Sunshine Glory
Certificate SignedNashik (M Corp.), Nashik 422003 |Promoter: Amit Lifespace LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 3
- Unit types
- 3BHK, Shop119 units in all
- Address
- Plot No 13, 14, 15, 16, 17, G.No/S.No 51/1(P)/51/2/51/3(P) Chandshi Shiwar Nashik, Chandshi, NashikPIN 422003
- Designated bank account
- 109
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 9 months
- Registered
- 6 Jun 2022
- Promised
- 31 Mar 2026
- Revised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600045727 | 6 Jun 2022 | 31 Mar 2026 | 31 Dec 2026 | Amit Lifespace LLP | Project page |
3 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Sunshine Glory Wing A | 7 | 42 |
| Sunshine Glory Wing B | 7 | 53 |
| Sunshine Glory Wing C | 7 | 24 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
46 of 119 units booked (39%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Sunshine Glory Wing A | 3BHK | 83.57 sq m · 900 sq ft | 14 | 9 |
| Sunshine Glory Wing A | 3BHK | 84.55 sq m · 910 sq ft | 14 | 10 |
| Sunshine Glory Wing A | 3BHK | 87.92 sq m · 946 sq ft | 7 | 5 |
| Sunshine Glory Wing A | 3BHK | 87.96 sq m · 947 sq ft | 7 | 4 |
| Sunshine Glory Wing B | 3BHK | 81.14 sq m · 873 sq ft | 7 | 3 |
| Sunshine Glory Wing B | 3BHK | 81.95 sq m · 882 sq ft | 7 | 0 |
| Sunshine Glory Wing B | 3BHK | 86.67 sq m · 933 sq ft | 7 | 0 |
| Sunshine Glory Wing B | 3BHK | 86.9 sq m · 935 sq ft | 7 | 0 |
Show all 24 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Sunshine Glory Wing B | 3BHK | 87.47 sq m · 942 sq ft | 7 | 0 |
| Sunshine Glory Wing B | 3BHK | 89.5 sq m · 963 sq ft | 7 | 0 |
| Sunshine Glory Wing B | Shop | 15.06 sq m · 162 sq ft | 1 | 0 |
| Sunshine Glory Wing B | Shop | 15.3 sq m · 165 sq ft | 2 | 0 |
| Sunshine Glory Wing B | Shop | 15.43 sq m · 166 sq ft | 1 | 0 |
| Sunshine Glory Wing B | Shop | 16.53 sq m · 178 sq ft | 1 | 0 |
| Sunshine Glory Wing B | Shop | 19.06 sq m · 205 sq ft | 1 | 0 |
| Sunshine Glory Wing B | Shop | 20.76 sq m · 223 sq ft | 4 | 0 |
| Sunshine Glory Wing B | Shop | 22.8 sq m · 245 sq ft | 1 | 0 |
| Sunshine Glory Wing C | 3BHK | 89.95 sq m · 968 sq ft | 14 | 8 |
| Sunshine Glory Wing C | Shop | 12.21 sq m · 131 sq ft | 2 | 1 |
| Sunshine Glory Wing C | Shop | 12.39 sq m · 133 sq ft | 1 | 1 |
| Sunshine Glory Wing C | Shop | 13.98 sq m · 150 sq ft | 2 | 0 |
| Sunshine Glory Wing C | Shop | 14.77 sq m · 159 sq ft | 3 | 3 |
| Sunshine Glory Wing C | Shop | 18.42 sq m · 198 sq ft | 1 | 1 |
| Sunshine Glory Wing C | Shop | 20.27 sq m · 218 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 144 filings listed on MahaRERA's project page
Finance
- PAN CardFirm PAN.pdf · uploaded 21 Apr 2022Source
Legal
Show all 146 documentsShow fewer documents
Migrated
- 2 Proforma of Allotment letterAgreement Draft.pdf · uploaded 26 Apr 2022Source
- 1 Details of encumbrancesEc Amit.pdf · uploaded 29 Apr 2022Source
- 1 Declaration in FORM BForm B Amit.pdf · uploaded 29 Apr 2022Source
- 1 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 10 May 2022Source
- 2 Copy of Layout Approval (in case of layout)Plan 2.pdf · uploaded 10 May 2022Source
- 3 Copy of Layout Approval (in case of layout)Plan 3.pdf · uploaded 10 May 2022Source
- 4 Copy of Layout Approval (in case of layout)Plan 4.pdf · uploaded 10 May 2022Source
- 5 Copy of Layout Approval (in case of layout)Plan 4A.pdf · uploaded 10 May 2022Source
- 6 Copy of Layout Approval (in case of layout)Plan 5.pdf · uploaded 10 May 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentPlan 1.pdf · uploaded 10 May 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentPlan 2.pdf · uploaded 10 May 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan 3.pdf · uploaded 10 May 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan 4.pdf · uploaded 10 May 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentPlan 4A.pdf · uploaded 10 May 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentPlan 5.pdf · uploaded 10 May 2022Source
- 1 Declaration about Commencement CertificateForm D.pdf · uploaded 10 May 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Amit_lifespace-signed.pdf · uploaded 11 May 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Cert_Amit_lifespace-signed.pdf · uploaded 11 May 2022Source
- 1 Copy of the legal title reporttitle - rera_Title_merged_compressed.pdf · uploaded 24 May 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 24 May 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - june 2022_compressed.pdf · uploaded 18 Jul 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)er certificate - june 2022_compressed.pdf · uploaded 18 Jul 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA cerificate june 2022 (1).pdf · uploaded 18 Jul 2022Source
- 1 Disclosure of sold/ booked inventorydisclosure of sold inventory dec2022 (1).pdf · uploaded 12 Jan 2023Source
- 2 Disclosure of sold/ booked inventorydisclosure for inventory 31 March 2023 _compressed.pdf · uploaded 22 Apr 2023Source
- 1 Other – Technicalform 2a March 2023 .pdf · uploaded 22 Apr 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Amit lifespace LLP mar 23.pdf · uploaded 9 May 2023Source
- 1 Proforma of Agreement for saleEDITED-Kedia final Suns G Rera Eng Flat.pdf · uploaded 28 Jul 2023Source
- 2 Proforma of Agreement for saleKedia Sunshaine Glory Rera Eng Shop (1).pdf · uploaded 28 Jul 2023Source
- 1 Deviation Report with respect to model copy of Agreementdeviation.pdf · uploaded 28 Jul 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - june 2023.pdf · uploaded 31 Aug 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate - june 2023.pdf · uploaded 31 Aug 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA cerificate june 2023.pdf · uploaded 31 Aug 2023Source
- 3 Disclosure of sold/ booked inventoryDisclosure of sold inventory Sept 2023.pdf · uploaded 19 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificates.pdf · uploaded 20 Oct 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 20 Oct 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Sep23.pdf · uploaded 20 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Amit Lifespace- RERA Audit Report Signed Copy.pdf · uploaded 18 Nov 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Dec 2023_.pdf · uploaded 27 Feb 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)ER certificate - Dec 2023_.pdf · uploaded 27 Feb 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate- Dec23.pdf · uploaded 27 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 14 May 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 14 May 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 14 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 24 May 2024Source
- 4 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory Dec 23.pdf · uploaded 24 May 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory March 24.pdf · uploaded 24 May 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - june 2024.pdf · uploaded 13 Aug 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)ER certificate - june 2024.pdf · uploaded 13 Aug 2024Source
- 6 Disclosure of sold/ booked inventorydisclosure of sold inventory - converted (2).pdf · uploaded 13 Aug 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Cert Jun 24 Final Signed Copy.pdf · uploaded 13 Aug 2024Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)format A.pdf · uploaded 11 Oct 2024Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B.pdf · uploaded 11 Oct 2024Source
- 1 Disclosure for secured/unsecured finance availed for the projectdisclosure of finance.pdf · uploaded 11 Oct 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 11 Oct 2024Source
- 1 Copy of Layout Approval (in case of layout)APPROVED PLAN.pdf · uploaded 11 Oct 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentAPPROVED PLAN.pdf · uploaded 11 Oct 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 11 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Revised CA certificate.pdf · uploaded 11 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT'S CERTIFICATE-min.pdf · uploaded 28 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final C A CERTIFICATE-min.pdf · uploaded 28 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE-min.pdf · uploaded 28 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 28 Feb 2025Source
- 1 Disclosure of sold/ booked inventorydisclosure of sold inventory.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate-March-25 Final.pdf · uploaded 22 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate-March-25 Final.pdf · uploaded 22 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate - march 2025.pdf · uploaded 30 Apr 2025Source
- Form 1Architect March 25.pdf · uploaded 24 Jun 2025Source
- Form 2ER march 25.pdf · uploaded 24 Jun 2025Source
- Form 3CA MArch 25.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure March 25.pdf · uploaded 24 Jun 2025Source
- Form 1Architect Dec 24.pdf · uploaded 24 Jun 2025Source
- Form 2ER Dec 24.pdf · uploaded 24 Jun 2025Source
- Form 3CA Dec 24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Dec 24.pdf · uploaded 24 Jun 2025Source
- Form 1Architect Sept 24.pdf · uploaded 24 Jun 2025Source
- Form 2ER Sept 24.pdf · uploaded 24 Jun 2025Source
- Form 3CA Sept 24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryDIsclosure Sept 24.pdf · uploaded 24 Jun 2025Source
- Form 1AR June 24.pdf · uploaded 24 Jun 2025Source
- Form 2ER June 24.pdf · uploaded 24 Jun 2025Source
- Form 3CA June 24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure June 24.pdf · uploaded 24 Jun 2025Source
- Form 1AR MArch 24.pdf · uploaded 24 Jun 2025Source
- Form 2ER March 24.pdf · uploaded 24 Jun 2025Source
- Form 3CA March 24.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure march 24.pdf · uploaded 24 Jun 2025Source
- Form 1AR Dec 23.pdf · uploaded 24 Jun 2025Source
- Form 2ER Dec 23.pdf · uploaded 24 Jun 2025Source
- Form 3CA Dec 23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryDisclosure Dec 23.pdf · uploaded 24 Jun 2025Source
- Form 1AR Sept 23.pdf · uploaded 24 Jun 2025Source
- Form 2ER Sept 23.pdf · uploaded 24 Jun 2025Source
- Form 3CA Sept 23.pdf · uploaded 24 Jun 2025Source
- Disclosure of Sold and Booked InventoryDIsclosure Sept 23.pdf · uploaded 24 Jun 2025Source
- Form 1AR Certificate.pdf · uploaded 19 Aug 2025Source
- Form 2ER Certificate.pdf · uploaded 19 Aug 2025Source
- Form 3CA Certificate final.pdf · uploaded 19 Aug 2025Source
- Disclosure of Sold and Booked Inventorydisclosure.pdf · uploaded 19 Aug 2025Source
- Form 1AR - sept 25.pdf · uploaded 6 Nov 2025Source
- Form 2ER - sept 25.pdf · uploaded 6 Nov 2025Source
- Form 3CA - sept 25 final.pdf · uploaded 6 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure - sept 25.pdf · uploaded 6 Nov 2025Source
- Form 5 (FY 2024-2025)CA Certifcate Form 5 final.pdf · uploaded 6 Nov 2025Source
- Form 1AR - Dec 25 .pdf · uploaded 30 Jan 2026Source
- Form 2ER- Dec 25.pdf · uploaded 30 Jan 2026Source
- Form 3CA Certificate-Final.pdf · uploaded 30 Jan 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of sold booked Inventory.pdf · uploaded 30 Jan 2026Source
- Form 5 (FY 2022-2023)RERA Audit Report Signed Copy.pdf · uploaded 30 Mar 2026Source
- Form 5 (FY 2023-2024)RERA Audit Final Sign Copy.pdf · uploaded 30 Mar 2026Source
- Withdrawal Update Form 1Architect Certificate 30-03-2026.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 2Engineers Certificate 31-3-2026 (1).pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 3CA Certificate-Final.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 1AR - June 26.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 2Engineers Certificate 30 Jun 26.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 3CA June-2026.pdf · uploaded 27 Jul 2026Source
- Form 5 (FY 2025-2026)RERA audit - 25-26-Final.pdf · uploaded 13 Aug 2026Source
Technical
- DocumentPlan 1.pdf · uploaded 10 May 2022Source
- DocumentPlan 2.pdf · uploaded 10 May 2022Source
- DocumentPlan 3.pdf · uploaded 10 May 2022Source
- DocumentPlan 4.pdf · uploaded 10 May 2022Source
- DocumentPlan 4A.pdf · uploaded 10 May 2022Source
- DocumentPlan 5.pdf · uploaded 10 May 2022Source
- DocumentPlan 1.pdf · uploaded 10 May 2022Source
- DocumentPlan 2.pdf · uploaded 10 May 2022Source
- DocumentPlan 3.pdf · uploaded 10 May 2022Source
- DocumentPlan 4.pdf · uploaded 10 May 2022Source
- DocumentPlan 4A.pdf · uploaded 10 May 2022Source
- DocumentPlan 5.pdf · uploaded 10 May 2022Source
- Other – Technicalform 2a March 2023 .pdf · uploaded 22 Apr 2023Source
- DocumentAPPROVED PLAN.pdf · uploaded 11 Oct 2024Source
- DocumentAPPROVED PLAN.pdf · uploaded 11 Oct 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nashik (M Corp.), Nashik taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Adjoint Plot No 11
- South
- 12 Meter Wide Road
- East
- 15 Meter Wide Road
- West
- 12 Meter Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Pankaj Jadhav | — |
| Chartered accountant | CA Prakash N. Sabadra | — |
| Chartered accountant | Nikunj Rungta | — |
| Chartered accountant | Suchita Rakesh Pawar | — |
| Engineer | Amol Badode | — |
| Engineer | Harshal Dhande | — |
| Engineer | Shailesh Dhumne | — |
| Other | Amol Kisan Badode | — |
| Other | Dnyaneshwar Sali | — |
Source: MahaRERA project page. Contact details are not shown.