfield 03 2026.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 3Q3 Form 3 Wsetfield 03 2026.pdf · uploaded 31 Jan 2026Source
- Withdrawal Update Form 1Westfield 03 - Form 1 FY25-26 Q4_page-0001.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 2Westfield 03 - Form 2 FY25-26 Q4_page-0001.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 3Form 3 - Westfield 03.pdf · uploaded 7 May 2026Source
- Withdrawal Update Form 1Form 1 - Westfield 03.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 2Form 2 - Westfield 3.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 3F 3 - WESTFIELD - 03-..pdf · uploaded 27 Jul 2026Source
Technical
- DocumentSanction plan I_compressed.pdf · uploaded 27 Oct 2020Source
- DocumentSanction plan II_compressed.pdf · uploaded 27 Oct 2020Source
- DocumentSanction plan III_compressed.pdf · uploaded 31 Oct 2020Source
- DocumentRevised Sanction plan I_compressed (1) (1).pdf · uploaded 5 Apr 2022Source
- DocumentRevised Sanction plan II (1).pdf · uploaded 5 Apr 2022Source
- DocumentRevised Sanction plan III (1).pdf · uploaded 5 Apr 2022Source
- DocumentFinal Revised Sanction Plan Dt 29-03-2023 - 01_compressed.pdf · uploaded 3 May 2023Source
- DocumentFinal Revised Sanction Plan Dt 29-03-2023 - 02_compressed.pdf · uploaded 3 May 2023Source
- DocumentFinal Revised Sanction Plan Dt 29-03-2023 - 03_compressed.pdf · uploaded 3 May 2023Source
- Other – TechnicalRevised Highlited Plan.pdf · uploaded 17 May 2023Source
- DocumentRevised Highlited Plan page no-1.pdf · uploaded 7 Jun 2023Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Baner, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- S no 3P
- South
- S no 3P
- East
- S no 3P
- West
- Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Auron Designs | — |
| Chartered accountant | CA Sunil Shejhal | — |
| Chartered accountant | Snehal G Patil | — |
| Chartered accountant | V S A P & Company | — |
| Engineer | Anil Bawaskar | — |
| Engineer | JRCC Consultants LLP | — |
| Engineer | Pranav Manoj Khalate | — |
Source: MahaRERA project page. Contact details are not shown.