Business Hub
Certificate SignedBaner, Pune 411045 |Promoter: Rajendra Venkat Reddy
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1, 1BHK, 2BHK, Office space20 units in all
- Address
- Sr No 140-1, Jupitar Hospial, BanerPIN 411045
- Designated bank account
- 88
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
2 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| 5 Feb 2026 | Primary sale | ≈ ₹1.12 Cr | ≈ ₹16,345 | ||
| 19 Jan 2026 | Title transfer | ≈ ₹10,000 | — |
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 27 Jul 2028
- Registered
- 9 Nov 2022
- Promised
- 27 Jul 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100047555 | 9 Nov 2022 | 27 Jul 2028 | 27 Jul 2028 | Rajendra Venkat Reddy | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Business HUB | 3 | 20 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
7 of 20 units booked (35%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1 | 353.44 sq m · 3,804 sq ft | 2 | 1 |
| 1BHK | 252.37 sq m · 2,716 sq ft | 2 | 0 |
| 2BHK | 252.37 sq m · 2,716 sq ft | 1 | 0 |
| Office space | 1,677.97 sq m · 18,062 sq ft | 15 | 6 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 163 filings listed on MahaRERA's project page
Finance
- PAN CardPAN CARD rajedra reddy.pdf · uploaded 30 Aug 2022Source
Legal
Migrated
- 1 Copy of the legal title reportLegal Title Report_compressed.pdf · uploaded 18 Jul 2022Source
- 1 Copy of Layout Approval (in case of layout)Approved Layout_compressed.pdf · uploaded 18 Jul 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval (IOD)_compressed.pdf · uploaded 18 Jul 2022Source
Show all 164 documentsShow fewer documents
Migrated
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 18 Jul 2022Source
- 1 Declaration about Commencement CertificateDeclaration for Commencement.pdf · uploaded 18 Jul 2022Source
- 1 Declaration in FORM BForm-B Affidavit_compressed.pdf · uploaded 18 Jul 2022Source
- 1 Other – LegalCourt Case Paper.pdf · uploaded 18 Jul 2022Source
- 1 b Details of encumbrances concerned to LegalLegal Encumbrance.pdf · uploaded 4 Aug 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form-3 for Registration Compressed (1).pdf · uploaded 4 Aug 2022Source
- 1 CERSAI detailsFinal Cersai Report.pdf · uploaded 25 Aug 2022Source
- 1 PAN CardPAN CARD rajedra reddy.pdf · uploaded 30 Aug 2022Source
- 1 a Details of encumbrances concerned to FinanceFinance Encumbrance.pdf · uploaded 6 Sep 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK DECLARATION 050922.pdf · uploaded 6 Sep 2022Source
- 1 Proforma of Agreement for saleALLOTMENT LETTER_11zon.pdf · uploaded 20 Oct 2022Source
- 1 Proforma of Allotment letterALLOTMENT LETTER_11zon.pdf · uploaded 20 Oct 2022Source
- 2 Proforma of Allotment letterDRAFT AGREEMENT(RERA) (1).pdf · uploaded 20 Oct 2022Source
- 2 Proforma of Agreement for saleDRAFT AGREEMENT(RERA) (1).pdf · uploaded 20 Oct 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation For Allotment Letter.pdf · uploaded 20 Oct 2022Source
- 1 Deviation Report with respect to model copy of AgreementDeviation for Agreement for sale.pdf · uploaded 20 Oct 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentRERA PLAN 130423.pdf · uploaded 20 May 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentRERA PLAN 130423.pdf · uploaded 20 May 2023Source
- 2 Commencement Certificates / NA Order for plotted development140-commement 130423.pdf · uploaded 20 May 2023Source
- 2 Copy of Layout Approval (in case of layout)3- COMMECEMNT CERTFICATE_compressed.pdf · uploaded 16 Mar 2024Source
- 4 Building Plan Approval / NA Order for plotted development2-140-PLAN DT 14-2-24_compressed.pdf · uploaded 16 Mar 2024Source
- 5 Building Plan Approval / NA Order for plotted development2-140-PLAN DT 14-2-24_compressed.pdf · uploaded 16 Mar 2024Source
- 6 Building Plan Approval / NA Order for plotted development1-140-PLAN DT 14-02-24_compressed.pdf · uploaded 16 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted development3- COMMECEMNT CERTFICATE_compressed.pdf · uploaded 16 Mar 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBUSINES HUB BANK DECLATION FOR RERA.pdf · uploaded 16 Mar 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4 22-23.pdf · uploaded 6 Mar 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q1 23-24.pdf · uploaded 6 Mar 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2 23-24.pdf · uploaded 6 Mar 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3 23-24.pdf · uploaded 6 Mar 2025Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q4 23-24.pdf · uploaded 6 Mar 2025Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q1 24-25.pdf · uploaded 6 Mar 2025Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q2 24-25.pdf · uploaded 6 Mar 2025Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3 24-25.pdf · uploaded 6 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q3 22-23.pdf · uploaded 6 Mar 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q4 FY 2023-24.pdf · uploaded 6 Mar 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 FY 2024-25.pdf · uploaded 6 Mar 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q2 FY 2024-25.pdf · uploaded 6 Mar 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1 FY 2024-25.pdf · uploaded 6 Mar 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 FY 2023-24.pdf · uploaded 6 Mar 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q2 FY 2023-24.pdf · uploaded 6 Mar 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q1 FY 2023-24.pdf · uploaded 6 Mar 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q4 FY 2022-23.pdf · uploaded 6 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Q3 FY 2022-23.pdf · uploaded 6 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3 22-23.pdf · uploaded 6 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4 22-23.pdf · uploaded 6 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q1 23-24.pdf · uploaded 6 Mar 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q2 23-24.pdf · uploaded 6 Mar 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3 23-24.pdf · uploaded 6 Mar 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q4 23-24.pdf · uploaded 6 Mar 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q1 24-25.pdf · uploaded 6 Mar 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q2 24-25.pdf · uploaded 6 Mar 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Q3 24-25.pdf · uploaded 6 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5_FY2022-23.pdf · uploaded 10 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5_FY2023-24.pdf · uploaded 10 Mar 2025Source
- 1 Other – TechnicalSigned RERA CONSENT LETTER - 140.pdf · uploaded 27 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect Cert- BH-31-3-25.pdf · uploaded 7 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 Q4 FY 2024-25.pdf · uploaded 7 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)engg-bh-31-3-25-business HUb.pdf · uploaded 7 May 2025Source
- Form 1architect Cert- BH-31-3-25.pdf · uploaded 31 May 2025Source
- Form 1Form 1 Q3 22-23.pdf · uploaded 9 Jun 2025Source
- Form 1Form 1 Q4 22-23.pdf · uploaded 9 Jun 2025Source
- Form 1Form 1 Q1 23-24.pdf · uploaded 9 Jun 2025Source
- Form 1Form 1 Q2 23-24.pdf · uploaded 9 Jun 2025Source
- Form 1Form 1 Q3 23-24.pdf · uploaded 9 Jun 2025Source
- Form 1Form 1 Q4 23-24.pdf · uploaded 9 Jun 2025Source
- Form 1Form 1 Q1 24-25.pdf · uploaded 9 Jun 2025Source
- Form 1Form 1 Q2 24-25.pdf · uploaded 9 Jun 2025Source
- Form 1Form 1 Q3 24-25.pdf · uploaded 9 Jun 2025Source
- Form 2Form 2 Q3 22-23.pdf · uploaded 9 Jun 2025Source
- Form 2Form 2 Q4 22-23.pdf · uploaded 9 Jun 2025Source
- Form 2Form 2 Q1 23-24.pdf · uploaded 9 Jun 2025Source
- Form 2Form 2 Q2 23-24.pdf · uploaded 9 Jun 2025Source
- Form 2Form 2 Q3 23-24.pdf · uploaded 9 Jun 2025Source
- Form 2Form 2 Q4 23-24.pdf · uploaded 9 Jun 2025Source
- Form 2Form 2 Q1 24-25.pdf · uploaded 9 Jun 2025Source
- Form 2Form 2 Q2 24-25.pdf · uploaded 9 Jun 2025Source
- Form 2Form 2 Q3 24-25.pdf · uploaded 9 Jun 2025Source
- Form 3Form 3 Q3 FY 2022-23.pdf · uploaded 9 Jun 2025Source
- Form 3Form 3 Q4 FY 2022-23.pdf · uploaded 9 Jun 2025Source
- Form 3Form 3 Q1 FY 2023-24.pdf · uploaded 9 Jun 2025Source
- Form 3Form 3 Q2 FY 2023-24.pdf · uploaded 9 Jun 2025Source
- Form 3Form 3 Q3 FY 2023-24.pdf · uploaded 9 Jun 2025Source
- Form 3Form 3 Q4 FY 2023-24.pdf · uploaded 9 Jun 2025Source
- Form 3Form 3 Q1 FY 2024-25.pdf · uploaded 9 Jun 2025Source
- Form 3Form 3 Q2 FY 2024-25.pdf · uploaded 9 Jun 2025Source
- Form 3Form 3 Q3 FY 2024-25.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold & Unsold Inventory Q3 FY 2022-23.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Sold & Unsold Inventory Q4 FY 22-23.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold & Unsold Inventory Q1 FY 23-24.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold & Unsold Inventory Q2 FY 23-24.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold & Unsold Inventory Q3 FY 23-24.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold & Unsold Inventory Q4 FY 23-24.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold & Unsold Inventory Q1 FY 24-25.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold & Unsold Inventory Q2 FY 24-25.pdf · uploaded 9 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold & Unsold Inventory Q3 FY 24-25.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressPromoter Self Declaration Form Q3 FY 2022-23.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressSelf Declaration Form Q4 FY 2022-23.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressPromoter Self Declaration Form Q1 FY 23-24.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressPromoter Self Declaration Form Q2 FY 23-24.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressPromoter Self Declaration Form Q3 FY 23-24.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressPromoter Self Declaration Form.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressPromoter Self Declaration Form.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressPromoter Self Declaration Form.pdf · uploaded 9 Jun 2025Source
- Self-declaration of Quarterly ProgressSelf-declaration-31-12-24.pdf · uploaded 9 Jun 2025Source
- Form 5 (FY 2022-2023)Business Hub Form 5 FY 2022-23-signed.pdf · uploaded 28 Aug 2025Source
- Form 2A (FY 2022-2023)FORM 2A-BH-22-23.pdf · uploaded 29 Aug 2025Source
- Form 2A (FY 2023-2024)FORM -2A-BH-23-24.pdf · uploaded 29 Aug 2025Source
- Form 2A (FY 2024-2025)FORM2A-BH-24-25.pdf · uploaded 29 Aug 2025Source
- Form 5 (FY 2023-2024)Business Hub Form 5 FY 2023-24-signed.pdf · uploaded 29 Aug 2025Source
- Withdrawal Update Form 1Annexre-1 Arch cert BH-30-6-25.pdf · uploaded 1 Sep 2025Source
- Withdrawal Update Form 2ENGG-CERT-BH-30-6-25.pdf · uploaded 1 Sep 2025Source
- Withdrawal Update Form 3Final Form 3.pdf · uploaded 1 Sep 2025Source
- Withdrawal Update Form 1Form 1_Q2_FY 2025-26.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 2Form 2_Q2_FY 2025-26.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 3Final Form 3.pdf · uploaded 18 Feb 2026Source
- Withdrawal Update Form 1Form 1_Q2_FY 2025-26.pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 2Form 2_Q2_FY 2025-26.pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 3Withdrawal Application Form 3 Q2.pdf · uploaded 27 May 2026Source
- Withdrawal Update Form 1Signed_Form1_Q3.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 1Signed_Form1_Q4.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 2Signed_Form2_Q3.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 2Signed_Form2_Q4.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 3Signed_Form3_Q3.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 3Signed_Form3_Q4.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 1Signed_Form1_Q1.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2Signed_Form2_Q1.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3Signed_Form3_Q1.pdf · uploaded 4 Aug 2026Source
Technical
- DocumentApproved Layout_compressed.pdf · uploaded 18 Jul 2022Source
- DocumentBuilding Plan Approval (IOD)_compressed.pdf · uploaded 18 Jul 2022Source
- DocumentRERA PLAN 130423.pdf · uploaded 20 May 2023Source
- DocumentRERA PLAN 130423.pdf · uploaded 20 May 2023Source
- Document3- COMMECEMNT CERTFICATE_compressed.pdf · uploaded 16 Mar 2024Source
- Document2-140-PLAN DT 14-2-24_compressed.pdf · uploaded 16 Mar 2024Source
- Document2-140-PLAN DT 14-2-24_compressed.pdf · uploaded 16 Mar 2024Source
- Document1-140-PLAN DT 14-02-24_compressed.pdf · uploaded 16 Mar 2024Source
- Other – TechnicalSigned RERA CONSENT LETTER - 140.pdf · uploaded 27 Mar 2025Source
Technical (Architect)
- DocumentForm 1 Q4 22-23.pdf · uploaded 6 Mar 2025Source
- DocumentForm 1 Q1 23-24.pdf · uploaded 6 Mar 2025Source
- DocumentForm 1 Q2 23-24.pdf · uploaded 6 Mar 2025Source
- DocumentForm 1 Q3 23-24.pdf · uploaded 6 Mar 2025Source
- DocumentForm 1 Q4 23-24.pdf · uploaded 6 Mar 2025Source
- DocumentForm 1 Q1 24-25.pdf · uploaded 6 Mar 2025Source
- DocumentForm 1 Q2 24-25.pdf · uploaded 6 Mar 2025Source
- DocumentForm 1 Q3 24-25.pdf · uploaded 6 Mar 2025Source
- Documentarchitect Cert- BH-31-3-25.pdf · uploaded 7 May 2025Source
- DocumentSigned_Form1_Q1.pdf · uploaded 4 Aug 2026Source
Technical (Engineer)
- DocumentForm 2 Q4 22-23.pdf · uploaded 6 Mar 2025Source
- DocumentForm 2 Q1 23-24.pdf · uploaded 6 Mar 2025Source
- DocumentForm 2 Q2 23-24.pdf · uploaded 6 Mar 2025Source
- DocumentForm 2 Q3 23-24.pdf · uploaded 6 Mar 2025Source
- DocumentForm 2 Q4 23-24.pdf · uploaded 6 Mar 2025Source
- DocumentForm 2 Q1 24-25.pdf · uploaded 6 Mar 2025Source
- DocumentForm 2 Q2 24-25.pdf · uploaded 6 Mar 2025Source
- DocumentForm 2 Q3 24-25.pdf · uploaded 6 Mar 2025Source
- Documentengg-bh-31-3-25-business HUb.pdf · uploaded 7 May 2025Source
- DocumentSigned_Form2_Q1.pdf · uploaded 4 Aug 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Baner, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- D P Road
- South
- Part Of S No 140-2
- East
- 20 Ft Road
- West
- Part Of Sr No 139-1
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vilas Tarawadi | — |
| Chartered accountant | CA Shriram G Somwanshi | — |
| Engineer | Deepak Kumar Singh Deepak Kumar Singh | — |
| Other | Anish Enterprises ANISH ENTERPRIES | — |
Source: MahaRERA project page. Contact details are not shown.