Shri Vitthalresidency

Active

Nashik (M Corp.), Nashik 422101 |Promoter: Shripad Vinayak Thombre

Residential / Group HousingRERAP51600014806
2 Jan 2018Registered with MahaRERA
30 Jun 2019Promised completion
31 Dec 2027Revised completionPushed back 8 years and 6 months
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
2
Land area for this project
1,535 sq m (16,517 sq ft)
Approved layout area
6,400 sq m (68,889 sq ft)
Permissible built-up area
4,766 sq m (51,296 sq ft)
Sanctioned built-up area
4,766 sq m (51,296 sq ft)
Recreational open space
73 sq m (786 sq ft)
Address
190/2b/2, Samangaon Road, Sinnar PhataPIN 422101
Designated bank account
Union Bank Of India
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.95402, 73.79391
Shri Vitthalresidency is at latitude 19.95402, longitude 73.79391.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 8 years and 6 months

Registered
2 Jan 2018
Promised
30 Jun 2019
Revised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000148062 Jan 201830 Jun 201931 Dec 2027Shripad Vinayak ThombreProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
WING A null7—
Wing B8—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing BClosed/Covered82170099
Wing BOpen Space00000
—Closed/Covered81160097
—Open Space00006

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

WING A / null

  • Excavation100%
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Wing B

  • Excavation100%
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure40%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER SANCTION PLAN50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)A WING COMPLETEDNot applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER SANCTION PLAN50%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsA WING COMPLETEDNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER SANCTION PLAN50%
  • Aggregate area of recreational Open SpaceA WING COMPLETEDNot applicable
  • Open Parking.0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

46 documents held by Deedo, 62 filings listed on MahaRERA's project page

Titles

Encumbrance

Commencement certificates

Form 1s

Form 2s

Extension certificate

Others

Form bs

Form 2a

Registration certificate

Layout plans

Allotment letter

Building plans

Document library

  • Copy of the legal title reportLegal Title Report.pdf · uploaded 21 Dec 2017View
  • Details of encumbrancesDetails of Encumbarance.pdf · uploaded 21 Dec 2017View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 21 Dec 2017View
  • Declaration in FORM BForm B.pdf · uploaded 21 Dec 2017View
  • Proforma of Allotment letterAgreement Copy.pdf · uploaded 21 Dec 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 21 Dec 2017View
  • Building Plan Approval (IOD)Layout.pdf · uploaded 21 Dec 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 21 Dec 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng Certificate.pdf · uploaded 21 Dec 2017View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 3 Dec 2025View
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 3 Dec 2025View
  • Withdrawal Update Form 1FORM 1 31-12-2025.pdf · uploaded 19 Jan 2026View
  • Withdrawal Update Form 2FORM 2 31-12-2025.pdf · uploaded 19 Jan 2026View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 20 Apr 2026View
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 20 Apr 2026View
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 4 Aug 2026View
  • Withdrawal Update Form 2Form 2.pdf · uploaded 4 Aug 2026View
  • Form 2A (FY 2025-2026)FORM 2A.pdf · uploaded 4 Aug 2026View

Promoter documents

  • Land Ownership Document7 12.pdf · uploaded 11 Aug 2025View
  • Land Ownership Documentconfirmation deed.pdf · uploaded 11 Aug 2025View
  • Land Ownership DocumentCC 2023.pdf · uploaded 11 Aug 2025View
  • Declaration Form BForm B.pdf · uploaded 17 Sep 2025View
  • Legal Title reportTITLE REPORT.pdf · uploaded 15 Oct 2025View
  • Legal Title reportNEW TITLE REPORT.pdf · uploaded 2 Dec 2025View
  • Declaration Form BFORM B - CO-PROMOTER.pdf · uploaded 2 Dec 2025View
  • Declaration Form BDeclaration No Area-Revenue Share.pdf · uploaded 2 Dec 2025View
  • Land Ownership Document7 12.pdf · uploaded 3 Dec 2025View

Technical documents

  • Layout ApprovalPT SHEET.pdfView
  • Building Plan ApprovalBUILDING PLAN Sheet No 1 to 8 & 12.pdfView
  • Building Plan ApprovalSheet No 1.pdfView
  • Building Plan ApprovalSheet No 2.pdfView
  • Building Plan ApprovalSheet No 3.pdfView
  • Building Plan ApprovalSheet No 4.pdfView
  • Building Plan ApprovalSheet No 5.pdfView
  • Building Plan ApprovalSheet No 6.pdfView
  • Building Plan ApprovalSheet No 7.pdfView
  • Building Plan ApprovalSheet No 8.pdfView
  • Building Plan ApprovalSheet No 9.pdfView
  • Building Plan ApprovalSheet No 10.pdfView
  • Building Plan ApprovalSheet No 11.pdfView
  • Building Plan ApprovalSheet No 12.pdfView
  • Building Plan ApprovalBUIDING PLAN - Sheet No 9.pdfView
  • Building Plan ApprovalBUILDING PLAN - Sheet No 10.pdfView
  • Building Plan ApprovalBUILDING PLAN - Sheet No 11.pdfView
  • Layout Approvallayout.pdfView
  • Annexure-A as per order 50/2024ANNEXURE A-Declaration cum undertaking.pdfView
  • NA Order for Plotted DevelopmentNA order 190 deolali.pdfView
  • Building Plan ApprovalSheet No 1.pdfView
  • Building Plan ApprovalSheet No 2.pdfView
  • Building Plan ApprovalSheet No 3.pdfView
  • Building Plan ApprovalSheet No 4.pdfView
  • Building Plan ApprovalSheet No 5.pdfView
  • Building Plan ApprovalSheet No 6.pdfView
  • Building Plan ApprovalSheet No 7.pdfView
  • Building Plan ApprovalSheet No 8.pdfView
  • Building Plan ApprovalSheet No 9.pdfView
  • Building Plan ApprovalSheet No 10.pdfView
  • Building Plan ApprovalSheet No 11.pdfView
  • Building Plan ApprovalSheet No 12.pdfView
  • Building Plan ApprovalParking Details of Building A & B.pdfView

Commencement certificates and NA orders

  • Commencement certificate / NA orderSource

Proforma allotment letter

  • Proforma allotment letterAgreement Copy.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

190/2/B/1+2190/2B/2

As published on MahaRERA's project page

190/2/B/1+2

Boundaries

North
Survey No 190 2b 1
South
Survey No 190 Part
East
Road
West
Survey No 190 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDeepali Acharya Thombare—
Chartered accountantSandeep Chandrakant Chavanke—
EngineerChimanbhai Patel—
EngineerS V Thombare And Associates—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology