Shilpa Madhuvan

Certificate Signed

Nashik (M Corp.), Nashik 422101 |Promoter: Shilpa Estate

Residential / Group HousingRERAP51600046955
26 Sep 2022Registered with MahaRERA
15 Mar 2027Promised completion
15 Jul 2027Revised completionPushed back 4 months
3Buildings
288Units registered37 booked (13%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
3
Unit types
2BHK, 3BHK, Shop288 units in all
Address
S No 249/3/2B/2 of Deolali Shiwar, Kharjul Mala, Nashik Road EastPIN 422101
Designated bank account
171
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.97136, 73.83382
Shilpa Madhuvan is at latitude 19.97136, longitude 73.83382.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
26 Sep 2022
Promised
15 Mar 2027
Revised
15 Jul 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160004695526 Sep 202215 Mar 202715 Jul 2027Shilpa EstateProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Wing17—
B Wing16—
C Wing16—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

37 of 288 units booked (13%), as the promoter reported to MahaRERA

2BHK · 224 units3BHK · 56 unitsShop · 8 units
BuildingTypeCarpet areaUnitsBooked
Shilpa Madhuvan Wing A2BHK50.89 sq m · 548 sq ft5612
Shilpa Madhuvan Wing A3BHK67.16 sq m · 723 sq ft285
Shilpa Madhuvan Wing AShop13.71 sq m · 148 sq ft20
Shilpa Madhuvan Wing AShop18.47 sq m · 199 sq ft10
Shilpa Madhuvan Wing AShop22.05 sq m · 237 sq ft10
Shilpa Madhuvan Wing AShop24.06 sq m · 259 sq ft41
Shilpa Madhuvan Wing B2BHK44.17 sq m · 475 sq ft562
Shilpa Madhuvan Wing B2BHK48.57 sq m · 523 sq ft5613
Show all 11 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Shilpa Madhuvan Wing C2BHK44.21 sq m · 476 sq ft280
Shilpa Madhuvan Wing C2BHK50.89 sq m · 548 sq ft280
Shilpa Madhuvan Wing C3BHK69.05 sq m · 743 sq ft284

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 119 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardFirm Pan Card.pdf · uploaded 3 Sep 2022Source
  • OthersLOAN SANCTION 1.pdf · uploaded 31 May 2025Source
  • OthersFINANCIAL ENCUMBRANCE.pdf · uploaded 31 May 2025Source
  • OthersNEW COMMENCEMENT LETTER.pdf · uploaded 31 May 2025Source
  • OthersSEC UNSEC LOAN.pdf · uploaded 31 May 2025Source

Legal

  • Declaration Form BForm B.pdf · uploaded 3 Sep 2022Source
  • Legal Title reportTitle Report_final.pdf · uploaded 12 Sep 2022Source
Show all 120 documentsShow fewer documents

Legal

  • Others712 UTARA.pdf · uploaded 31 May 2025Source
  • OthersNEW COMMENCEMENT LETTER.pdf · uploaded 31 May 2025Source
  • OthersANNEXURE A NOTTERY_merged.pdf · uploaded 31 May 2025Source
  • Declaration Form BPURCHASE DEED MADHUVAN FINAL.pdf · uploaded 31 May 2025Source

Migrated

  • 1 PAN CardFirm Pan Card.pdf · uploaded 3 Sep 2022Source
  • 1 a Details of encumbrances concerned to FinanceEC Finance.pdf · uploaded 3 Sep 2022Source
  • 1 b Details of encumbrances concerned to LegalEC Legal.pdf · uploaded 3 Sep 2022Source
  • 1 Copy of Layout Approval (in case of layout)Building Plan 01.pdf · uploaded 3 Sep 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan 01.pdf · uploaded 3 Sep 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan 02.pdf · uploaded 3 Sep 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan 03.pdf · uploaded 3 Sep 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan 04.pdf · uploaded 3 Sep 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan 05.pdf · uploaded 3 Sep 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan 06.pdf · uploaded 3 Sep 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentBuilding Plan 07.pdf · uploaded 3 Sep 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE Updated.pdf · uploaded 3 Sep 2022Source
  • 1 Declaration about Commencement CertificateForm D.pdf · uploaded 3 Sep 2022Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 3 Sep 2022Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 3 Sep 2022Source
  • 1 Deviation Report with respect to Allotment letterDeviation of Allotment Letter.pdf · uploaded 3 Sep 2022Source
  • 1 Copy of the legal title reportTitle Report_final.pdf · uploaded 12 Sep 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report.pdf · uploaded 12 Sep 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 12 Sep 2022Source
  • 2 Proforma of Allotment letterDraft Agreement For Sale.pdf · uploaded 12 Sep 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameShilpa_Estate_Bank_Declaration.pdf · uploaded 12 Sep 2022Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report.pdf · uploaded 12 Sep 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 DEC 2022 SHILPA MADHUVAN.pdf · uploaded 5 May 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 DEC 2022 SHILPA MADHUVAN.pdf · uploaded 5 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 MARCH 2023 SHILPA MADHUVAN.pdf · uploaded 5 May 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 2023 SHILPA MADHUVAN.pdf · uploaded 5 May 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEPT 2023 SHILPA MADHUVAN.pdf · uploaded 5 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 DEC 2023 SHILPA MADHUVAN.pdf · uploaded 5 May 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 DEC 2022 SHILPA MADHUVAN .pdf · uploaded 5 May 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 DEC 2022 SHILPA MADHUVAN .pdf · uploaded 5 May 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MARCH 2023 SHILPA MADHUVAN.pdf · uploaded 5 May 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 JUNE 2023 SHILPA MADHUVAN .pdf · uploaded 5 May 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SEPT 2023 SHILPA MADHUVAN.pdf · uploaded 5 May 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 DEC 2023 MADHUVAN_compressed.pdf · uploaded 5 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 FY 202223 SHILPA MADHUVAN.pdf · uploaded 5 May 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 DEC 2022 SHILPA MADHUVAN.pdf · uploaded 10 May 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 MARCH 2023 SHILPA MADHUVAN.pdf · uploaded 10 May 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 JUNE 2023 SHILPA MADHUVAN.pdf · uploaded 10 May 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEPT 2023 SHILPA MADHUVAN.pdf · uploaded 10 May 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 DEC 2023 SHILPA MADHUVAN.pdf · uploaded 10 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 2022-23.pdf · uploaded 16 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A-2023-24.pdf · uploaded 16 Jul 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MARCH 2024_compressed.pdf · uploaded 16 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 2024.pdf · uploaded 16 Jul 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)JUNE 2024 SHILPA MADHUVAN.pdf · uploaded 1 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SEPT 2024 SHILPA MADHUVAN.pdf · uploaded 1 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Engineers Certificate Madhuvan march 2024.pdf · uploaded 16 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Engineers Certificate Madhuvan june 2024.pdf · uploaded 16 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Engineers Certificate Madhuvan SEPT 2024.pdf · uploaded 16 Jan 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MERGED.pdf · uploaded 1 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Madhuvan March 2024.pdf · uploaded 6 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 2024.pdf · uploaded 6 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEPT 2024.pdf · uploaded 6 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 DEC 2024.pdf · uploaded 6 Feb 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 DEC 2024.pdf · uploaded 6 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 DEC 2024.pdf · uploaded 6 Feb 2025Source
  • Form 1FORM 1 MARCH 2025.pdf · uploaded 23 Jun 2025Source
  • Form 2FORM 2 MARCH 2025.pdf · uploaded 23 Jun 2025Source
  • Form 3FORM 3 MARCH 2025_11zon.pdf · uploaded 23 Jun 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD MARCH 2025.pdf · uploaded 23 Jun 2025Source
  • Withdrawal Update Form 1FORM 1 MARCH 2025.pdf · uploaded 24 Jun 2025Source
  • Withdrawal Update Form 2FORM 2 MARCH 2025.pdf · uploaded 24 Jun 2025Source
  • Withdrawal Update Form 3FORM 3 MAY 2025.pdf · uploaded 24 Jun 2025Source
  • Form 5 (FY 2024-2025)Shilpa Madhuvan annual Report- FY 2024-25.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 1Architect Certificate-Q1 FY 2025-26-Jun 25.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 2Engineer certificate-Q1 FY 2025-26-Jun 25_compressed.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 3FORM 3 JUNE 2025_organized_11zon.pdf · uploaded 30 Sep 2025Source
  • Withdrawal Update Form 1FORM 1 SEPT 2025.pdf · uploaded 3 May 2026Source
  • Withdrawal Update Form 2Engineer certificate-Q1 FY 2025-26-Jun 25_compressed.pdf · uploaded 3 May 2026Source
  • Withdrawal Update Form 3FORM 3 SEPT 2025.pdf · uploaded 3 May 2026Source
  • Withdrawal Update Form 1FORM 1 DEC 2025.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 2FORM 2 DEC 2025.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 3FORM 3 DEC 2025_compressed.pdf · uploaded 4 May 2026Source
  • Withdrawal Update Form 1FORM 1 MARCH 2026.pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 2FORM 2 MARCH 2026.pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 3FORM 3 MARCH 2026.pdf · uploaded 15 May 2026Source
  • Form 5 (FY 2025-2026)FORM 5.pdf · uploaded 19 May 2026Source

Technical

  • DocumentBuilding Plan 01.pdf · uploaded 3 Sep 2022Source
  • DocumentBuilding Plan 01.pdf · uploaded 3 Sep 2022Source
  • DocumentBuilding Plan 02.pdf · uploaded 3 Sep 2022Source
  • DocumentBuilding Plan 03.pdf · uploaded 3 Sep 2022Source
  • DocumentBuilding Plan 04.pdf · uploaded 3 Sep 2022Source
  • DocumentBuilding Plan 05.pdf · uploaded 3 Sep 2022Source
  • DocumentBuilding Plan 06.pdf · uploaded 3 Sep 2022Source
  • DocumentBuilding Plan 07.pdf · uploaded 3 Sep 2022Source
  • DocumentHPSCANNER5125.pdf · uploaded 31 May 2025Source
  • DocumentHPSCANNER5126.pdf · uploaded 31 May 2025Source
  • DocumentHPSCANNER5127.pdf · uploaded 31 May 2025Source
  • DocumentHPSCANNER5128.pdf · uploaded 31 May 2025Source
  • DocumentHPSCANNER5130.pdf · uploaded 31 May 2025Source
  • DocumentNA ORDER.pdf · uploaded 31 May 2025Source
  • DocumentANNEXURE A.pdf · uploaded 1 Jun 2025Source
  • DocumentHPSCANNER5125.pdf · uploaded 23 Jun 2025Source
  • DocumentHPSCANNER5126.pdf · uploaded 23 Jun 2025Source
  • DocumentHPSCANNER5127.pdf · uploaded 23 Jun 2025Source
  • DocumentHPSCANNER5128.pdf · uploaded 23 Jun 2025Source
  • DocumentHPSCANNER5130.pdf · uploaded 23 Jun 2025Source
  • OthersNEW COMMENCEMENT LETTER.pdf · uploaded 23 Jun 2025Source

Technical (Architect)

  • DocumentForm 1 Madhuvan March 2024.pdf · uploaded 6 Feb 2025Source
  • DocumentFORM 1 JUNE 2024.pdf · uploaded 6 Feb 2025Source
  • DocumentFORM 1 SEPT 2024.pdf · uploaded 6 Feb 2025Source
  • DocumentFORM 1 DEC 2024.pdf · uploaded 6 Feb 2025Source
  • DocumentFORM 1 MARCH 2026.pdf · uploaded 15 May 2026Source

Technical (Engineer)

  • DocumentFORM 2 Engineers Certificate Madhuvan march 2024.pdf · uploaded 16 Jan 2025Source
  • DocumentFORM 2 Engineers Certificate Madhuvan june 2024.pdf · uploaded 16 Jan 2025Source
  • DocumentFORM 2 Engineers Certificate Madhuvan SEPT 2024.pdf · uploaded 16 Jan 2025Source
  • DocumentFORM 2 DEC 2024.pdf · uploaded 6 Feb 2025Source
  • DocumentFORM 2 MARCH 2026.pdf · uploaded 15 May 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

S No 249/3/2B/2 of Deolali Shiwar

Boundaries

North
S No 250 and 253
South
DP Road
East
S No 249 Part
West
S No 249 Part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Pankaj Jadhav—
Chartered accountantBhalgat Bothra & Associates Ca Tushar Lokhande—
Chartered accountantCa Prasad Yeola—
EngineerEr Mahendra Ukha Patil—
OtherMahendra Madhukar Chaudhari—
OtherVelani Constructions—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology