Skip to content

Gaurav Heights

Certificate Signed

Vasaivirar City (M Corp), Palghar 401203 |Promoter: Mahavir Developers

Residential / Group HousingRERAP99000009792
22 Aug 2017Registered with MahaRERA
1 Jun 2019Promised completion
31 Mar 2027Revised completionPushed back 7 years and 9 months
3Buildings
135Units registered87 booked (64%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
Flat, 101office, 102 office, 206, A101, A102, A103, A104, A201, A202, A203, A204, A205, A207, A208, A301, A302, A303, A304, A305, A306, A307, A308, A401, A402, A403, A404, A405, A406, A407, A408, A501, A502, A503, A504, A505, A506, A507, A508, A601, A602, A603, A604, A605, A606, A607, A608, A701, A702, A703, A704, A705, A706, A707, A708, Office02, Office03, Office04, Office1, Shop1, Shop2, Shop3, Shop4, Shop5, B101, B102, B103, B104, B201, B202, B203, B204, B301, B302, B303, B304, B401, B402, B403, B404, B501, B502, B503, B504, B601, B602, B603, B604, B701, B702, B703, B704135 units in all
Address
S No. 36, H No. 4PIN 401203
Designated bank account
76
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.21277, 72.83693
Gaurav Heights is at latitude 19.21277, longitude 72.83693.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 7 years and 9 months

Registered
22 Aug 2017
Promised
1 Jun 2019
Revised
31 Mar 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P9900000979222 Aug 20171 Jun 201931 Mar 2027Mahavir DevelopersProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A And B Wing Proposed444
A Wing1263
B Wing1228

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

87 of 135 units booked (64%), as the promoter reported to MahaRERA

Flat · 44 units101office · 1 unit102 office · 1 unit206 · 1 unitA101 · 1 unitA102 · 1 unitA103 · 1 unitA104 · 1 unitA201 · 1 unitA202 · 1 unitA203 · 1 unitA204 · 1 unitA205 · 1 unitA207 · 1 unitA208 · 1 unitA301 · 1 unitA302 · 1 unitA303 · 1 unitA304 · 1 unitA305 · 1 unitA306 · 1 unitA307 · 1 unitA308 · 1 unitA401 · 1 unitA402 · 1 unitA403 · 1 unitA404 · 1 unitA405 · 1 unitA406 · 1 unitA407 · 1 unitA408 · 1 unitA501 · 1 unitA502 · 1 unitA503 · 1 unitA504 · 1 unitA505 · 1 unitA506 · 1 unitA507 · 1 unitA508 · 1 unitA601 · 1 unitA602 · 1 unitA603 · 1 unitA604 · 1 unitA605 · 1 unitA606 · 1 unitA607 · 1 unitA608 · 1 unitA701 · 1 unitA702 · 1 unitA703 · 1 unitA704 · 1 unitA705 · 1 unitA706 · 1 unitA707 · 1 unitA708 · 1 unitOffice02 · 1 unitOffice03 · 1 unitOffice04 · 1 unitOffice1 · 1 unitShop1 · 1 unitShop2 · 1 unitShop3 · 1 unitShop4 · 1 unitShop5 · 1 unitB101 · 1 unitB102 · 1 unitB103 · 1 unitB104 · 1 unitB201 · 1 unitB202 · 1 unitB203 · 1 unitB204 · 1 unitB301 · 1 unitB302 · 1 unitB303 · 1 unitB304 · 1 unitB401 · 1 unitB402 · 1 unitB403 · 1 unitB404 · 1 unitB501 · 1 unitB502 · 1 unitB503 · 1 unitB504 · 1 unitB601 · 1 unitB602 · 1 unitB603 · 1 unitB604 · 1 unitB701 · 1 unitB702 · 1 unitB703 · 1 unitB704 · 1 unit
BuildingTypeCarpet areaUnitsBooked
A And B Wing ProposedFlat1,600.44 sq m · 17,227 sq ft440
A Wing101office93.64 sq m · 1,008 sq ft10
A Wing102 office196.64 sq m · 2,117 sq ft11
A Wing20672.09 sq m · 776 sq ft11
A WingA10134.03 sq m · 366 sq ft11
A WingA10234.08 sq m · 367 sq ft11
A WingA10334.05 sq m · 367 sq ft11
A WingA10434.05 sq m · 367 sq ft11
Show all 92 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
A WingA20133.99 sq m · 366 sq ft11
A WingA20233.99 sq m · 366 sq ft11
A WingA20333.99 sq m · 366 sq ft11
A WingA20433.99 sq m · 366 sq ft11
A WingA20559.3 sq m · 638 sq ft11
A WingA20733.99 sq m · 366 sq ft11
A WingA20833.99 sq m · 366 sq ft11
A WingA30133.99 sq m · 366 sq ft11
A WingA30233.99 sq m · 366 sq ft11
A WingA30333.99 sq m · 366 sq ft11
A WingA30433.99 sq m · 366 sq ft11
A WingA30559.3 sq m · 638 sq ft11
A WingA30672.09 sq m · 776 sq ft11
A WingA30733.99 sq m · 366 sq ft11
A WingA30833.99 sq m · 366 sq ft11
A WingA40133.99 sq m · 366 sq ft11
A WingA40233.99 sq m · 366 sq ft11
A WingA40333.99 sq m · 366 sq ft11
A WingA40433.99 sq m · 366 sq ft11
A WingA40559.3 sq m · 638 sq ft11
A WingA40672.09 sq m · 776 sq ft11
A WingA40733.99 sq m · 366 sq ft11
A WingA40833.99 sq m · 366 sq ft11
A WingA50133.99 sq m · 366 sq ft11
A WingA50233.99 sq m · 366 sq ft11
A WingA50333.99 sq m · 366 sq ft11
A WingA50433.99 sq m · 366 sq ft11
A WingA50559.3 sq m · 638 sq ft11
A WingA50672.09 sq m · 776 sq ft11
A WingA50734.39 sq m · 370 sq ft11
A WingA50833.99 sq m · 366 sq ft11
A WingA60133.99 sq m · 366 sq ft11
A WingA60233.99 sq m · 366 sq ft11
A WingA60333.99 sq m · 366 sq ft11
A WingA60433.99 sq m · 366 sq ft11
A WingA60559.3 sq m · 638 sq ft11
A WingA60672.09 sq m · 776 sq ft11
A WingA60733.99 sq m · 366 sq ft11
A WingA60833.99 sq m · 366 sq ft11
A WingA70133.99 sq m · 366 sq ft11
A WingA70233.99 sq m · 366 sq ft11
A WingA70333.99 sq m · 366 sq ft11
A WingA70433.99 sq m · 366 sq ft11
A WingA70559.3 sq m · 638 sq ft11
A WingA70672.09 sq m · 776 sq ft11
A WingA70733.99 sq m · 366 sq ft11
A WingA70833.99 sq m · 366 sq ft11
A WingOffice0226.6 sq m · 286 sq ft11
A WingOffice0316.29 sq m · 175 sq ft11
A WingOffice0426.6 sq m · 286 sq ft11
A WingOffice111.49 sq m · 124 sq ft11
A WingShop130.17 sq m · 325 sq ft10
A WingShop224.67 sq m · 266 sq ft10
A WingShop330.17 sq m · 325 sq ft11
A WingShop431.82 sq m · 343 sq ft11
A WingShop539.52 sq m · 425 sq ft11
B WingB10127.53 sq m · 296 sq ft11
B WingB10246.61 sq m · 502 sq ft11
B WingB10334.3 sq m · 369 sq ft11
B WingB10433.72 sq m · 363 sq ft11
B WingB20127.93 sq m · 301 sq ft11
B WingB20247.37 sq m · 510 sq ft11
B WingB20334.71 sq m · 374 sq ft11
B WingB20434.14 sq m · 367 sq ft11
B WingB30127.93 sq m · 301 sq ft11
B WingB30247.37 sq m · 510 sq ft11
B WingB30334.71 sq m · 374 sq ft11
B WingB30434.14 sq m · 367 sq ft11
B WingB40127.93 sq m · 301 sq ft10
B WingB40247.37 sq m · 510 sq ft11
B WingB40334.71 sq m · 374 sq ft11
B WingB40434.14 sq m · 367 sq ft11
B WingB50127.93 sq m · 301 sq ft11
B WingB50247.37 sq m · 510 sq ft11
B WingB50334.71 sq m · 374 sq ft11
B WingB50434.14 sq m · 367 sq ft11
B WingB60127.93 sq m · 301 sq ft11
B WingB60247.37 sq m · 510 sq ft11
B WingB60334.71 sq m · 374 sq ft11
B WingB60434.14 sq m · 367 sq ft11
B WingB70127.93 sq m · 301 sq ft11
B WingB70247.37 sq m · 510 sq ft11
B WingB70334.71 sq m · 374 sq ft11
B WingB70434.14 sq m · 367 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 80 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Finance

  • PAN CardPancard.pdf · uploaded 30 Jul 2017Source

Legal

  • Legal Title reportsearch report.pdf · uploaded 30 Jul 2017Source
  • Declaration Form Bform B.pdf · uploaded 30 Jul 2017Source
  • Declaration Form BFORM B.pdf · uploaded 10 Jun 2024Source
  • Declaration Form BMAHAVIR-OWNER.pdf · uploaded 19 Jun 2024Source

Migrated

  • 1 PAN CardPancard.pdf · uploaded 30 Jul 2017Source
Show all 82 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportsearch report.pdf · uploaded 30 Jul 2017Source
  • 1 Details of encumbrancesEncumbrances 1.pdf · uploaded 30 Jul 2017Source
  • 2 Details of encumbrancesEncumbrances 2.pdf · uploaded 30 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 30 Jul 2017Source
  • 1 Building Plan Approval (IOD)1st BLD DRW.pdf · uploaded 30 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentNew CC.pdf · uploaded 30 Jul 2017Source
  • 1 Declaration in FORM Bform B.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of CA (Form 3)FORM 3.pdf · uploaded 30 Jul 2017Source
  • 1 Proforma of Allotment letterSale Agreement Not Ready Request.pdf · uploaded 30 Jul 2017Source
  • 2 Proforma of Allotment letterAgrrement for sale.pdf · uploaded 13 Nov 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate.PDF · uploaded 28 Feb 2020Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 ARCHITECT CERTIFICATE.PDF · uploaded 28 Feb 2020Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 ENGINEER CERTIFICATE.PDF · uploaded 28 Feb 2020Source
  • 2 Certificates of CA (Form 3)Form 3 CA Certificate.PDF · uploaded 28 Feb 2020Source
  • 3 Certificates of CA (Form 3)Form 3 C A CERTIFICATE.PDF · uploaded 28 Feb 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form - 5.PDF · uploaded 28 Feb 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5.PDF · uploaded 28 Feb 2020Source
  • 1 Declaration about Commencement Certificateform d.pdf · uploaded 27 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)MAHAVIR DEVELOPERS FORM 2A MARCH 20.pdf · uploaded 27 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)MAHAVIR DEVELOPERS FORM 2A MARCH 21.pdf · uploaded 27 Jul 2021Source
  • 1 Disclosure of sold/ booked inventoryMAHAVIR DEVELOPERS DISCLOSURE OF SOLD-BOOKED INVENTORY.pdf · uploaded 27 Jul 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)MAHAVIR DEVELOPERS FORM 5.pdf · uploaded 27 Jul 2021Source
  • 4 Certificates of CA (Form 3)FORM-3.PDF · uploaded 29 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5.PDF · uploaded 29 Aug 2022Source
  • 2 Copy of Layout Approval (in case of layout)MYSCAN_20220912_0003.PDF · uploaded 29 Sep 2022Source
  • 2 Building Plan Approval (IOD)MYSCAN_20220912_0001.PDF · uploaded 29 Sep 2022Source
  • 3 Building Plan Approval (IOD)MYSCAN_20220912_0004.PDF · uploaded 29 Sep 2022Source
  • 4 Building Plan Approval (IOD)MYSCAN_20220912_0005.PDF · uploaded 29 Sep 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 29 Sep 2022Source
  • 5 Certificates of CA (Form 3)MAHAVIR DEVELOPER FORM-3 - 2021-2022.PDF · uploaded 11 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)MAHAVIR DEVELOPER FORM-5 - 2021 - 2022.PDF · uploaded 11 Oct 2022Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)mahaveer form 1-2.pdf · uploaded 8 Nov 2022Source
  • 6 Certificates of CA (Form 3)FORM-3 - 30-09-2022.PDF · uploaded 10 Nov 2022Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 SIGNED.pdf · uploaded 7 Jun 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 MAR 24.pdf · uploaded 7 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)form 2a.pdf · uploaded 7 Jun 2024Source
  • 7 Certificates of CA (Form 3)FORM 3.pdf · uploaded 7 Jun 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5.pdf · uploaded 7 Jun 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5 signed.pdf · uploaded 7 Jun 2024Source
  • 2 Declaration in FORM BFORM B.pdf · uploaded 10 Jun 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A SIGNED.pdf · uploaded 10 Jun 2024Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 10 Jun 2024Source
  • 3 Declaration in FORM BMAHAVIR-OWNER.pdf · uploaded 19 Jun 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM A MAHA SIGNED.pdf · uploaded 19 Jun 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 JUN 24.pdf · uploaded 22 Feb 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 SEP 24.pdf · uploaded 22 Feb 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 DEC 24.pdf · uploaded 22 Feb 2025Source
  • 1 Certificates of CA (Form 3)FORM 3 JUN 24.pdf · uploaded 22 Feb 2025Source
  • 2 Certificates of CA (Form 3)FORM 3 SEP 24.pdf · uploaded 22 Feb 2025Source
  • 3 Certificates of CA (Form 3)FORM 3 DEC 24.pdf · uploaded 22 Feb 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 JUN 24.pdf · uploaded 22 Feb 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 SEP 24.pdf · uploaded 22 Feb 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 DEC 24.pdf · uploaded 22 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD JUN 24.pdf · uploaded 22 Feb 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD SEP 24.pdf · uploaded 22 Feb 2025Source
  • 3 Disclosure of sold/ booked inventorySOLD DEC 24.pdf · uploaded 22 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2a mahavir dev.pdf · uploaded 22 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5.pdf · uploaded 24 Feb 2025Source

Technical

  • Document1st BLD DRW.pdf · uploaded 30 Jul 2017Source
  • DocumentLayout.pdf · uploaded 30 Jul 2017Source
  • DocumentMYSCAN_20220912_0003.PDF · uploaded 29 Sep 2022Source
  • DocumentMYSCAN_20220912_0001.PDF · uploaded 29 Sep 2022Source
  • DocumentMYSCAN_20220912_0004.PDF · uploaded 29 Sep 2022Source
  • DocumentMYSCAN_20220912_0005.PDF · uploaded 29 Sep 2022Source

Technical (Architect)

  • DocumentFORM A MAHA SIGNED.pdf · uploaded 19 Jun 2024Source
  • DocumentFORM 1 JUN 24.pdf · uploaded 22 Feb 2025Source
  • DocumentFORM 1 SEP 24.pdf · uploaded 22 Feb 2025Source
  • DocumentFORM 1 DEC 24.pdf · uploaded 22 Feb 2025Source

Technical (Engineer)

  • DocumentFORM 2 MAR 24.pdf · uploaded 7 Jun 2024Source
  • DocumentFORM 2 JUN 24.pdf · uploaded 22 Feb 2025Source
  • DocumentFORM 2 SEP 24.pdf · uploaded 22 Feb 2025Source
  • DocumentFORM 2 DEC 24.pdf · uploaded 22 Feb 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Vasai-Virar City (M Corp), Vasai taluka

Survey, CTS, gat or plot numbers

H NO. 4S NO. 36

Boundaries

North
19 415193 N 72 808708 E
South
19 414539 N 72 808817 E
East
19 415193 N 72 809190e
West
19 415095 N 72 808508e

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShree Consultant—
Chartered accountantAshwin Nair—
EngineerMohd Sufiyan Shaikh—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology