The Metrozone Hampston B1

Completed

Nashik (M Corp.), Nashik 422009 |Promoter: Sanklecha Construction Private Limited

Residential / Group HousingRERAP51600007133
17 Aug 2017Registered with MahaRERA
31 Mar 2018Promised completion
30 Sep 2018Revised completionPushed back 6 months
2Buildings
48Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
2
Unit types
3BHK48 units in all
Land area for this project
2,451 sq m (26,387 sq ft)
Permissible built-up area
6,248 sq m (67,257 sq ft)
Sanctioned built-up area
6,248 sq m (67,257 sq ft)
Address
Survey No 7/1 to 5 and 8/1 to 5, WADALA, PATHARDI ROAD, INDIRA NAGARPIN 422009
Designated bank account
Hdfc Bank
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.99817, 72.82747
The Metrozone Hampston B1 is at latitude 18.99817, longitude 72.82747.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 6 months

The latest completion date on record passed 8 years and 1 month ago.

Registered
17 Aug 2017
Promised
31 Mar 2018
Revised
30 Sep 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000713317 Aug 201731 Mar 201830 Sep 2018Sanklecha Construction Private LimitedProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P51600007133)——
Hampston B11448

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

48 units registered

3BHK · 48 units
TypeCarpet areaUnits
3BHK106.66 sq m · 1,148 sq ft46
3BHK112.4 sq m · 1,210 sq ft2

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000018
Open Space000030

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Hampston B1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsCompleted Before Possession100%
  • Water SupplyCompleted Before Possession100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed Before Possession100%
  • Storm Water DrainsCompleted Before Possession100%
  • Landscaping & Tree PlantingCompleted Before Possession100%
  • Street LightingCompleted Before Possession100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterCompleted Before Possession100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCompleted Before Possession0%
  • Energy managemcntCompleted Before Possession0%
  • Fire protection and fire safety requirementsCompleted Before Possession100%
  • Electrical meter room, sub-station, receiving stationCompleted Before Possession100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingCompleted Before Possession100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

24 documents held by Deedo, 26 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Form 2

Registration certificate

Extension certificate

Occupancy / completion certificate

  • Occupancy / completion certificate2 Dec 2019ViewSource

Form 4

Show all 50 documentsShow fewer documents

Commencement certificate (2)

Form 2A (2)

Form 5 (3)

Other (6)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportSEARCH REPORT TMZ-ilovepdf-compressed (1).pdf · uploaded 27 Jul 2017View
  • Details of encumbrancesEncumbrances MZ.pdf · uploaded 27 Jul 2017View
  • Copy of Layout Approval (in case of layout)Metrozone layout-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View
  • Declaration in FORM BTMZ SCPL hampston b-1-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View
  • Proforma of Allotment letterAgreement - Uploadable Metrozone - B1.pdf · uploaded 27 Jul 2017View
  • Building Plan Approval (IOD)Building B1.pdf · uploaded 27 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)B1.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Hampston B1-1 to 3.pdf · uploaded 29 Jul 2017View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 2 Dec 2019View
  • Architect’s Certificate on Completion of Project (Form 4)form4.pdf · uploaded 2 Dec 2019View
  • Commencement Certificates / NA Order for plotted development1 CC_compressed.pdf · uploaded 31 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)B119.pdf · uploaded 31 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)B220.pdf · uploaded 31 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)B11718.pdf · uploaded 31 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)B11719.pdf · uploaded 31 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)B11920.pdf · uploaded 31 Jul 2021View
  • Declaration about Commencement Certificateb1.pdf · uploaded 2 Aug 2021View
  • Disclosure of sold/ booked inventoryb1.pdf · uploaded 2 Aug 2021View
  • Disclosure of sold/ booked inventoryB1ID.pdf · uploaded 2 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Adobe Scan Sep 02, 2021.pdf · uploaded 7 Sep 2021View
  • Status of ConveyanceAdobe Scan Sep 02, 2021.pdf · uploaded 7 Sep 2021View

Promoter documents

  • Legal Title reportSEARCH REPORT TMZ-ilovepdf-compressed (1).pdf · uploaded 27 Jul 2017View
  • Declaration Form BTMZ SCPL hampston b-1-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View

Technical documents

  • Layout ApprovalMetrozone layout-ilovepdf-compressed.pdfView
  • Building Plan ApprovalBuilding B1.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement - Uploadable Metrozone - B1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

8/1 to 5Survey No 7/1 to 5

As published on MahaRERA's project page

Survey No 7/1 to 5 and 8/1 to 5

Boundaries

North
Building B2
South
Internal Road and parking
East
Internal Road
West
Internal Road and Open Space

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectG V Katale & Assocites—

Source: MahaRERA project page. Contact details are not shown.