Sunshine Glory

Certificate Signed

Nashik (M Corp.), Nashik 422003 |Promoter: Amit Lifespace LLP

6 Jun 2022Registered with MahaRERA
31 Mar 2026Promised completion
31 Dec 2026Revised completionPushed back 9 months
3Buildings
119Units registered46 booked (39%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
3BHK, Shop119 units in all
Address
Plot No 13, 14, 15, 16, 17, G.No/S.No 51/1(P)/51/2/51/3(P) Chandshi Shiwar Nashik, Chandshi, NashikPIN 422003
Designated bank account
109
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.02705, 73.75437
Sunshine Glory is at latitude 20.02705, longitude 73.75437.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 9 months

Registered
6 Jun 2022
Promised
31 Mar 2026
Revised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000457276 Jun 202231 Mar 202631 Dec 2026Amit Lifespace LLPProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sunshine Glory Wing A742
Sunshine Glory Wing B753
Sunshine Glory Wing C724

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

46 of 119 units booked (39%), as the promoter reported to MahaRERA

3BHK · 98 unitsShop · 21 units
BuildingTypeCarpet areaUnitsBooked
Sunshine Glory Wing A3BHK83.57 sq m · 900 sq ft149
Sunshine Glory Wing A3BHK84.55 sq m · 910 sq ft1410
Sunshine Glory Wing A3BHK87.92 sq m · 946 sq ft75
Sunshine Glory Wing A3BHK87.96 sq m · 947 sq ft74
Sunshine Glory Wing B3BHK81.14 sq m · 873 sq ft73
Sunshine Glory Wing B3BHK81.95 sq m · 882 sq ft70
Sunshine Glory Wing B3BHK86.67 sq m · 933 sq ft70
Sunshine Glory Wing B3BHK86.9 sq m · 935 sq ft70
Show all 24 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Sunshine Glory Wing B3BHK87.47 sq m · 942 sq ft70
Sunshine Glory Wing B3BHK89.5 sq m · 963 sq ft70
Sunshine Glory Wing BShop15.06 sq m · 162 sq ft10
Sunshine Glory Wing BShop15.3 sq m · 165 sq ft20
Sunshine Glory Wing BShop15.43 sq m · 166 sq ft10
Sunshine Glory Wing BShop16.53 sq m · 178 sq ft10
Sunshine Glory Wing BShop19.06 sq m · 205 sq ft10
Sunshine Glory Wing BShop20.76 sq m · 223 sq ft40
Sunshine Glory Wing BShop22.8 sq m · 245 sq ft10
Sunshine Glory Wing C3BHK89.95 sq m · 968 sq ft148
Sunshine Glory Wing CShop12.21 sq m · 131 sq ft21
Sunshine Glory Wing CShop12.39 sq m · 133 sq ft11
Sunshine Glory Wing CShop13.98 sq m · 150 sq ft20
Sunshine Glory Wing CShop14.77 sq m · 159 sq ft33
Sunshine Glory Wing CShop18.42 sq m · 198 sq ft11
Sunshine Glory Wing CShop20.27 sq m · 218 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 144 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardFirm PAN.pdf · uploaded 21 Apr 2022Source

Legal

  • Declaration Form BForm B Amit.pdf · uploaded 29 Apr 2022Source
  • Legal Title reporttitle - rera_Title_merged_compressed.pdf · uploaded 24 May 2022Source

Migrated

  • 1 PAN CardFirm PAN.pdf · uploaded 21 Apr 2022Source
  • 1 CERSAI detailsCERSAI.pdf · uploaded 26 Apr 2022Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 26 Apr 2022Source
Show all 146 documentsShow fewer documents

Migrated

  • 2 Proforma of Allotment letterAgreement Draft.pdf · uploaded 26 Apr 2022Source
  • 1 Details of encumbrancesEc Amit.pdf · uploaded 29 Apr 2022Source
  • 1 Declaration in FORM BForm B Amit.pdf · uploaded 29 Apr 2022Source
  • 1 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 10 May 2022Source
  • 2 Copy of Layout Approval (in case of layout)Plan 2.pdf · uploaded 10 May 2022Source
  • 3 Copy of Layout Approval (in case of layout)Plan 3.pdf · uploaded 10 May 2022Source
  • 4 Copy of Layout Approval (in case of layout)Plan 4.pdf · uploaded 10 May 2022Source
  • 5 Copy of Layout Approval (in case of layout)Plan 4A.pdf · uploaded 10 May 2022Source
  • 6 Copy of Layout Approval (in case of layout)Plan 5.pdf · uploaded 10 May 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 10 May 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 10 May 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 10 May 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 10 May 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentPlan 4A.pdf · uploaded 10 May 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 10 May 2022Source
  • 1 Declaration about Commencement CertificateForm D.pdf · uploaded 10 May 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Amit_lifespace-signed.pdf · uploaded 11 May 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Amit_lifespace-signed.pdf · uploaded 11 May 2022Source
  • 1 Copy of the legal title reporttitle - rera_Title_merged_compressed.pdf · uploaded 24 May 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 24 May 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - june 2022_compressed.pdf · uploaded 18 Jul 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)er certificate - june 2022_compressed.pdf · uploaded 18 Jul 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA cerificate june 2022 (1).pdf · uploaded 18 Jul 2022Source
  • 1 Disclosure of sold/ booked inventorydisclosure of sold inventory dec2022 (1).pdf · uploaded 12 Jan 2023Source
  • 2 Disclosure of sold/ booked inventorydisclosure for inventory 31 March 2023 _compressed.pdf · uploaded 22 Apr 2023Source
  • 1 Other – Technicalform 2a March 2023 .pdf · uploaded 22 Apr 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Amit lifespace LLP mar 23.pdf · uploaded 9 May 2023Source
  • 1 Proforma of Agreement for saleEDITED-Kedia final Suns G Rera Eng Flat.pdf · uploaded 28 Jul 2023Source
  • 2 Proforma of Agreement for saleKedia Sunshaine Glory Rera Eng Shop (1).pdf · uploaded 28 Jul 2023Source
  • 1 Deviation Report with respect to model copy of Agreementdeviation.pdf · uploaded 28 Jul 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - june 2023.pdf · uploaded 31 Aug 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate - june 2023.pdf · uploaded 31 Aug 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA cerificate june 2023.pdf · uploaded 31 Aug 2023Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of sold inventory Sept 2023.pdf · uploaded 19 Oct 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificates.pdf · uploaded 20 Oct 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 20 Oct 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Sep23.pdf · uploaded 20 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Amit Lifespace- RERA Audit Report Signed Copy.pdf · uploaded 18 Nov 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Dec 2023_.pdf · uploaded 27 Feb 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)ER certificate - Dec 2023_.pdf · uploaded 27 Feb 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate- Dec23.pdf · uploaded 27 Feb 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 14 May 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 14 May 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 14 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 24 May 2024Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory Dec 23.pdf · uploaded 24 May 2024Source
  • 5 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory March 24.pdf · uploaded 24 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - june 2024.pdf · uploaded 13 Aug 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)ER certificate - june 2024.pdf · uploaded 13 Aug 2024Source
  • 6 Disclosure of sold/ booked inventorydisclosure of sold inventory - converted (2).pdf · uploaded 13 Aug 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Jun 24 Final Signed Copy.pdf · uploaded 13 Aug 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)format A.pdf · uploaded 11 Oct 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B.pdf · uploaded 11 Oct 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectdisclosure of finance.pdf · uploaded 11 Oct 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 11 Oct 2024Source
  • 1 Copy of Layout Approval (in case of layout)APPROVED PLAN.pdf · uploaded 11 Oct 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentAPPROVED PLAN.pdf · uploaded 11 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 11 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Revised CA certificate.pdf · uploaded 11 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT'S CERTIFICATE-min.pdf · uploaded 28 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final C A CERTIFICATE-min.pdf · uploaded 28 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE-min.pdf · uploaded 28 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 28 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorydisclosure of sold inventory.pdf · uploaded 20 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate-March-25 Final.pdf · uploaded 22 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate-March-25 Final.pdf · uploaded 22 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate - march 2025.pdf · uploaded 30 Apr 2025Source
  • Form 1Architect March 25.pdf · uploaded 24 Jun 2025Source
  • Form 2ER march 25.pdf · uploaded 24 Jun 2025Source
  • Form 3CA MArch 25.pdf · uploaded 24 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure March 25.pdf · uploaded 24 Jun 2025Source
  • Form 1Architect Dec 24.pdf · uploaded 24 Jun 2025Source
  • Form 2ER Dec 24.pdf · uploaded 24 Jun 2025Source
  • Form 3CA Dec 24.pdf · uploaded 24 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure Dec 24.pdf · uploaded 24 Jun 2025Source
  • Form 1Architect Sept 24.pdf · uploaded 24 Jun 2025Source
  • Form 2ER Sept 24.pdf · uploaded 24 Jun 2025Source
  • Form 3CA Sept 24.pdf · uploaded 24 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDIsclosure Sept 24.pdf · uploaded 24 Jun 2025Source
  • Form 1AR June 24.pdf · uploaded 24 Jun 2025Source
  • Form 2ER June 24.pdf · uploaded 24 Jun 2025Source
  • Form 3CA June 24.pdf · uploaded 24 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure June 24.pdf · uploaded 24 Jun 2025Source
  • Form 1AR MArch 24.pdf · uploaded 24 Jun 2025Source
  • Form 2ER March 24.pdf · uploaded 24 Jun 2025Source
  • Form 3CA March 24.pdf · uploaded 24 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure march 24.pdf · uploaded 24 Jun 2025Source
  • Form 1AR Dec 23.pdf · uploaded 24 Jun 2025Source
  • Form 2ER Dec 23.pdf · uploaded 24 Jun 2025Source
  • Form 3CA Dec 23.pdf · uploaded 24 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure Dec 23.pdf · uploaded 24 Jun 2025Source
  • Form 1AR Sept 23.pdf · uploaded 24 Jun 2025Source
  • Form 2ER Sept 23.pdf · uploaded 24 Jun 2025Source
  • Form 3CA Sept 23.pdf · uploaded 24 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDIsclosure Sept 23.pdf · uploaded 24 Jun 2025Source
  • Form 1AR Certificate.pdf · uploaded 19 Aug 2025Source
  • Form 2ER Certificate.pdf · uploaded 19 Aug 2025Source
  • Form 3CA Certificate final.pdf · uploaded 19 Aug 2025Source
  • Disclosure of Sold and Booked Inventorydisclosure.pdf · uploaded 19 Aug 2025Source
  • Form 1AR - sept 25.pdf · uploaded 6 Nov 2025Source
  • Form 2ER - sept 25.pdf · uploaded 6 Nov 2025Source
  • Form 3CA - sept 25 final.pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - sept 25.pdf · uploaded 6 Nov 2025Source
  • Form 5 (FY 2024-2025)CA Certifcate Form 5 final.pdf · uploaded 6 Nov 2025Source
  • Form 1AR - Dec 25 .pdf · uploaded 30 Jan 2026Source
  • Form 2ER- Dec 25.pdf · uploaded 30 Jan 2026Source
  • Form 3CA Certificate-Final.pdf · uploaded 30 Jan 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold booked Inventory.pdf · uploaded 30 Jan 2026Source
  • Form 5 (FY 2022-2023)RERA Audit Report Signed Copy.pdf · uploaded 30 Mar 2026Source
  • Form 5 (FY 2023-2024)RERA Audit Final Sign Copy.pdf · uploaded 30 Mar 2026Source
  • Withdrawal Update Form 1Architect Certificate 30-03-2026.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 2Engineers Certificate 31-3-2026 (1).pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 3CA Certificate-Final.pdf · uploaded 21 Apr 2026Source
  • Withdrawal Update Form 1AR - June 26.pdf · uploaded 27 Jul 2026Source
  • Withdrawal Update Form 2Engineers Certificate 30 Jun 26.pdf · uploaded 27 Jul 2026Source
  • Withdrawal Update Form 3CA June-2026.pdf · uploaded 27 Jul 2026Source
  • Form 5 (FY 2025-2026)RERA audit - 25-26-Final.pdf · uploaded 13 Aug 2026Source

Technical

  • DocumentPlan 1.pdf · uploaded 10 May 2022Source
  • DocumentPlan 2.pdf · uploaded 10 May 2022Source
  • DocumentPlan 3.pdf · uploaded 10 May 2022Source
  • DocumentPlan 4.pdf · uploaded 10 May 2022Source
  • DocumentPlan 4A.pdf · uploaded 10 May 2022Source
  • DocumentPlan 5.pdf · uploaded 10 May 2022Source
  • DocumentPlan 1.pdf · uploaded 10 May 2022Source
  • DocumentPlan 2.pdf · uploaded 10 May 2022Source
  • DocumentPlan 3.pdf · uploaded 10 May 2022Source
  • DocumentPlan 4.pdf · uploaded 10 May 2022Source
  • DocumentPlan 4A.pdf · uploaded 10 May 2022Source
  • DocumentPlan 5.pdf · uploaded 10 May 2022Source
  • Other – Technicalform 2a March 2023 .pdf · uploaded 22 Apr 2023Source
  • DocumentAPPROVED PLAN.pdf · uploaded 11 Oct 2024Source
  • DocumentAPPROVED PLAN.pdf · uploaded 11 Oct 2024Source

Technical (Architect)

  • DocumentARCHITECT'S CERTIFICATE-min.pdf · uploaded 28 Feb 2025Source
  • Documentarchitect certificate - march 2025.pdf · uploaded 30 Apr 2025Source
  • DocumentAR - June 26.pdf · uploaded 27 Jul 2026Source

Technical (Engineer)

  • DocumentENGINEERS CERTIFICATE-min.pdf · uploaded 28 Feb 2025Source
  • DocumentEngineer Certificate-March-25 Final.pdf · uploaded 22 Apr 2025Source
  • DocumentEngineers Certificate 30 Jun 26.pdf · uploaded 27 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

14151617G.No/S.No 51/1(P)/51/2/51/3(P) Chandshi Shiwar NashikPlot No 13

Boundaries

North
Adjoint Plot No 11
South
12 Meter Wide Road
East
15 Meter Wide Road
West
12 Meter Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPankaj Jadhav—
Chartered accountantCA Prakash N. Sabadra—
Chartered accountantNikunj Rungta—
Chartered accountantSuchita Rakesh Pawar—
EngineerAmol Badode—
EngineerHarshal Dhande—
EngineerShailesh Dhumne—
OtherAmol Kisan Badode—
OtherDnyaneshwar Sali—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology