Vrundavan Apartment

Completed

Nashik (M Corp.), Nashik 422009 |Promoter: Pal Developers

Residential / Group HousingRERAP51600017899
25 Sep 2018Registered with MahaRERA
17 Mar 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
480 sq m (5,167 sq ft)
Permissible built-up area
670 sq m (7,212 sq ft)
Sanctioned built-up area
670 sq m (7,212 sq ft)
Address
Sr. No. 897/1/3/Plot No. 13-14, NEAR MAHAVIR AVENUE, JAYBHAVE NAGARPIN 422009
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Vrundavan Apartment is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 17 Mar 2024

The latest completion date on record passed 2 years and 7 months ago.

Registered
25 Sep 2018
Promised
17 Mar 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001789925 Sep 201817 Mar 2024—Pal DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vrundavan Apartment5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000012
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vrundavan Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure20%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.3%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBorewell100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Chamber100%
  • Storm Water DrainsSeptic Tank0%
  • Landscaping & Tree PlantingStorm water pipeNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 21 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 1

Form 2

Registration certificate

Completion

Form 4

Form 5

Others

Layout plan

Building plan

Allotment letter

Document library

  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect s certificate.pdf · uploaded 22 Sep 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate.pdf · uploaded 22 Sep 2018View
  • Declaration in FORM BAffidavit cum declaration.pdf · uploaded 22 Sep 2018View
  • Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 22 Sep 2018View
  • Copy of the legal title reportTITLE REPORT.pdf · uploaded 22 Sep 2018View
  • Building Plan Approval (IOD)Building Plan Approval (IOD) .pdf · uploaded 22 Sep 2018View
  • Copy of Layout Approval (in case of layout)layout.pdf · uploaded 22 Sep 2018View
  • Proforma of Allotment letterProforma of the allotment letter and agreement for sale .pdf · uploaded 22 Sep 2018View
  • Details of encumbrancesDetails of encumbrances .pdf · uploaded 22 Sep 2018View
  • Annual Audit Report of Statutory CA (Form 5)FORM 5.pdf · uploaded 29 Sep 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5.pdf · uploaded 30 Nov 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)form 5.pdf · uploaded 23 Nov 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5.pdf · uploaded 7 Oct 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentVrundavan Apart-NMC-Completion Certificate.pdf · uploaded 4 Feb 2022View
  • Architect’s Certificate on Completion of Project (Form 4)pal developers rera form 4 ut_2.pdf · uploaded 4 Feb 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5.pdf · uploaded 19 Oct 2022View

Promoter documents

  • Declaration Form BAffidavit cum declaration.pdf · uploaded 22 Sep 2018View
  • Legal Title reportTITLE REPORT.pdf · uploaded 22 Sep 2018View

Technical documents

  • Building Plan ApprovalBuilding Plan Approval (IOD) .pdfView
  • Layout Approvallayout.pdfView

Proforma allotment letter

  • Proforma allotment letterProforma of the allotment letter and agreement for sale .pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

Sr. No. 897/1/3/Plot No. 1314

As published on MahaRERA's project page

Sr. No. 897/1/3/Plot No. 13-14

Boundaries

North
7-5 Mtr Col Road
South
Plot No 15
East
Sr No 897-1-1
West
7-5 Mtr Col Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShardul Vishwakarma—
EngineerR N Singh—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology