Skip to content

Shreeji Infinia

Certificate Signed

Nashik (M Corp.), Nashik 422011 |Promoter: Shreeji Life Space

8 Nov 2021Registered with MahaRERA
31 Dec 2027Promised completion
5Buildings
244Units registered186 booked (76%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
5
Unit types
Office, Shop, 2BHK, 3BHK, 4BHK244 units in all
Address
Plot No. 1/2/1 S.No./G.No. 848/1 to 9/849/1/1 to 2 of Nashik Shiwar, Nashik, Tapovan Takli Road, Near Metro MallPIN 422011
Designated bank account
76
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.98163, 73.80997
Shreeji Infinia is at latitude 19.98163, longitude 73.80997.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2027

Registered
8 Nov 2021
Promised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000317138 Nov 202131 Dec 202731 Dec 2027Shreeji Life SpaceProject page

5 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

186 of 244 units booked (76%), as the promoter reported to MahaRERA

Office · 26 unitsShop · 26 units2BHK · 94 units3BHK · 88 units4BHK · 10 units
BuildingTypeCarpet areaUnitsBooked
Shreeji Infinia CommercialOffice28.33 sq m · 305 sq ft10
Shreeji Infinia CommercialOffice29.49 sq m · 317 sq ft11
Shreeji Infinia CommercialOffice29.74 sq m · 320 sq ft10
Shreeji Infinia CommercialOffice30.76 sq m · 331 sq ft11
Shreeji Infinia CommercialOffice31.01 sq m · 334 sq ft44
Shreeji Infinia CommercialOffice31.52 sq m · 339 sq ft22
Shreeji Infinia CommercialOffice31.81 sq m · 342 sq ft10
Shreeji Infinia CommercialOffice32.03 sq m · 345 sq ft22
Show all 62 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Shreeji Infinia CommercialOffice32.06 sq m · 345 sq ft11
Shreeji Infinia CommercialOffice54.34 sq m · 585 sq ft10
Shreeji Infinia CommercialOffice60.81 sq m · 655 sq ft11
Shreeji Infinia CommercialOffice64.05 sq m · 689 sq ft21
Shreeji Infinia CommercialOffice81.88 sq m · 881 sq ft10
Shreeji Infinia CommercialOffice83.39 sq m · 898 sq ft10
Shreeji Infinia CommercialOffice84.65 sq m · 911 sq ft10
Shreeji Infinia CommercialOffice90.32 sq m · 972 sq ft10
Shreeji Infinia CommercialOffice91.29 sq m · 983 sq ft10
Shreeji Infinia CommercialOffice91.51 sq m · 985 sq ft10
Shreeji Infinia CommercialOffice113.55 sq m · 1,222 sq ft10
Shreeji Infinia CommercialOffice134.79 sq m · 1,451 sq ft10
Shreeji Infinia CommercialShop46.68 sq m · 502 sq ft10
Shreeji Infinia CommercialShop48.83 sq m · 526 sq ft11
Shreeji Infinia CommercialShop49.24 sq m · 530 sq ft11
Shreeji Infinia CommercialShop50.93 sq m · 548 sq ft11
Shreeji Infinia CommercialShop51.35 sq m · 553 sq ft44
Shreeji Infinia CommercialShop52.19 sq m · 562 sq ft21
Shreeji Infinia CommercialShop52.67 sq m · 567 sq ft10
Shreeji Infinia CommercialShop53.04 sq m · 571 sq ft21
Shreeji Infinia CommercialShop53.08 sq m · 571 sq ft10
Shreeji Infinia CommercialShop97.3 sq m · 1,047 sq ft10
Shreeji Infinia CommercialShop108.89 sq m · 1,172 sq ft11
Shreeji Infinia CommercialShop114.69 sq m · 1,235 sq ft21
Shreeji Infinia CommercialShop141.88 sq m · 1,527 sq ft11
Shreeji Infinia CommercialShop144.2 sq m · 1,552 sq ft10
Shreeji Infinia CommercialShop149.62 sq m · 1,610 sq ft11
Shreeji Infinia CommercialShop161.53 sq m · 1,739 sq ft11
Shreeji Infinia CommercialShop163.47 sq m · 1,760 sq ft10
Shreeji Infinia CommercialShop164.96 sq m · 1,776 sq ft10
Shreeji Infinia CommercialShop195.95 sq m · 2,109 sq ft11
Shreeji Infinia CommercialShop221.45 sq m · 2,384 sq ft10
Shreeji Infinia Wing A2BHK58.97 sq m · 635 sq ft119
Shreeji Infinia Wing A2BHK59.56 sq m · 641 sq ft127
Shreeji Infinia Wing A3BHK86.28 sq m · 929 sq ft2119
Shreeji Infinia Wing A3BHK97.01 sq m · 1,044 sq ft11
Shreeji Infinia Wing A4BHK125.9 sq m · 1,355 sq ft11
Shreeji Infinia Wing A4BHK131.29 sq m · 1,413 sq ft11
Shreeji Infinia Wing B2BHK58.97 sq m · 635 sq ft129
Shreeji Infinia Wing B2BHK59.56 sq m · 641 sq ft129
Shreeji Infinia Wing B3BHK86.28 sq m · 929 sq ft2221
Shreeji Infinia Wing B4BHK121.51 sq m · 1,308 sq ft10
Shreeji Infinia Wing B4BHK125.9 sq m · 1,355 sq ft11
Shreeji Infinia Wing C2BHK58.97 sq m · 635 sq ft119
Shreeji Infinia Wing C2BHK59.56 sq m · 641 sq ft1210
Shreeji Infinia Wing C3BHK86.28 sq m · 929 sq ft2116
Shreeji Infinia Wing C3BHK97.01 sq m · 1,044 sq ft10
Shreeji Infinia Wing C4BHK125.9 sq m · 1,355 sq ft11
Shreeji Infinia Wing C4BHK128.73 sq m · 1,386 sq ft11
Shreeji Infinia Wing D2BHK58.97 sq m · 635 sq ft1212
Shreeji Infinia Wing D2BHK59.56 sq m · 641 sq ft1210
Shreeji Infinia Wing D3BHK86.28 sq m · 929 sq ft2220
Shreeji Infinia Wing D4BHK86.27 sq m · 929 sq ft21
Shreeji Infinia Wing D4BHK86.43 sq m · 930 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 140 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card.pdf · uploaded 26 Oct 2021Source

Legal

  • Legal Title reportTitle Certficate Shreeji and Kashmire Compressed.pdf · uploaded 26 Oct 2021Source
  • Declaration Form BForm-B Developers.pdf · uploaded 26 Oct 2021Source

Migrated

  • 1 PAN CardPan Card.pdf · uploaded 26 Oct 2021Source
  • 1 Copy of the legal title reportTitle Certficate Shreeji and Kashmire Compressed.pdf · uploaded 26 Oct 2021Source
  • 1 Details of encumbrancesNil Encumbrance Certificate.pdf · uploaded 26 Oct 2021Source
  • 1 Copy of Layout Approval (in case of layout)Building Plan 1 Compressed.pdf · uploaded 26 Oct 2021Source
Show all 141 documentsShow fewer documents

Migrated

  • 2 Copy of Layout Approval (in case of layout)Building Plan 2 Compressed.pdf · uploaded 26 Oct 2021Source
  • 3 Copy of Layout Approval (in case of layout)Building Plan 3 Compressed.pdf · uploaded 26 Oct 2021Source
  • 4 Copy of Layout Approval (in case of layout)Building Plan 4 Compressed.pdf · uploaded 26 Oct 2021Source
  • 5 Copy of Layout Approval (in case of layout)Building Plan 5 Compressed.pdf · uploaded 26 Oct 2021Source
  • 6 Copy of Layout Approval (in case of layout)Building Plan 6 Compressed.pdf · uploaded 26 Oct 2021Source
  • 7 Copy of Layout Approval (in case of layout)Building Plan 7 Compressed.pdf · uploaded 26 Oct 2021Source
  • 8 Copy of Layout Approval (in case of layout)Building Plan 8 Compressed.pdf · uploaded 26 Oct 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan 1 Compressed.pdf · uploaded 26 Oct 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan 2 Compressed.pdf · uploaded 26 Oct 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan 3 Compressed.pdf · uploaded 26 Oct 2021Source
  • 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan 4 Compressed.pdf · uploaded 26 Oct 2021Source
  • 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan 5 Compressed.pdf · uploaded 26 Oct 2021Source
  • 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan 6 Compressed.pdf · uploaded 26 Oct 2021Source
  • 7 Building Plan Approval / NA Order for plotted developmentBuilding Plan 7 Compressed.pdf · uploaded 26 Oct 2021Source
  • 8 Building Plan Approval / NA Order for plotted developmentBuilding Plan 8 Compressed.pdf · uploaded 26 Oct 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentShreeji and Kashmire Commencement Compressed.pdf · uploaded 26 Oct 2021Source
  • 1 Declaration about Commencement CertificateForm D.pdf · uploaded 26 Oct 2021Source
  • 1 Declaration in FORM BForm-B Developers.pdf · uploaded 26 Oct 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 26 Oct 2021Source
  • 1 Proforma of Allotment letterAgreement to Sale Draft.pdf · uploaded 26 Oct 2021Source
  • 2 Proforma of Allotment letterAllotment Letter Format.pdf · uploaded 26 Oct 2021Source
  • 9 Copy of Layout Approval (in case of layout)Plan 01 (1).pdf · uploaded 20 Jul 2022Source
  • 10 Copy of Layout Approval (in case of layout)Plan 02 (1).pdf · uploaded 20 Jul 2022Source
  • 11 Copy of Layout Approval (in case of layout)Plan 03 (1).pdf · uploaded 20 Jul 2022Source
  • 12 Copy of Layout Approval (in case of layout)Plan 04 (1).pdf · uploaded 20 Jul 2022Source
  • 13 Copy of Layout Approval (in case of layout)Plan 05 (1).pdf · uploaded 20 Jul 2022Source
  • 14 Copy of Layout Approval (in case of layout)Plan 06 (1).pdf · uploaded 20 Jul 2022Source
  • 15 Copy of Layout Approval (in case of layout)Plan 07 (1).pdf · uploaded 20 Jul 2022Source
  • 16 Copy of Layout Approval (in case of layout)Plan 08 (1).pdf · uploaded 20 Jul 2022Source
  • 9 Building Plan Approval / NA Order for plotted developmentPlan 01 (1).pdf · uploaded 20 Jul 2022Source
  • 10 Building Plan Approval / NA Order for plotted developmentPlan 02 (1).pdf · uploaded 20 Jul 2022Source
  • 11 Building Plan Approval / NA Order for plotted developmentPlan 03 (1).pdf · uploaded 20 Jul 2022Source
  • 12 Building Plan Approval / NA Order for plotted developmentPlan 04 (1).pdf · uploaded 20 Jul 2022Source
  • 13 Building Plan Approval / NA Order for plotted developmentPlan 05 (1).pdf · uploaded 20 Jul 2022Source
  • 14 Building Plan Approval / NA Order for plotted developmentPlan 06 (1).pdf · uploaded 20 Jul 2022Source
  • 15 Building Plan Approval / NA Order for plotted developmentPlan 07 (1).pdf · uploaded 20 Jul 2022Source
  • 16 Building Plan Approval / NA Order for plotted developmentPlan 08 (1).pdf · uploaded 20 Jul 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentCommencemen Certificate.pdf · uploaded 20 Jul 2022Source
  • 17 Building Plan Approval / NA Order for plotted developmentPlan001 (1).pdf · uploaded 8 Aug 2022Source
  • 18 Building Plan Approval / NA Order for plotted developmentPlan00 (2).pdf · uploaded 8 Aug 2022Source
  • 19 Building Plan Approval / NA Order for plotted developmentPlan00 (3).pdf · uploaded 8 Aug 2022Source
  • 20 Building Plan Approval / NA Order for plotted developmentPlan00 (4).pdf · uploaded 8 Aug 2022Source
  • 21 Building Plan Approval / NA Order for plotted developmentPlan00 (5).pdf · uploaded 8 Aug 2022Source
  • 22 Building Plan Approval / NA Order for plotted developmentPlan00 (6).pdf · uploaded 8 Aug 2022Source
  • 23 Building Plan Approval / NA Order for plotted developmentPlan00 (7).pdf · uploaded 8 Aug 2022Source
  • 24 Building Plan Approval / NA Order for plotted developmentPlan00 (8).pdf · uploaded 8 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Shreeji Infinia.pdf · uploaded 22 Oct 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Shreeji Infinia Q3 22-23.pdf · uploaded 23 Nov 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Shreeji Infinia Q4 22-23.pdf · uploaded 23 Nov 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shreeji Infinia Q1.pdf · uploaded 23 Nov 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shreeji Infinia Q2.pdf · uploaded 23 Nov 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shreeji Infinia Q3 22-23.pdf · uploaded 23 Nov 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shreeji Infinia Q4 22-23.pdf · uploaded 23 Nov 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shreeji Infinia Form 3 till 30062022.pdf · uploaded 24 Nov 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shreeji Infinia Form 3 till 30112022.pdf · uploaded 24 Nov 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shreeji Infinia Form 3 till 28022023.pdf · uploaded 24 Nov 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Shreeji Infinia 22-23.pdf · uploaded 24 Nov 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Shreeji Infinia Q1 22-05-2023.pdf · uploaded 21 Dec 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Shreeji Infinia Q1 22-05-2023.pdf · uploaded 21 Dec 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Shreeji Infinia Q1 22-05-2023_compressed.pdf · uploaded 21 Dec 2023Source
  • 1 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-1-23.pdf · uploaded 18 Jan 2024Source
  • 2 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-24-46.pdf · uploaded 18 Jan 2024Source
  • 3 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-47-69.pdf · uploaded 18 Jan 2024Source
  • 4 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-70-92.pdf · uploaded 18 Jan 2024Source
  • 5 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-93-103.pdf · uploaded 18 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Shreeji Infinia Q3.pdf · uploaded 23 Feb 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 with Sign - compressed.pdf · uploaded 23 Feb 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1-SHREEJI INFINIA Q3.pdf · uploaded 24 Feb 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Shreeji Infinia Form 1 Q4.pdf · uploaded 20 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Shreeji Infinia Form 2 Q4.pdf · uploaded 5 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shreeji Infinia Form 3 Q4_compressed.pdf · uploaded 5 Jul 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q1 Shreeji Infinia.pdf · uploaded 29 Jul 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Infinia Q2.pdf · uploaded 16 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Not Exceeding Limit Self Declaration-Shreeji Infinia.pdf · uploaded 16 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Shreeji Infinia Q3.pdf · uploaded 14 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Shreeji Infinia Q2_2324.pdf · uploaded 28 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Infinia Q2_2324.pdf · uploaded 28 Jan 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart Complition 31072024.pdf · uploaded 30 Jan 2025Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart Complition 31072024.pdf · uploaded 30 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Shreeji Infinia Form 5.pdf · uploaded 5 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Shreeji Infinia 31122024_compressed.pdf · uploaded 12 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 Shreeji Infinia.pdf · uploaded 16 Apr 2025Source
  • Withdrawal Update Form 1Form 1 Infinia for RERA.pdf · uploaded 15 Jul 2025Source
  • Withdrawal Update Form 2Form 2 Shreeji Infinia_0001.pdf · uploaded 15 Jul 2025Source
  • Withdrawal Update Form 3Form 3 Infinia for Rera.pdf · uploaded 15 Jul 2025Source
  • Occupational CertificateSHREEJI INFINIA COMPLETION CERTIFICATE.pdf · uploaded 21 Sep 2025Source

Technical

  • DocumentBuilding Plan 1 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 1 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 2 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 3 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 4 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 5 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 6 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 7 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 8 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 2 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 3 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 4 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 5 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 6 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 7 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentBuilding Plan 8 Compressed.pdf · uploaded 26 Oct 2021Source
  • DocumentPlan 01 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 02 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 03 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 04 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 05 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 06 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 07 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 08 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 01 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 02 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 03 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 04 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 05 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 06 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 07 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan 08 (1).pdf · uploaded 20 Jul 2022Source
  • DocumentPlan001 (1).pdf · uploaded 8 Aug 2022Source
  • DocumentPlan00 (2).pdf · uploaded 8 Aug 2022Source
  • DocumentPlan00 (3).pdf · uploaded 8 Aug 2022Source
  • DocumentPlan00 (4).pdf · uploaded 8 Aug 2022Source
  • DocumentPlan00 (5).pdf · uploaded 8 Aug 2022Source
  • DocumentPlan00 (6).pdf · uploaded 8 Aug 2022Source
  • DocumentPlan00 (7).pdf · uploaded 8 Aug 2022Source
  • DocumentPlan00 (8).pdf · uploaded 8 Aug 2022Source

Technical (Architect)

  • DocumentForm 1 Infinia Q2.pdf · uploaded 16 Oct 2024Source
  • DocumentForm 1 Shreeji Infinia Q3.pdf · uploaded 14 Jan 2025Source
  • DocumentShreeji Infinia Q2_2324.pdf · uploaded 28 Jan 2025Source
  • DocumentForm1 Shreeji Infinia.pdf · uploaded 16 Apr 2025Source
  • DocumentForm 1 Infinia for RERA.pdf · uploaded 11 Jul 2025Source

Technical (Engineer)

  • DocumentInfinia Q2_2324.pdf · uploaded 28 Jan 2025Source
  • DocumentForm 2 Shreeji Infinia_0001.pdf · uploaded 12 Jul 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

Plot No. 1/2/1 S.No./G.No. 848/1 to 9/849/1/1 to 2 of Nashik Shiwar

Boundaries

North
9 meter wide road
South
30 Meter Wide DP Road
East
30 meter wide DP road
West
Open Space

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSumit Kumath—
ArchitectSumit M Kumath—
Chartered accountantAnil Dahiya—
Chartered accountantLalit Rajendra Pawar—
Chartered accountantPiyush Verma—
EngineerKishor Chopda—
EngineerShailesh Dhumne—
OtherMalani Khushal Mohanbhai—
OtherSunil Sontakke—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology