Crown 8
Certificate SignedBalewadi, Pune 411045 |Promoter: Pyramid Alliance LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- —122 units in all
- Address
- Survey No 8, Balewadi Gaonthan, Dasara ChowkPIN 411045
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
24 registered documents matched to this project. Consideration is the value declared in the document; the Index II opens inside Deedo.
| Registered | Unit | Type | Consideration | ₹ / sq.ft | Document |
|---|---|---|---|---|---|
| Sep 2026 | Bldg डी · Unit 1908 | Primary sale | ₹1.5–1.75 Cr | ≈ ₹14,500 | |
| Sep 2026 | Bldg डी · Unit 1006 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| Sep 2026 | Bldg डी · Unit 501 | Primary sale | ₹1.75–2 Cr | — | |
| Sep 2026 | Bldg डी · Unit 1605 | Primary sale | ₹1.5–1.75 Cr | ≈ ₹14,500 | |
| Aug 2026 | Bldg डी · Unit 608 | Primary sale | ₹1.5–1.75 Cr | ≈ ₹14,500 | |
| Jul 2026 | Bldg डी · Unit 1204 | Primary sale | ₹1.5–1.75 Cr | ≈ ₹14,000 | |
| Jun 2026 | Bldg डी · Unit 1406 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| Jun 2026 | Bldg डी · Unit 1206 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| Jun 2026 | Bldg डी · Unit 1606 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| May 2026 | Bldg डी · Unit 1801 | Primary sale | ₹1.5–1.75 Cr | ≈ ₹14,000 | |
| May 2026 | Bldg डी · Unit 705 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| May 2026 | Bldg डी · Unit 1107 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| May 2026 | Bldg डी · Unit 1404 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,000 | |
| Apr 2026 | Bldg डी · Unit 1004 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,000 | |
| Mar 2026 | Bldg डी · Unit 1104 | Primary sale | ₹1.5–1.75 Cr | ≈ ₹14,000 | |
| Mar 2026 | Bldg डी · Unit 605 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| Mar 2026 | Bldg डी · Unit 1202 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| Mar 2026 | Mortgage | — | — | ||
| Mar 2026 | Bldg डीमधील · Unit 905 | Correction | — | — | |
| Mar 2026 | Bldg डी · Unit 1407 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| Mar 2026 | Bldg डी · Unit 1506 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 | |
| Feb 2026 | Bldg डी · Unit 1301 | Primary sale | ₹1.5–1.75 Cr | ≈ ₹14,000 | |
| Jan 2026 | Bldg डी · Unit 1604 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,000 | |
| Jan 2026 | Bldg डी · Unit 1205 | Primary sale | ₹1.25–1.5 Cr | ≈ ₹12,500 |
Crown 8 in numbers
Registered deals, summarised
Deedo has 24 registered documents at Crown 8, from Jan 2026 to Sep 2026: 22 sales, 1 mortgage. The median registered sale works out to about ₹13,100 per sq ft, at a median of ₹1.48 Cr a deal; 0% of sales were resales.
- What is the price per sq ft at Crown 8?
- The median registered sale works out to about ₹13,100 per sq ft, at a median of ₹1.48 Cr a deal; 0% of sales were resales.
- How many properties have been sold at Crown 8?
- 22 sales are registered at Crown 8.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Crown 8 by Deedo, last updated with deals registered in Sep 2026.
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2030
- Registered
- 14 Mar 2024
- Promised
- 31 Dec 2030
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100055233 | 14 Mar 2024 | 31 Dec 2030 | 31 Dec 2030 | Pyramid Alliance LLP | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Crwon 8 Building D | 16 | 122 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
122 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 122 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 168 filings listed on MahaRERA's project page
Finance
- PAN CardPYRAMID ALLIANCE LLP PAN CARD (1).pdf · uploaded 30 Oct 2023Source
Legal
Migrated
- 1 PAN CardPYRAMID ALLIANCE LLP PAN CARD (1).pdf · uploaded 30 Oct 2023Source
- 1 Copy of Layout Approval (in case of layout)Sanction Layout_compressed.pdf · uploaded 30 Oct 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 30 Oct 2023Source
- 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 30 Oct 2023Source
Show all 169 documentsShow fewer documents
Migrated
- 1 Deviation Report with respect to Allotment letterDeveation Report Allotment.pdf · uploaded 30 Oct 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeveation Report Agreement to sell.pdf · uploaded 30 Oct 2023Source
- 1 Declaration in FORM BForm B.pdf · uploaded 10 Nov 2023Source
- 1 a Details of encumbrances concerned to FinanceLegal Encrumbrances.pdf · uploaded 27 Nov 2023Source
- 1 b Details of encumbrances concerned to LegalLegal Encrumbrances.pdf · uploaded 27 Nov 2023Source
- 1 CERSAI detailsCersai Report.pdf · uploaded 27 Nov 2023Source
- 2 a Details of encumbrances concerned to FinanceLegal Finance Encrumbrances.pdf · uploaded 11 Jan 2024Source
- 2 b Details of encumbrances concerned to LegalLegal Finance Encrumbrances.pdf · uploaded 11 Jan 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentSanction Layout_compressed Updated.pdf · uploaded 11 Jan 2024Source
- 2 Building Plan Approval / NA Order for plotted development2 (1).pdf · uploaded 11 Jan 2024Source
- 3 Building Plan Approval / NA Order for plotted development3 (1).pdf · uploaded 11 Jan 2024Source
- 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 11 Jan 2024Source
- 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 11 Jan 2024Source
- 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 11 Jan 2024Source
- 7 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 11 Jan 2024Source
- 8 Building Plan Approval / NA Order for plotted development9.pdf · uploaded 11 Jan 2024Source
- 9 Building Plan Approval / NA Order for plotted development10_compressed.pdf · uploaded 11 Jan 2024Source
- 10 Building Plan Approval / NA Order for plotted development11.pdf · uploaded 11 Jan 2024Source
- 11 Building Plan Approval / NA Order for plotted development12.pdf · uploaded 11 Jan 2024Source
- 1 Copy of the legal title reportFormat A Search Report Crown 8 RERA.pdf · uploaded 1 Feb 2024Source
- 1 Proforma of Agreement for saleCrown8 Agreement to sell001_compressed.pdf · uploaded 8 Feb 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure.pdf · uploaded 17 Feb 2024Source
- 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 17 Feb 2024Source
- 1 Other – TechnicalAffidavit .pdf · uploaded 17 Feb 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same.pdf · uploaded 7 Mar 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 8 Mar 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Pyramid Alliance LLP - form 1 - mar 24.pdf · uploaded 11 Jun 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pyramid Alliance LLP - Form 2 - mar 24.pdf · uploaded 11 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Pyramid Alliance LLP - form 2A - mar 24.pdf · uploaded 11 Jun 2024Source
- 1 Disclosure of sold/ booked inventoryDisc of Sold Booked Inventary_Crown 8 Pyramid Alliance LLP.pdf · uploaded 11 Jun 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rera Form -3_Alliance.pdf · uploaded 13 Jun 2024Source
- 12 Building Plan Approval / NA Order for plotted development1 (4)_compressed.pdf · uploaded 5 Jul 2024Source
- 2 Declaration about Commencement Certificatedoc03477620240704211618.pdf · uploaded 5 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_CROWN 8.pdf · uploaded 20 Aug 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_CROWN 8_compressed.pdf · uploaded 20 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEP 2024 CROWN 8.pdf · uploaded 25 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SEP 2024 CROWN 8_compressed.pdf · uploaded 25 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEPT 2024 CROWN 8.pdf · uploaded 25 Oct 2024Source
- 1 Disclosure of sold/ booked inventorySOLD BOOKED INVENTARY SEP 2024 CROWN 8.pdf · uploaded 25 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM5 Alliance 2023-24 123.pdf · uploaded 21 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM5 Alliance 2023-24 123.pdf · uploaded 21 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2-CROWN 8-DEC-2024.pdf · uploaded 8 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CROWN 8_PYRAMID ALLIANCE LLP DEC-2024_compressed.pdf · uploaded 9 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 -CROWN 8-DEC-2024.pdf · uploaded 20 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1-March-2025 Crown 8.pdf · uploaded 19 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3-PYRAMID ALLIANCE LL ( CROWN8)-MARCH-2025_compressed.pdf · uploaded 19 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2-ALLIANCE-MARCH-2025.pdf · uploaded 19 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD-PYRAMID ALLAINCE LLP-MARCH-25.pdf · uploaded 19 Apr 2025Source
- 1 a Details of encumbrances concerned to FinanceENCUMBRANCES-CROWN 8.pdf · uploaded 30 Apr 2025Source
- 1 b Details of encumbrances concerned to LegalENCUMBRANCES-CROWN 8.pdf · uploaded 30 Apr 2025Source
- Form 1FORM 1 ALLIANCE JUNE 2025.pdf · uploaded 4 Aug 2025Source
- Form 2FORM 2 ALLIANCE JUNE 2025.pdf · uploaded 4 Aug 2025Source
- Form 3FORM 3 PYRAMID ALLIANCE LLP JUNE-2025.pdf · uploaded 4 Aug 2025Source
- Disclosure of Sold and Booked InventorySold Booked Crown 8.pdf · uploaded 4 Aug 2025Source
- Withdrawal Update Form 1FORM 1 ALLIANCE SEP-2025.pdf · uploaded 7 Nov 2025Source
- Withdrawal Update Form 2FORM-2-CROWN-8 SEP-2025.pdf · uploaded 7 Nov 2025Source
- Withdrawal Update Form 3FORM-3 CROWN 8-SEP-2025.pdf · uploaded 7 Nov 2025Source
- Form 5 (FY 2023-2024)FORM5 Alliance 2023-24.pdf · uploaded 7 Nov 2025Source
- Form 5 (FY 2024-2025)From 5 Crown-8 2025.pdf · uploaded 12 Nov 2025Source
- Form 2A (FY 2023-2024)crown8 From 2A -2022-23.pdf · uploaded 13 Nov 2025Source
- Form 2A (FY 2024-2025)Crown8 From 2A 2023-24.pdf · uploaded 13 Nov 2025Source
- Form 2A (FY 2025-2026)Crown8 form 2A-2024-25.pdf · uploaded 13 Nov 2025Source
- Withdrawal Update Form 1FORM 1 ALLIANCE DEC-2025.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 2PYRAMID ALLIANCE LLP RERA FORM-2 Q3 DEC-2025.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 3FORM 3 PYRAMID Crown 8 Signed compressed.pdf · uploaded 30 Jan 2026Source
- Withdrawal Update Form 1FORM 1 ALLIANCE MARCH -2026.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 2FORM-2-MARCH-2026-CROWN 8.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 3FORM 3 PYRAMID ( Crown 8) March-2026.pdf · uploaded 27 Apr 2026Source
- Withdrawal Update Form 1Crown 8 Form 1 Signed_0001.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2FORM-2- QUARTERLY JUNE-2026-CROWN 8.pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3Form 3_Crown 8_June-2026.pdf · uploaded 20 Jul 2026Source
- Form 1Pyramid Alliance LLP - form 1 - mar 24.pdf · uploaded 30 Jul 2026Source
- Form 1FORM 1 SEP 2024 CROWN 8.pdf · uploaded 30 Jul 2026Source
- Form 1FORM 1 ALLIANCE JUNE 2025.pdf · uploaded 30 Jul 2026Source
- Form 1FORM-1 -CROWN 8-DEC-2024.pdf · uploaded 30 Jul 2026Source
- Form 1FORM-1-March-2025 Crown 8.pdf · uploaded 30 Jul 2026Source
- Form 2Pyramid Alliance LLP - Form 2 - mar 24.pdf · uploaded 30 Jul 2026Source
- Form 2FORM 2 SEPT 2024 CROWN 8.pdf · uploaded 30 Jul 2026Source
- Form 2FORM 2 ALLIANCE JUNE 2025.pdf · uploaded 30 Jul 2026Source
- Form 2FORM-2-CROWN 8-DEC-2024.pdf · uploaded 30 Jul 2026Source
- Form 2FORM-2-ALLIANCE-MARCH-2025.pdf · uploaded 30 Jul 2026Source
- Form 3Rera Form -3_Alliance.pdf · uploaded 30 Jul 2026Source
- Form 3FORM 3 SEP 2024 CROWN 8_compressed.pdf · uploaded 30 Jul 2026Source
- Form 3FORM 3 PYRAMID ALLIANCE LLP JUNE-2025.pdf · uploaded 30 Jul 2026Source
- Form 3FORM 3 CROWN 8_PYRAMID ALLIANCE LLP DEC-2024_compressed.pdf · uploaded 30 Jul 2026Source
- Form 3FORM-3-PYRAMID ALLIANCE LL ( CROWN8)-MARCH-2025_compressed.pdf · uploaded 30 Jul 2026Source
- Disclosure of Sold and Booked InventoryDisc of Sold Booked Inventary_Crown 8 Pyramid Alliance LLP.pdf · uploaded 30 Jul 2026Source
- Disclosure of Sold and Booked InventorySOLD BOOKED INVENTARY SEP 2024 CROWN 8.pdf · uploaded 30 Jul 2026Source
- Disclosure of Sold and Booked InventorySold Booked Crown 8.pdf · uploaded 30 Jul 2026Source
- Disclosure of Sold and Booked InventoryFORM-1 -CROWN 8-DEC-2024.pdf · uploaded 30 Jul 2026Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD-PYRAMID ALLAINCE LLP-MARCH-25.pdf · uploaded 30 Jul 2026Source
Technical
- DocumentSanction Layout_compressed.pdf · uploaded 30 Oct 2023Source
- DocumentSanction Layout_compressed Updated.pdf · uploaded 11 Jan 2024Source
- Document2 (1).pdf · uploaded 11 Jan 2024Source
- Document3 (1).pdf · uploaded 11 Jan 2024Source
- Document4.pdf · uploaded 11 Jan 2024Source
- Document5.pdf · uploaded 11 Jan 2024Source
- Document6.pdf · uploaded 11 Jan 2024Source
- Document7.pdf · uploaded 11 Jan 2024Source
- Document9.pdf · uploaded 11 Jan 2024Source
- Document10_compressed.pdf · uploaded 11 Jan 2024Source
- Document11.pdf · uploaded 11 Jan 2024Source
- Document12.pdf · uploaded 11 Jan 2024Source
- Other – TechnicalAffidavit .pdf · uploaded 17 Feb 2024Source
- Document1 (4)_compressed.pdf · uploaded 5 Jul 2024Source
- DocumentHPSC0201_compressed.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0201_compressed.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0202.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0203.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0204.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0205.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0206.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0207.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0208.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0209.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0210.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0211.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0212.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0213.pdf · uploaded 16 Oct 2025Source
- Documentcommencement certificate.pdf · uploaded 16 Oct 2025Source
- DocumentHPSC0201_compressed.pdf · uploaded 27 Apr 2026Source
- DocumentLayout 1-14.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0201_compressed.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0202.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0203.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0204.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0205.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0206.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0207.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0209.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0209.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0210.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0211.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0212.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0213.pdf · uploaded 27 Apr 2026Source
- DocumentLayout 1-14.pdf · uploaded 27 Apr 2026Source
- Document1-14.pdf · uploaded 27 Apr 2026Source
- Document2-14.pdf · uploaded 27 Apr 2026Source
- Document3-14.pdf · uploaded 27 Apr 2026Source
- Document4-14.pdf · uploaded 27 Apr 2026Source
- Document5-14.pdf · uploaded 27 Apr 2026Source
- Document6-14.pdf · uploaded 27 Apr 2026Source
- Document7-14.pdf · uploaded 27 Apr 2026Source
- Document8-14.pdf · uploaded 27 Apr 2026Source
- Document9-14.pdf · uploaded 27 Apr 2026Source
- Document10-14.pdf · uploaded 27 Apr 2026Source
- Document11-14.pdf · uploaded 27 Apr 2026Source
- Document12-14.pdf · uploaded 27 Apr 2026Source
- Document13-14.pdf · uploaded 27 Apr 2026Source
- Document14-14.pdf · uploaded 27 Apr 2026Source
- Documentcommencement certificate.pdf · uploaded 27 Apr 2026Source
- DocumentHPSC0208.pdf · uploaded 27 Apr 2026Source
- DocumentCommeincement Certificate.pdf · uploaded 27 Apr 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Balewadi, Haveli taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 24 mtrs D P Road
- South
- Karan Celista Society
- East
- Survey No 9
- West
- Amenity Space of Karan Celista
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Amit Bhat | — |
| Architect | Deepali Agarwal | — |
| Chartered accountant | Premchand Patil | — |
| Chartered accountant | Sonal Mahbubani | — |
| Engineer | Pravin Wadje | — |
| Engineer | vijay Shinde | — |
Source: MahaRERA project page. Contact details are not shown.