The Metrozone Athens A3

Completed

Nashik (M Corp.), Nashik 422009 |Promoter: Sanklecha Construction Private Limited

Residential / Group HousingRERAP51600009518
22 Aug 2017Registered with MahaRERA
30 Sep 2018Promised completion
30 Mar 2021Revised completionPushed back 2 years and 6 months
2Buildings
48Units registered
3MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
2
Unit types
2BHK48 units in all
Land area for this project
2,452 sq m (26,397 sq ft)
Permissible built-up area
5,184 sq m (55,799 sq ft)
Sanctioned built-up area
5,184 sq m (55,799 sq ft)
Address
Survey No 7/1 to 5 and 8/1 to 5, WADALA, PATHARDI ROAD, INDIRA NAGARPIN 422009
Designated bank account
Hdfc Bank
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.50353, 73.76154
The Metrozone Athens A3 is at latitude 18.50353, longitude 73.76154.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years and 6 months

The latest completion date on record passed 5 years and 7 months ago.

Registered
22 Aug 2017
Promised
30 Sep 2018
Revised
30 Mar 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000951822 Aug 201730 Sep 201830 Mar 2021Sanklecha Construction Private LimitedProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Athens A31448
Building (P51600009518)——

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

48 units registered

2BHK · 48 units
TypeCarpet areaUnits
2BHK88.6 sq m · 954 sq ft44
2BHK98.15 sq m · 1,056 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000018
Open Space000030

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Athens A3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsDONE100%
  • Water SupplyDONE100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)DONE100%
  • Storm Water DrainsDONE100%
  • Landscaping & Tree PlantingDONE100%
  • Street LightingDONE100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterDONE100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingDONE100%
  • Energy managemcntDONE100%
  • Fire protection and fire safety requirementsDONE100%
  • Electrical meter room, sub-station, receiving stationDONE100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingDONE100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

27 documents held by Deedo, 28 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Allotment letters

Form 2

Registration certificate

Form 5s

Extension certificate

Commencement certificates

Form 2as

Others

Completion

Form 4

Layout plan

Building plan

Document library

  • Copy of the legal title reportSEARCH REPORT TMZ-ilovepdf-compressed (1).pdf · uploaded 27 Jul 2017View
  • Details of encumbrancesEncumbrances MZ.pdf · uploaded 27 Jul 2017View
  • Copy of Layout Approval (in case of layout)Metrozone layout-ilovepdf-compressed.pdf · uploaded 27 Jul 2017View
  • Proforma of Allotment letterAgreement - Uploadable Metrozone - A3.pdf · uploaded 27 Jul 2017View
  • Proforma of Allotment letterLetter of Allotment.pdf · uploaded 27 Jul 2017View
  • Declaration in FORM BTMZ SCPL athens a-3-ilovepdf-compressed(1).pdf · uploaded 27 Jul 2017View
  • Building Plan Approval (IOD)Building A3.pdf · uploaded 27 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)A3.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Athense A3- 1 to 3.pdf · uploaded 29 Jul 2017View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)A31819.pdf · uploaded 28 Jan 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)A31819.pdf · uploaded 28 Jan 2020View
  • Commencement Certificates / NA Order for plotted development1 CC_compressed.pdf · uploaded 31 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)A319.pdf · uploaded 31 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)A320.pdf · uploaded 31 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)A31920.pdf · uploaded 31 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)A32021.pdf · uploaded 31 Jul 2021View
  • Declaration about Commencement Certificatea3.pdf · uploaded 2 Aug 2021View
  • Disclosure of sold/ booked inventorya3.pdf · uploaded 2 Aug 2021View
  • Disclosure of sold/ booked inventoryA3ID.pdf · uploaded 2 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC TMZ.pdf · uploaded 21 Feb 2022View
  • Architect’s Certificate on Completion of Project (Form 4)A3 F4.pdf · uploaded 1 Mar 2022View
  • Status of Formation of Legal Entity (Society/Co Op etc.)1 Status of Conveyance.pdf · uploaded 20 Sep 2022View
  • Status of Conveyance1 Status of Conveyance.pdf · uploaded 20 Sep 2022View

Promoter documents

  • Legal Title reportSEARCH REPORT TMZ-ilovepdf-compressed (1).pdf · uploaded 27 Jul 2017View
  • Declaration Form BTMZ SCPL athens a-3-ilovepdf-compressed(1).pdf · uploaded 27 Jul 2017View

Technical documents

  • Layout ApprovalMetrozone layout-ilovepdf-compressed.pdfView
  • Building Plan ApprovalBuilding A3.pdfView

Proforma allotment letter

  • Proforma allotment letterLetter of Allotment.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Suo motu order1 Jan 2020Matched by RERA number

    Suo motu order: Secretary, MahaRERA Versus Sanklecha Construction Private Limited (Suo Motu Case No. 40 of 2020) dated 01st January 2020

  • complaintMatched by RERA number

    Complaint CC001000000010153

  • appealMatched by RERA number

    Appeal AT03/01508/2025

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

8/1 to 5Survey No 7/1 to 5

As published on MahaRERA's project page

Survey No 7/1 to 5 and 8/1 to 5

Boundaries

North
Parking
South
Building A2
East
Internal Road and Open Space
West
Internal Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectG V Katale & Associates—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology