Sai Shilp Residency- Bhakti

Completed

Nashik (M Corp.), Nashik 422011 |Promoter: Om Sai Buildcon

Residential / Group HousingRERAP51600011886
31 Aug 2017Registered with MahaRERA
30 Jun 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
469 sq m (5,051 sq ft)
Permissible built-up area
888 sq m (9,560 sq ft)
Sanctioned built-up area
656 sq m (7,062 sq ft)
Address
Plot No 6 7 S No 463PIN 422011
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.98940, 73.80972
Sai Shilp Residency- Bhakti is at latitude 19.98940, longitude 73.80972.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2024

The latest completion date on record passed 2 years and 4 months ago.

Registered
31 Aug 2017
Promised
30 Jun 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001188631 Aug 201730 Jun 2024—Om Sai BuildconProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sai Shilp Residency6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000022
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sai Shilp Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWORK COMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WORK COMPLETED. NO STP100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWORK COMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWORK COMPLETED. ONLY ELECTRIC METER BOX100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

23 documents held by Deedo, 31 filings listed on MahaRERA's project page

Titles

Form b

Encumbrance

Commencement certificate

Form 1

Form 2

Form 4

Form 5s

Registration certificate

Others

Allotment letter

Building plan

Layout plan

Document library

  • Copy of the legal title reportSUBHODH SHAH TITLE REPORT.pdf · uploaded 3 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT BHAKTI.pdf · uploaded 3 Aug 2017View
  • Copy of the legal title reportTitle clear pdf_split_1 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Copy of the legal title reportTitle clear pdf_split_2 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Copy of the legal title reportTitle clear pdf_split_3 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Copy of the legal title reportTitle clear pdf_split_4 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Copy of the legal title reportTitle clear pdf_split_5 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Copy of Layout Approval (in case of layout)OM SAi BUILDCON LAYOUT.pdf · uploaded 3 Aug 2017View
  • Building Plan Approval (IOD)Bhakti Building Plan.pdf · uploaded 3 Aug 2017View
  • OtherCLEARIFICATION REGARDING CHANGE IN CARPET AREA- BHAKTI.pdf · uploaded 3 Aug 2017View
  • Details of encumbrancesEncumbrance.pdf · uploaded 3 Aug 2017View
  • Declaration in FORM BFORM B BHAKTI.pdf · uploaded 3 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate-bhakti.pdf · uploaded 3 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CER -BHAKTI.pdf · uploaded 3 Aug 2017View
  • Proforma of Allotment letterPERFORMA SALE.pdf · uploaded 3 Aug 2017View
  • Certificates of Architect (Form 4)Form 4.pdf · uploaded 5 Apr 2018View
  • OtherCompletion certificate.pdf · uploaded 5 Apr 2018View
  • Certificates of CA (Form 5)RERA AUDIT REPORT BHAKTI-ilovepdf-compressed.pdf · uploaded 12 Oct 2018View
  • Certificates of CA (Form 5)Rera Audit report Letter Head updated.pdf · uploaded 27 Oct 2018View

Promoter documents

  • Legal Title reportSUBHODH SHAH TITLE REPORT.pdf · uploaded 3 Aug 2017View
  • Legal Title reportTitle clear pdf_split_1 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Legal Title reportTitle clear pdf_split_2 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Legal Title reportTitle clear pdf_split_3 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Legal Title reportTitle clear pdf_split_4 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Legal Title reportTitle clear pdf_split_5 RAHUL JAGTAP.pdf · uploaded 3 Aug 2017View
  • Declaration Form BFORM B BHAKTI.pdf · uploaded 3 Aug 2017View

Technical documents

  • Building Plan ApprovalBhakti Building Plan.pdfView
  • Layout ApprovalOM SAi BUILDCON LAYOUT.pdfView

Other legal documents

  • OtherCLEARIFICATION REGARDING CHANGE IN CARPET AREA- BHAKTI.pdfView
  • OtherCompletion certificate.pdfView

Proforma allotment letter

  • Proforma allotment letterPERFORMA SALE.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

463PLOT NO 6 7 S NO 463

As published on MahaRERA's project page

PLOT NO 6 7 S NO 463

Boundaries

North
Sr No 462 P
South
Plot No 5
East
Colony Road
West
Plot No 1 And 2

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSankhla Associates—
EngineerSanjiv Patel—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology