Shreeji Infinia
Certificate SignedNashik (M Corp.), Nashik 422011 |Promoter: Shreeji Life Space
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 5
- Unit types
- Office, Shop, 2BHK, 3BHK, 4BHK244 units in all
- Address
- Plot No. 1/2/1 S.No./G.No. 848/1 to 9/849/1/1 to 2 of Nashik Shiwar, Nashik, Tapovan Takli Road, Near Metro MallPIN 422011
- Designated bank account
- 76
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2027
- Registered
- 8 Nov 2021
- Promised
- 31 Dec 2027
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600031713 | 8 Nov 2021 | 31 Dec 2027 | 31 Dec 2027 | Shreeji Life Space | Project page |
5 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Shreeji Infinia Commercial | 3 | 52 |
| Shreeji Infinia Wing A | 13 | 47 |
| Shreeji Infinia Wing B | 13 | 48 |
| Shreeji Infinia Wing C | 13 | 47 |
| Shreeji Infinia Wing D | 13 | 50 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
186 of 244 units booked (76%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Shreeji Infinia Commercial | Office | 28.33 sq m · 305 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 29.49 sq m · 317 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Office | 29.74 sq m · 320 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 30.76 sq m · 331 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Office | 31.01 sq m · 334 sq ft | 4 | 4 |
| Shreeji Infinia Commercial | Office | 31.52 sq m · 339 sq ft | 2 | 2 |
| Shreeji Infinia Commercial | Office | 31.81 sq m · 342 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 32.03 sq m · 345 sq ft | 2 | 2 |
Show all 62 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Shreeji Infinia Commercial | Office | 32.06 sq m · 345 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Office | 54.34 sq m · 585 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 60.81 sq m · 655 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Office | 64.05 sq m · 689 sq ft | 2 | 1 |
| Shreeji Infinia Commercial | Office | 81.88 sq m · 881 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 83.39 sq m · 898 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 84.65 sq m · 911 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 90.32 sq m · 972 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 91.29 sq m · 983 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 91.51 sq m · 985 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 113.55 sq m · 1,222 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Office | 134.79 sq m · 1,451 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Shop | 46.68 sq m · 502 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Shop | 48.83 sq m · 526 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Shop | 49.24 sq m · 530 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Shop | 50.93 sq m · 548 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Shop | 51.35 sq m · 553 sq ft | 4 | 4 |
| Shreeji Infinia Commercial | Shop | 52.19 sq m · 562 sq ft | 2 | 1 |
| Shreeji Infinia Commercial | Shop | 52.67 sq m · 567 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Shop | 53.04 sq m · 571 sq ft | 2 | 1 |
| Shreeji Infinia Commercial | Shop | 53.08 sq m · 571 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Shop | 97.3 sq m · 1,047 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Shop | 108.89 sq m · 1,172 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Shop | 114.69 sq m · 1,235 sq ft | 2 | 1 |
| Shreeji Infinia Commercial | Shop | 141.88 sq m · 1,527 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Shop | 144.2 sq m · 1,552 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Shop | 149.62 sq m · 1,610 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Shop | 161.53 sq m · 1,739 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Shop | 163.47 sq m · 1,760 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Shop | 164.96 sq m · 1,776 sq ft | 1 | 0 |
| Shreeji Infinia Commercial | Shop | 195.95 sq m · 2,109 sq ft | 1 | 1 |
| Shreeji Infinia Commercial | Shop | 221.45 sq m · 2,384 sq ft | 1 | 0 |
| Shreeji Infinia Wing A | 2BHK | 58.97 sq m · 635 sq ft | 11 | 9 |
| Shreeji Infinia Wing A | 2BHK | 59.56 sq m · 641 sq ft | 12 | 7 |
| Shreeji Infinia Wing A | 3BHK | 86.28 sq m · 929 sq ft | 21 | 19 |
| Shreeji Infinia Wing A | 3BHK | 97.01 sq m · 1,044 sq ft | 1 | 1 |
| Shreeji Infinia Wing A | 4BHK | 125.9 sq m · 1,355 sq ft | 1 | 1 |
| Shreeji Infinia Wing A | 4BHK | 131.29 sq m · 1,413 sq ft | 1 | 1 |
| Shreeji Infinia Wing B | 2BHK | 58.97 sq m · 635 sq ft | 12 | 9 |
| Shreeji Infinia Wing B | 2BHK | 59.56 sq m · 641 sq ft | 12 | 9 |
| Shreeji Infinia Wing B | 3BHK | 86.28 sq m · 929 sq ft | 22 | 21 |
| Shreeji Infinia Wing B | 4BHK | 121.51 sq m · 1,308 sq ft | 1 | 0 |
| Shreeji Infinia Wing B | 4BHK | 125.9 sq m · 1,355 sq ft | 1 | 1 |
| Shreeji Infinia Wing C | 2BHK | 58.97 sq m · 635 sq ft | 11 | 9 |
| Shreeji Infinia Wing C | 2BHK | 59.56 sq m · 641 sq ft | 12 | 10 |
| Shreeji Infinia Wing C | 3BHK | 86.28 sq m · 929 sq ft | 21 | 16 |
| Shreeji Infinia Wing C | 3BHK | 97.01 sq m · 1,044 sq ft | 1 | 0 |
| Shreeji Infinia Wing C | 4BHK | 125.9 sq m · 1,355 sq ft | 1 | 1 |
| Shreeji Infinia Wing C | 4BHK | 128.73 sq m · 1,386 sq ft | 1 | 1 |
| Shreeji Infinia Wing D | 2BHK | 58.97 sq m · 635 sq ft | 12 | 12 |
| Shreeji Infinia Wing D | 2BHK | 59.56 sq m · 641 sq ft | 12 | 10 |
| Shreeji Infinia Wing D | 3BHK | 86.28 sq m · 929 sq ft | 22 | 20 |
| Shreeji Infinia Wing D | 4BHK | 86.27 sq m · 929 sq ft | 2 | 1 |
| Shreeji Infinia Wing D | 4BHK | 86.43 sq m · 930 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 140 filings listed on MahaRERA's project page
Finance
- PAN CardPan Card.pdf · uploaded 26 Oct 2021Source
Legal
Migrated
- 1 PAN CardPan Card.pdf · uploaded 26 Oct 2021Source
- 1 Copy of the legal title reportTitle Certficate Shreeji and Kashmire Compressed.pdf · uploaded 26 Oct 2021Source
- 1 Details of encumbrancesNil Encumbrance Certificate.pdf · uploaded 26 Oct 2021Source
- 1 Copy of Layout Approval (in case of layout)Building Plan 1 Compressed.pdf · uploaded 26 Oct 2021Source
Show all 141 documentsShow fewer documents
Migrated
- 2 Copy of Layout Approval (in case of layout)Building Plan 2 Compressed.pdf · uploaded 26 Oct 2021Source
- 3 Copy of Layout Approval (in case of layout)Building Plan 3 Compressed.pdf · uploaded 26 Oct 2021Source
- 4 Copy of Layout Approval (in case of layout)Building Plan 4 Compressed.pdf · uploaded 26 Oct 2021Source
- 5 Copy of Layout Approval (in case of layout)Building Plan 5 Compressed.pdf · uploaded 26 Oct 2021Source
- 6 Copy of Layout Approval (in case of layout)Building Plan 6 Compressed.pdf · uploaded 26 Oct 2021Source
- 7 Copy of Layout Approval (in case of layout)Building Plan 7 Compressed.pdf · uploaded 26 Oct 2021Source
- 8 Copy of Layout Approval (in case of layout)Building Plan 8 Compressed.pdf · uploaded 26 Oct 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan 1 Compressed.pdf · uploaded 26 Oct 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan 2 Compressed.pdf · uploaded 26 Oct 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan 3 Compressed.pdf · uploaded 26 Oct 2021Source
- 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan 4 Compressed.pdf · uploaded 26 Oct 2021Source
- 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan 5 Compressed.pdf · uploaded 26 Oct 2021Source
- 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan 6 Compressed.pdf · uploaded 26 Oct 2021Source
- 7 Building Plan Approval / NA Order for plotted developmentBuilding Plan 7 Compressed.pdf · uploaded 26 Oct 2021Source
- 8 Building Plan Approval / NA Order for plotted developmentBuilding Plan 8 Compressed.pdf · uploaded 26 Oct 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentShreeji and Kashmire Commencement Compressed.pdf · uploaded 26 Oct 2021Source
- 1 Declaration about Commencement CertificateForm D.pdf · uploaded 26 Oct 2021Source
- 1 Declaration in FORM BForm-B Developers.pdf · uploaded 26 Oct 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 26 Oct 2021Source
- 1 Proforma of Allotment letterAgreement to Sale Draft.pdf · uploaded 26 Oct 2021Source
- 2 Proforma of Allotment letterAllotment Letter Format.pdf · uploaded 26 Oct 2021Source
- 9 Copy of Layout Approval (in case of layout)Plan 01 (1).pdf · uploaded 20 Jul 2022Source
- 10 Copy of Layout Approval (in case of layout)Plan 02 (1).pdf · uploaded 20 Jul 2022Source
- 11 Copy of Layout Approval (in case of layout)Plan 03 (1).pdf · uploaded 20 Jul 2022Source
- 12 Copy of Layout Approval (in case of layout)Plan 04 (1).pdf · uploaded 20 Jul 2022Source
- 13 Copy of Layout Approval (in case of layout)Plan 05 (1).pdf · uploaded 20 Jul 2022Source
- 14 Copy of Layout Approval (in case of layout)Plan 06 (1).pdf · uploaded 20 Jul 2022Source
- 15 Copy of Layout Approval (in case of layout)Plan 07 (1).pdf · uploaded 20 Jul 2022Source
- 16 Copy of Layout Approval (in case of layout)Plan 08 (1).pdf · uploaded 20 Jul 2022Source
- 9 Building Plan Approval / NA Order for plotted developmentPlan 01 (1).pdf · uploaded 20 Jul 2022Source
- 10 Building Plan Approval / NA Order for plotted developmentPlan 02 (1).pdf · uploaded 20 Jul 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentPlan 03 (1).pdf · uploaded 20 Jul 2022Source
- 12 Building Plan Approval / NA Order for plotted developmentPlan 04 (1).pdf · uploaded 20 Jul 2022Source
- 13 Building Plan Approval / NA Order for plotted developmentPlan 05 (1).pdf · uploaded 20 Jul 2022Source
- 14 Building Plan Approval / NA Order for plotted developmentPlan 06 (1).pdf · uploaded 20 Jul 2022Source
- 15 Building Plan Approval / NA Order for plotted developmentPlan 07 (1).pdf · uploaded 20 Jul 2022Source
- 16 Building Plan Approval / NA Order for plotted developmentPlan 08 (1).pdf · uploaded 20 Jul 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencemen Certificate.pdf · uploaded 20 Jul 2022Source
- 17 Building Plan Approval / NA Order for plotted developmentPlan001 (1).pdf · uploaded 8 Aug 2022Source
- 18 Building Plan Approval / NA Order for plotted developmentPlan00 (2).pdf · uploaded 8 Aug 2022Source
- 19 Building Plan Approval / NA Order for plotted developmentPlan00 (3).pdf · uploaded 8 Aug 2022Source
- 20 Building Plan Approval / NA Order for plotted developmentPlan00 (4).pdf · uploaded 8 Aug 2022Source
- 21 Building Plan Approval / NA Order for plotted developmentPlan00 (5).pdf · uploaded 8 Aug 2022Source
- 22 Building Plan Approval / NA Order for plotted developmentPlan00 (6).pdf · uploaded 8 Aug 2022Source
- 23 Building Plan Approval / NA Order for plotted developmentPlan00 (7).pdf · uploaded 8 Aug 2022Source
- 24 Building Plan Approval / NA Order for plotted developmentPlan00 (8).pdf · uploaded 8 Aug 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Shreeji Infinia.pdf · uploaded 22 Oct 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Shreeji Infinia Q3 22-23.pdf · uploaded 23 Nov 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Shreeji Infinia Q4 22-23.pdf · uploaded 23 Nov 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shreeji Infinia Q1.pdf · uploaded 23 Nov 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shreeji Infinia Q2.pdf · uploaded 23 Nov 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shreeji Infinia Q3 22-23.pdf · uploaded 23 Nov 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Shreeji Infinia Q4 22-23.pdf · uploaded 23 Nov 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shreeji Infinia Form 3 till 30062022.pdf · uploaded 24 Nov 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shreeji Infinia Form 3 till 30112022.pdf · uploaded 24 Nov 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shreeji Infinia Form 3 till 28022023.pdf · uploaded 24 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Shreeji Infinia 22-23.pdf · uploaded 24 Nov 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Shreeji Infinia Q1 22-05-2023.pdf · uploaded 21 Dec 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Shreeji Infinia Q1 22-05-2023.pdf · uploaded 21 Dec 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Shreeji Infinia Q1 22-05-2023_compressed.pdf · uploaded 21 Dec 2023Source
- 1 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-1-23.pdf · uploaded 18 Jan 2024Source
- 2 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-24-46.pdf · uploaded 18 Jan 2024Source
- 3 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-47-69.pdf · uploaded 18 Jan 2024Source
- 4 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-70-92.pdf · uploaded 18 Jan 2024Source
- 5 Status of ConveyanceDeclaration deed Shreeji Infinia_compressed-compressed-93-103.pdf · uploaded 18 Jan 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2-Shreeji Infinia Q3.pdf · uploaded 23 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 with Sign - compressed.pdf · uploaded 23 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1-SHREEJI INFINIA Q3.pdf · uploaded 24 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Shreeji Infinia Form 1 Q4.pdf · uploaded 20 Apr 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Shreeji Infinia Form 2 Q4.pdf · uploaded 5 Jul 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Shreeji Infinia Form 3 Q4_compressed.pdf · uploaded 5 Jul 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Q1 Shreeji Infinia.pdf · uploaded 29 Jul 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Infinia Q2.pdf · uploaded 16 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Not Exceeding Limit Self Declaration-Shreeji Infinia.pdf · uploaded 16 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Shreeji Infinia Q3.pdf · uploaded 14 Jan 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Shreeji Infinia Q2_2324.pdf · uploaded 28 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Infinia Q2_2324.pdf · uploaded 28 Jan 2025Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart Complition 31072024.pdf · uploaded 30 Jan 2025Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart Complition 31072024.pdf · uploaded 30 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Shreeji Infinia Form 5.pdf · uploaded 5 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Shreeji Infinia 31122024_compressed.pdf · uploaded 12 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 Shreeji Infinia.pdf · uploaded 16 Apr 2025Source
- Withdrawal Update Form 1Form 1 Infinia for RERA.pdf · uploaded 15 Jul 2025Source
- Withdrawal Update Form 2Form 2 Shreeji Infinia_0001.pdf · uploaded 15 Jul 2025Source
- Withdrawal Update Form 3Form 3 Infinia for Rera.pdf · uploaded 15 Jul 2025Source
- Occupational CertificateSHREEJI INFINIA COMPLETION CERTIFICATE.pdf · uploaded 21 Sep 2025Source
Technical
- DocumentBuilding Plan 1 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 1 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 2 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 3 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 4 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 5 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 6 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 7 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 8 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 2 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 3 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 4 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 5 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 6 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 7 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentBuilding Plan 8 Compressed.pdf · uploaded 26 Oct 2021Source
- DocumentPlan 01 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 02 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 03 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 04 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 05 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 06 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 07 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 08 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 01 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 02 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 03 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 04 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 05 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 06 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 07 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan 08 (1).pdf · uploaded 20 Jul 2022Source
- DocumentPlan001 (1).pdf · uploaded 8 Aug 2022Source
- DocumentPlan00 (2).pdf · uploaded 8 Aug 2022Source
- DocumentPlan00 (3).pdf · uploaded 8 Aug 2022Source
- DocumentPlan00 (4).pdf · uploaded 8 Aug 2022Source
- DocumentPlan00 (5).pdf · uploaded 8 Aug 2022Source
- DocumentPlan00 (6).pdf · uploaded 8 Aug 2022Source
- DocumentPlan00 (7).pdf · uploaded 8 Aug 2022Source
- DocumentPlan00 (8).pdf · uploaded 8 Aug 2022Source
Technical (Architect)
- DocumentForm 1 Infinia Q2.pdf · uploaded 16 Oct 2024Source
- DocumentForm 1 Shreeji Infinia Q3.pdf · uploaded 14 Jan 2025Source
- DocumentShreeji Infinia Q2_2324.pdf · uploaded 28 Jan 2025Source
- DocumentForm1 Shreeji Infinia.pdf · uploaded 16 Apr 2025Source
- DocumentForm 1 Infinia for RERA.pdf · uploaded 11 Jul 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nashik (M Corp.), Nashik taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 9 meter wide road
- South
- 30 Meter Wide DP Road
- East
- 30 meter wide DP road
- West
- Open Space
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sumit Kumath | — |
| Architect | Sumit M Kumath | — |
| Chartered accountant | Anil Dahiya | — |
| Chartered accountant | Lalit Rajendra Pawar | — |
| Chartered accountant | Piyush Verma | — |
| Engineer | Kishor Chopda | — |
| Engineer | Shailesh Dhumne | — |
| Other | Malani Khushal Mohanbhai | — |
| Other | Sunil Sontakke | — |
Source: MahaRERA project page. Contact details are not shown.