Sejal Glory Apartment

Completed

Nashik (M Corp.), Nashik 422013 |Promoter: Sejal Buildcon Pvt Ltd

Residential / Group HousingRERAP51600015796
26 Mar 2018Registered with MahaRERA
9 Mar 2023Promised completion
1Building
20Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
1BHK, 2BHK20 units in all
Land area for this project
637 sq m (6,862 sq ft)
Permissible built-up area
956 sq m (10,291 sq ft)
Sanctioned built-up area
892 sq m (9,605 sq ft)
Address
Plot No 21 Plus 22 Plus 23 S No 82/1A, Canal road, Shinde NagarPIN 422013
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.99593, 73.78425
Sejal Glory Apartment is at latitude 19.99593, longitude 73.78425.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 9 Mar 2023

The latest completion date on record passed 3 years and 7 months ago.

Registered
26 Mar 2018
Promised
9 Mar 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001579626 Mar 20189 Mar 2023—Sejal Buildcon Pvt LtdProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sejal Glory Apartment620

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

20 units registered

1BHK · 4 units2BHK · 16 units
TypeCarpet areaUnits
1BHK36.39 sq m · 392 sq ft4
2BHK45.46 sq m · 489 sq ft4
2BHK45.47 sq m · 489 sq ft4
2BHK46.28 sq m · 498 sq ft4
2BHK46.35 sq m · 499 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000020
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sejal Glory Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Internal Roads & FootpathsNot applicable
  • Water SupplyObtained from NMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank done100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank done100%
  • Storm Water DrainsNot applicable
Show all 17 activitiesShow fewer activities
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting done100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationIndividual Meters Taken100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 22 filings listed on MahaRERA's project page

Title report

Form B

Encumbrance details

Commencement certificate

Occupancy / completion certificate

  • Occupancy / completion certificate19 Feb 2021ViewSource

Form 1

Form 2

Form 4

Show all 39 documentsShow fewer documents

Other (3)

Form 5 (2)

Registration certificate

Allotment letter

Layout plan

Building plan

Document library

  • Copy of the legal title reporttitle report.pdf · uploaded 19 Mar 2018View
  • Details of encumbrancesNon Encumbrance certificate.pdf · uploaded 19 Mar 2018View
  • Copy of Layout Approval (in case of layout)LAY OUT.pdf · uploaded 19 Mar 2018View
  • Declaration in FORM BDeclaration affidavit.pdf · uploaded 19 Mar 2018View
  • Proforma of Allotment letterAgreement for sale c.pdf · uploaded 19 Mar 2018View
  • Building Plan Approval (IOD)PLAN.pdf · uploaded 19 Mar 2018View
  • Commencement Certificates / NA Order for plotted developmentcommencement certificate.pdf · uploaded 19 Mar 2018View
  • Status of ConveyanceApartment dec.pdf · uploaded 26 Jul 2019View
  • OtherCompletion certificate S G.pdf · uploaded 26 Jul 2019View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Declaration of Apartment.pdf · uploaded 19 Feb 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 19 Feb 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Feb 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Feb 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 19 Feb 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 - 18-19.pdf · uploaded 20 Feb 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - 19-20.pdf · uploaded 20 Feb 2021View

Promoter documents

  • Legal Title reporttitle report.pdf · uploaded 19 Mar 2018View
  • Declaration Form BDeclaration affidavit.pdf · uploaded 19 Mar 2018View

Technical documents

  • Layout ApprovalLAY OUT.pdfView
  • Building Plan ApprovalPLAN.pdfView

Other legal documents

  • OtherCompletion certificate S G.pdfView

Proforma allotment letter

  • Proforma allotment letterAgreement for sale c.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

82/1APlot No 21 Plus 22 Plus 23 S No 82/1A

As published on MahaRERA's project page

Plot No 21 Plus 22 Plus 23 S No 82/1A

Boundaries

North
Plot No 24
South
7 point 5 Meter wide road
East
Plot no 28 and 29 and 30
West
7 point 5 Meter wide road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRamesh Wagh—
Chartered accountantAmol Mahajan—
Chartered accountantNirav Shah—
EngineerRamesh Wagh—
OtherAjaykumar Yadav—
OtherAshok Kshirsagar—
OtherChandrakant Thorat—
OtherDattatray Pradhan—
Show all 15 professionalsShow fewer professionals
RoleNameRegistration no.
OtherDaulat Khairnar—
OtherDeepak Pawar—
OtherManoj Thorat—
OtherRamnath Kumar—
OtherSachin More—
OtherShamsir Ansari—
OtherSNS RERA Consultants—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology