Skip to content

Sunflower City

Certificate Signed

Nashik (M Corp.), Nashik 422010 |Promoter: Deepak Kalyanji Chande

22 Feb 2021Registered with MahaRERA
30 Jun 2027Promised completion
30 Oct 2027Revised completionPushed back 4 months
3Buildings
366Units registered21 booked (6%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
2BHK, Shop, Banquet Hall, Cultural hall366 units in all
Address
S No 14/2 S No 18/21, Opp Samaroh Lawns Pathardi Vadner Road, Near Pathardi CirclePIN 422010
Designated bank account
85
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.94292, 73.79249
Sunflower City is at latitude 19.94292, longitude 73.79249.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
22 Feb 2021
Promised
30 Jun 2027
Revised
30 Oct 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160002837522 Feb 202130 Jun 202730 Oct 2027Deepak Kalyanji ChandeProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Wing14120
Wing B14126
Wing C14120

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

21 of 366 units booked (6%), as the promoter reported to MahaRERA

2BHK · 310 unitsShop · 54 unitsBanquet Hall · 1 unitCultural hall · 1 unit
BuildingTypeCarpet areaUnitsBooked
A Wing2BHK79.11 sq m · 852 sq ft1000
A Wing2BHK104.61 sq m · 1,126 sq ft10
A Wing2BHK148.73 sq m · 1,601 sq ft20
A Wing2BHK175.94 sq m · 1,894 sq ft10
A WingShop66.95 sq m · 721 sq ft20
A WingShop75.5 sq m · 813 sq ft40
A WingShop80.15 sq m · 863 sq ft20
A WingShop81.25 sq m · 875 sq ft80
Show all 32 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Wing B2BHK79.11 sq m · 852 sq ft9810
Wing B2BHK124.37 sq m · 1,339 sq ft10
Wing B2BHK144.5 sq m · 1,555 sq ft10
Wing B2BHK174.89 sq m · 1,882 sq ft20
Wing B2BHK212.56 sq m · 2,288 sq ft10
Wing BBanquet Hall251.56 sq m · 2,708 sq ft10
Wing BShop55.35 sq m · 596 sq ft20
Wing BShop55.7 sq m · 600 sq ft43
Wing BShop66.95 sq m · 721 sq ft20
Wing BShop75.5 sq m · 813 sq ft63
Wing BShop80.15 sq m · 863 sq ft21
Wing BShop81.25 sq m · 875 sq ft61
Wing C2BHK81.45 sq m · 877 sq ft990
Wing C2BHK141.53 sq m · 1,523 sq ft10
Wing C2BHK167.32 sq m · 1,801 sq ft10
Wing C2BHK171.76 sq m · 1,849 sq ft10
Wing C2BHK196.87 sq m · 2,119 sq ft10
Wing CCultural hall251.56 sq m · 2,708 sq ft10
Wing CShop55.7 sq m · 600 sq ft21
Wing CShop63.16 sq m · 680 sq ft21
Wing CShop78.77 sq m · 848 sq ft40
Wing CShop84.5 sq m · 910 sq ft41
Wing CShop102.86 sq m · 1,107 sq ft20
Wing CShop103.29 sq m · 1,112 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 124 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card1 PAN Card.pdf · uploaded 17 Oct 2023Source

Legal

  • Legal Title reportTITLE REPORT 1.pdf · uploaded 16 Feb 2021Source
  • Legal Title reportTITLE REPORT.pdf · uploaded 16 Feb 2021Source
  • Declaration Form BStar City.pdf · uploaded 16 Feb 2021Source

Migrated

  • 1 Copy of the legal title reportTITLE REPORT 1.pdf · uploaded 16 Feb 2021Source
  • 2 Copy of the legal title reportTITLE REPORT.pdf · uploaded 16 Feb 2021Source
  • 1 Details of encumbrancesINDEX 2.pdf · uploaded 16 Feb 2021Source
Show all 125 documentsShow fewer documents

Migrated

  • 2 Details of encumbrancesINDEX 2.pdf · uploaded 16 Feb 2021Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 16 Feb 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 1.pdf · uploaded 16 Feb 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 2.pdf · uploaded 16 Feb 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 3.pdf · uploaded 16 Feb 2021Source
  • 4 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 5.pdf · uploaded 16 Feb 2021Source
  • 5 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 6.pdf · uploaded 16 Feb 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT.pdf · uploaded 16 Feb 2021Source
  • 1 Declaration in FORM BStar City.pdf · uploaded 16 Feb 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca certificate.pdf · uploaded 16 Feb 2021Source
  • 1 Proforma of Allotment letterALLOTTMENT LETTER.pdf · uploaded 16 Feb 2021Source
  • 2 Proforma of Allotment letterats.pdf · uploaded 16 Feb 2021Source
  • 6 Building Plan Approval / NA Order for plotted developmentscan3430.pdf · uploaded 18 Feb 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentscan3430.pdf · uploaded 18 Feb 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentscan3432.pdf · uploaded 18 Feb 2022Source
  • 9 Building Plan Approval / NA Order for plotted developmentscan3433.pdf · uploaded 18 Feb 2022Source
  • 10 Building Plan Approval / NA Order for plotted developmentscan3434.pdf · uploaded 18 Feb 2022Source
  • 11 Building Plan Approval / NA Order for plotted developmentscan3435.pdf · uploaded 18 Feb 2022Source
  • 12 Building Plan Approval / NA Order for plotted developmentscan3436.pdf · uploaded 18 Feb 2022Source
  • 13 Building Plan Approval / NA Order for plotted developmentscan3437.pdf · uploaded 18 Feb 2022Source
  • 14 Building Plan Approval / NA Order for plotted developmentscan3438.pdf · uploaded 18 Feb 2022Source
  • 15 Building Plan Approval / NA Order for plotted developmentscan3439.pdf · uploaded 18 Feb 2022Source
  • 16 Building Plan Approval / NA Order for plotted developmentscan3439.pdf · uploaded 18 Feb 2022Source
  • 17 Building Plan Approval / NA Order for plotted developmentscan3441.pdf · uploaded 18 Feb 2022Source
  • 18 Building Plan Approval / NA Order for plotted developmentscan3442.pdf · uploaded 18 Feb 2022Source
  • 19 Building Plan Approval / NA Order for plotted developmentscan3443.pdf · uploaded 18 Feb 2022Source
  • 20 Building Plan Approval / NA Order for plotted developmentscan3444.pdf · uploaded 18 Feb 2022Source
  • 21 Building Plan Approval / NA Order for plotted developmentscan3445.pdf · uploaded 18 Feb 2022Source
  • 22 Building Plan Approval / NA Order for plotted developmentscan3446.pdf · uploaded 18 Feb 2022Source
  • 23 Building Plan Approval / NA Order for plotted developmentscan3448.pdf · uploaded 18 Feb 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentscan3447.pdf · uploaded 18 Feb 2022Source
  • 3 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT Certificate_compressed.pdf · uploaded 18 Feb 2022Source
  • 3 Proforma of Allotment letterSUN_FLOWER_CITY_APARTMENTS_draft_copy.pdf · uploaded 18 Feb 2022Source
  • 1 Declaration about Commencement Certificatedisclosure of sold unsold Inventory.pdf · uploaded 22 Apr 2022Source
  • 1 Disclosure of sold/ booked inventorydeclaration about commencemnt certificate_compressed.pdf · uploaded 22 Apr 2022Source
  • 1 CERSAI detailsdeclaration.pdf · uploaded 22 Apr 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)sunflower city 2A.pdf · uploaded 31 Jan 2023Source
  • 3 Details of encumbrancesSunflower City Mortagage Deed Index II.pdf · uploaded 7 Feb 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Sunflower City.pdf · uploaded 10 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Sunflower_City.pdf · uploaded 18 Feb 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Sunflower City.pdf · uploaded 9 Mar 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sunflower City.pdf · uploaded 6 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Sunflower City.pdf · uploaded 6 Jul 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-Sunflower City.pdf · uploaded 6 Jul 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - SUNFLOWER CITY.pdf · uploaded 8 Jul 2023Source
  • 1 PAN Card1 PAN Card.pdf · uploaded 17 Oct 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 28 Oct 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sunflower City.pdf · uploaded 28 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM_-_3.PDF · uploaded 28 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Sunflower City - Form 5.pdf · uploaded 31 Oct 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnx A - Disclosure of Int - DBD.pdf · uploaded 9 Nov 2023Source
  • 2 Declaration about Commencement CertificateFORMAT D SUNFLOWER CITY.pdf · uploaded 27 Nov 2023Source
  • 2 CERSAI detailsCERSAI Search Report Sunflower City.pdf · uploaded 2 Dec 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SFC.pdf · uploaded 8 Jan 2024Source
  • 2 Disclosure of sold/ booked inventorySold Booked Sunflower Dec 23.pdf · uploaded 12 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sunflower Dec 23.pdf · uploaded 12 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sunflower Dec 23.pdf · uploaded 13 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sunflower City Form 1 Q4 23-24.pdf · uploaded 10 Apr 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)8) FORM 2 Sunflower March 2024.pdf · uploaded 3 Jul 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)7) Form 3 March24 Sunflower 2023-24.pdf · uploaded 3 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1) Form 2A Sunflower City March 2024.pdf · uploaded 5 Jul 2024Source
  • 3 Disclosure of sold/ booked inventoryQ4 Sold Booked Sunflower City March 24.pdf · uploaded 5 Jul 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Sunflower City Form 1 Q4 23-24.pdf · uploaded 16 Jul 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sunflower City June 2024.pdf · uploaded 16 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)5) Form 3 September 24 Sunflower 2024-25.pdf · uploaded 24 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)9) FORM 2 Sunflower September 2024.pdf · uploaded 24 Dec 2024Source
  • 1 Disclosure of sold/ booked inventoryQ2 Sold Booked Sunflower City September 24.pdf · uploaded 25 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)9) Form 1 Sunflower City September 2024.pdf · uploaded 7 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)9) SunflowerCity - Form 5.pdf · uploaded 10 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)8) FORM 2 Sunflower December 2024.pdf · uploaded 5 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)9) Form 3 December 24 Sunflower 2024-25_11zon.pdf · uploaded 6 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1) Form 1 Sunflower City March 2025.pdf · uploaded 10 May 2025Source
  • Withdrawal Update Form 1Form 1_Jun 2025.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 1Form 1_Sep 2025.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 2Form 2_Jun 2025.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 2Form 2_Sep 2025.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 3Form 3_Jun 2025.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 3Form 3_Sep 2025.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 1Form 1_Dec 2025.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 1Form 1_Mar 2026.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 2Form 2_Dec 2025.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 2Form 2_Mar 2026.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 3Form 3_Dec 2025.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 3Form 3_Mar 2026.pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 1Form 1_Jun 26.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 2Form 2_Jun 26.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 3Form 3_Jun 26.pdf · uploaded 25 Aug 2026Source

Technical

  • DocumentLAYOUT.pdf · uploaded 16 Feb 2021Source
  • DocumentBUILDING PLAN 1.pdf · uploaded 16 Feb 2021Source
  • DocumentBUILDING PLAN 2.pdf · uploaded 16 Feb 2021Source
  • DocumentBUILDING PLAN 3.pdf · uploaded 16 Feb 2021Source
  • DocumentBUILDING PLAN 5.pdf · uploaded 16 Feb 2021Source
  • DocumentBUILDING PLAN 6.pdf · uploaded 16 Feb 2021Source
  • Documentscan3430.pdf · uploaded 18 Feb 2022Source
  • Documentscan3430.pdf · uploaded 18 Feb 2022Source
  • Documentscan3432.pdf · uploaded 18 Feb 2022Source
  • Documentscan3433.pdf · uploaded 18 Feb 2022Source
  • Documentscan3434.pdf · uploaded 18 Feb 2022Source
  • Documentscan3435.pdf · uploaded 18 Feb 2022Source
  • Documentscan3436.pdf · uploaded 18 Feb 2022Source
  • Documentscan3437.pdf · uploaded 18 Feb 2022Source
  • Documentscan3438.pdf · uploaded 18 Feb 2022Source
  • Documentscan3439.pdf · uploaded 18 Feb 2022Source
  • Documentscan3439.pdf · uploaded 18 Feb 2022Source
  • Documentscan3441.pdf · uploaded 18 Feb 2022Source
  • Documentscan3442.pdf · uploaded 18 Feb 2022Source
  • Documentscan3443.pdf · uploaded 18 Feb 2022Source
  • Documentscan3444.pdf · uploaded 18 Feb 2022Source
  • Documentscan3445.pdf · uploaded 18 Feb 2022Source
  • Documentscan3446.pdf · uploaded 18 Feb 2022Source
  • Documentscan3448.pdf · uploaded 18 Feb 2022Source

Technical (Architect)

  • Document9) Form 1 Sunflower City September 2024.pdf · uploaded 7 Jan 2025Source
  • Document1) Form 1 Sunflower City March 2025.pdf · uploaded 10 May 2025Source
  • DocumentForm 1_Jun 26.pdf · uploaded 25 Aug 2026Source

Technical (Engineer)

  • Document9) FORM 2 Sunflower September 2024.pdf · uploaded 24 Dec 2024Source
  • Document8) FORM 2 Sunflower December 2024.pdf · uploaded 5 Feb 2025Source
  • DocumentForm 2_Jun 26.pdf · uploaded 25 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

S NO 14/2 S NO 18/21

Boundaries

North
S No 14 Part
South
30 Meter Wide Road
East
S No 14 Part
West
15 Meter Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMukund Bagul—
Chartered accountantCA Bhalchandra Salunke—
Chartered accountantCa Vishal Musale—
EngineerMukund Bagul—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology