Nashik (M Corp.), Nashik 422002 |Promoter: Shilp Buildcon

Residential / Group HousingRERAP51600007256
17 Aug 2017Registered with MahaRERA
31 Dec 2018Promised completion
1Building
16Units registered
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK, 3BHK16 units in all
Land area for this project
713 sq m (7,680 sq ft)
Permissible built-up area
999 sq m (10,752 sq ft)
Sanctioned built-up area
999 sq m (10,752 sq ft)
Address
plot no 07 CYS no 6859 S no 646/7B/1/1A/2/3 final plot no 261 of TPS no 02PIN 422002
Designated bank account
The Kalyan Janata Sahakari Bank Ltd.
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.57220, 74.02294
Vastu shilp is at latitude 18.57220, longitude 74.02294.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
17 Aug 2017
Promised
31 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000725617 Aug 201731 Dec 2018—Shilp BuildconProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vastu Shilp616

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

16 units registered

2BHK · 8 units3BHK · 8 units
TypeCarpet areaUnits
2BHK51.79 sq m · 557 sq ft8
3BHK73.28 sq m · 789 sq ft8

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000016
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vastu Shilp

  • Excavation100%
  • Basement (if any)50%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor50%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyTo be provided by NMC0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)To be joined to NMC line0%
  • Storm Water DrainsTo be joined to NMC line0%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingto be joint to bore well pit0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 14 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Form 1

Form 2

Registration certificate

Form 4

Other (2)

Show all 25 documentsShow fewer documents

Other (2)

Layout plan

Allotment letter

Document library

  • Details of encumbrancesNON ENC.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BAffidevit.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title reporttitle report.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)Sanctioned plan.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)Sanctioned plan.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterDraft Agreement.pdf · uploaded 31 Jul 2017View
  • Architect’s Certificate on Completion of Project (Form 4)vastushilp.pdf · uploaded 2 Jul 2020View

Promoter documents

  • Declaration Form BAffidevit.pdf · uploaded 31 Jul 2017View
  • Legal Title reporttitle report.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalSanctioned plan.pdfView
  • Building Plan ApprovalSanctioned plan.pdfView

Proforma allotment letter

  • Proforma allotment letterDraft Agreement.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

plot no 07 CYS no 6859 S no 646/7B/1/1A/2/3 final plot no 261 of TPS no 02

As published on MahaRERA's project page

plot no 07 CYS no 6859 S no 646/7B/1/1A/2/3 final plot no 261 of TPS no 02

Boundaries

North
existing plot no 1
South
Guptawadi
East
6 meter road
West
open space

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectYogesh Pachorkar—
EngineerSudharshan Anawade—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology