Sadguru Homes
Certificate SignedNashik (M Corp.), Nashik 422003 |Promoter: Shree Sadguru Homes
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 1RK, 2BHK, Shop170 units in all
- Address
- 2/4/5/6 Sno 188/2a 1j/1 D1j/1t, Bapa Sitaram Marg, HirawadiPIN 422003
- Designated bank account
- 220
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2028
- Registered
- 9 Sep 2019
- Promised
- 31 Dec 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600022296 | 9 Sep 2019 | 31 Dec 2028 | — | Shree Sadguru Homes | Project page |
Units and parking
0 of 170 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Sadguru Paradise | 1BHK | 28.09 sq m · 302 sq ft | 3 | 0 |
| Sadguru Paradise | 1BHK | 28.12 sq m · 303 sq ft | 3 | 0 |
| Sadguru Paradise | 1BHK | 28.32 sq m · 305 sq ft | 3 | 0 |
| Sadguru Paradise | 1BHK | 28.34 sq m · 305 sq ft | 3 | 0 |
| Sadguru Paradise | 1BHK | 28.38 sq m · 305 sq ft | 3 | 0 |
| Sadguru Paradise | 1BHK | 28.4 sq m · 306 sq ft | 3 | 0 |
| Sadguru Paradise | 1BHK | 28.47 sq m · 306 sq ft | 9 | 0 |
| Sadguru Paradise | 1BHK | 28.5 sq m · 307 sq ft | 9 | 0 |
Show all 63 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Sadguru Paradise | 1BHK | 42.6 sq m · 459 sq ft | 2 | 0 |
| Sadguru Paradise | 1BHK | 42.62 sq m · 459 sq ft | 1 | 0 |
| Sadguru Paradise | 1RK | 16.45 sq m · 177 sq ft | 3 | 0 |
| Sadguru Paradise | 1RK | 16.58 sq m · 178 sq ft | 3 | 0 |
| Sadguru Paradise | 1RK | 16.67 sq m · 179 sq ft | 3 | 0 |
| Sadguru Paradise | 1RK | 16.67 sq m · 179 sq ft | 6 | 0 |
| Sadguru Paradise | 1RK | 16.8 sq m · 181 sq ft | 6 | 0 |
| Sadguru Paradise | 1RK | 16.81 sq m · 181 sq ft | 3 | 0 |
| Sadguru Paradise | 1RK | 16.9 sq m · 182 sq ft | 3 | 0 |
| Sadguru Paradise | 1RK | 16.9 sq m · 182 sq ft | 12 | 0 |
| Sadguru Paradise | 1RK | 17.03 sq m · 183 sq ft | 6 | 0 |
| Sadguru Paradise | 1RK | 17.03 sq m · 183 sq ft | 6 | 0 |
| Sadguru Paradise | 1RK | 17.03 sq m · 183 sq ft | 3 | 0 |
| Sadguru Paradise | 1RK | 22.23 sq m · 239 sq ft | 2 | 0 |
| Sadguru Paradise | 1RK | 22.47 sq m · 242 sq ft | 2 | 0 |
| Sadguru Paradise | 1RK | 22.68 sq m · 244 sq ft | 1 | 0 |
| Sadguru Paradise | 2BHK | 54.32 sq m · 585 sq ft | 1 | 0 |
| Sadguru Paradise | 2BHK | 56.18 sq m · 605 sq ft | 1 | 0 |
| Sadguru Paradise | 2BHK | 62.59 sq m · 674 sq ft | 1 | 0 |
| Sadguru Paradise | 2BHK | 64.48 sq m · 694 sq ft | 1 | 0 |
| Sadguru Rudra | 1BHK | 28.52 sq m · 307 sq ft | 1 | 0 |
| Sadguru Rudra | 1BHK | 33.26 sq m · 358 sq ft | 1 | 0 |
| Sadguru Rudra | 2BHK | 44.82 sq m · 482 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 44.82 sq m · 482 sq ft | 3 | 0 |
| Sadguru Rudra | 2BHK | 45.91 sq m · 494 sq ft | 3 | 0 |
| Sadguru Rudra | 2BHK | 45.91 sq m · 494 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 46.01 sq m · 495 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 46.01 sq m · 495 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 46.01 sq m · 495 sq ft | 1 | 0 |
| Sadguru Rudra | 2BHK | 46.28 sq m · 498 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 46.28 sq m · 498 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 46.5 sq m · 501 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 46.5 sq m · 501 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 46.5 sq m · 501 sq ft | 1 | 0 |
| Sadguru Rudra | 2BHK | 46.55 sq m · 501 sq ft | 4 | 0 |
| Sadguru Rudra | 2BHK | 46.57 sq m · 501 sq ft | 4 | 0 |
| Sadguru Rudra | 2BHK | 46.81 sq m · 504 sq ft | 3 | 0 |
| Sadguru Rudra | 2BHK | 46.81 sq m · 504 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 46.86 sq m · 504 sq ft | 3 | 0 |
| Sadguru Rudra | 2BHK | 46.86 sq m · 504 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 48.13 sq m · 518 sq ft | 1 | 0 |
| Sadguru Rudra | 2BHK | 48.13 sq m · 518 sq ft | 2 | 0 |
| Sadguru Rudra | 2BHK | 48.13 sq m · 518 sq ft | 1 | 0 |
| Sadguru Rudra | 2BHK | 48.2 sq m · 519 sq ft | 4 | 0 |
| Sadguru Rudra | Shop | 14.64 sq m · 158 sq ft | 4 | 0 |
| Sadguru Rudra | Shop | 16.5 sq m · 178 sq ft | 2 | 0 |
| Sadguru Rudra | Shop | 17.14 sq m · 184 sq ft | 1 | 0 |
| Sadguru Rudra | Shop | 23.67 sq m · 255 sq ft | 1 | 0 |
| Sadguru Rudra | Shop | 23.97 sq m · 258 sq ft | 1 | 0 |
| Sadguru Rudra | Shop | 26.92 sq m · 290 sq ft | 1 | 0 |
| Sadguru Rudra | Shop | 27.45 sq m · 295 sq ft | 2 | 0 |
| Sadguru Rudra | Shop | 28.35 sq m · 305 sq ft | 1 | 0 |
| Sadguru Rudra | Shop | 29.29 sq m · 315 sq ft | 1 | 0 |
| Sadguru Rudra | Shop | 30.6 sq m · 329 sq ft | 1 | 0 |
| Sadguru Rudra | Shop | 36.54 sq m · 393 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 126 filings listed on MahaRERA's project page
Finance
- PAN CardPAN SS Homes.pdf · uploaded 19 Aug 2019Source
Legal
Migrated
- 1 PAN CardPAN SS Homes.pdf · uploaded 19 Aug 2019Source
- 1 Copy of the legal title reportSS HOME LEGAL TITLE.pdf · uploaded 19 Aug 2019Source
- 1 Details of encumbrancesEncumbere certificate SSHomes.pdf · uploaded 19 Aug 2019Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT SSHOMES 1.pdf · uploaded 19 Aug 2019Source
Show all 127 documentsShow fewer documents
Migrated
- 2 Copy of Layout Approval (in case of layout)LAYOUT SSHOMES 2.pdf · uploaded 19 Aug 2019Source
- 3 Copy of Layout Approval (in case of layout)LAYOUT SSHOMES 3.pdf · uploaded 19 Aug 2019Source
- 4 Copy of Layout Approval (in case of layout)LAYOUT SSHOMES 4.pdf · uploaded 19 Aug 2019Source
- 5 Copy of Layout Approval (in case of layout)LAYOUT SSHOMES 5.pdf · uploaded 19 Aug 2019Source
- 6 Copy of Layout Approval (in case of layout)LAYOUT SSHOMES 7.pdf · uploaded 19 Aug 2019Source
- 1 Building Plan Approval / NA Order for plotted developmentss homes Commencement certificate.pdf · uploaded 19 Aug 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentss homes Commencement certificate.pdf · uploaded 19 Aug 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTI FORM 3 182019.pdf · uploaded 19 Aug 2019Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTI ANEX A 182019.pdf · uploaded 19 Aug 2019Source
- 1 Proforma of Allotment letteragreement sadguru homes.pdf · uploaded 19 Aug 2019Source
- 2 Proforma of Allotment letterallotment sadguru homes1.pdf · uploaded 19 Aug 2019Source
- 1 Declaration in FORM BForm B Declaration(1).pdf · uploaded 7 Sep 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ENNG FORM B 1819.pdf · uploaded 7 Sep 2019Source
- 2 a Details of encumbrances concerned to FinanceForm B Declaration(1).pdf · uploaded 18 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalForm B Declaration(1).pdf · uploaded 18 Feb 2023Source
- 1 Declaration about Commencement CertificateForm d Deceleration.pdf · uploaded 18 Feb 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate 30_09_2020.pdf · uploaded 18 Feb 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate 31_03_2021Homes.pdf · uploaded 18 Feb 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certificate homes 30_09_22.pdf · uploaded 18 Feb 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate 31_03_2022 Homes .pdf · uploaded 18 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A rudra and paradise March 20.pdf · uploaded 18 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A for rudra and paradise March 2021.pdf · uploaded 18 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A rudra paradise March 2022.pdf · uploaded 18 Feb 2023Source
- 1 Disclosure of sold/ booked inventorysales area 31032023.pdf · uploaded 18 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5-19-20-Shree Sadguru Homes.pdf · uploaded 3 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form5-20-21-Shree Sadguru Homes.pdf · uploaded 3 Mar 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate July 2022.pdf · uploaded 26 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate September 2022.pdf · uploaded 26 Oct 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate December 2022.pdf · uploaded 26 Oct 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate March 2023.pdf · uploaded 26 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer's Certificate 30_6_22.pdf · uploaded 26 Oct 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer's Certificate 30_9_22.pdf · uploaded 26 Oct 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer's Certificate 31_12_22.pdf · uploaded 26 Oct 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer's Certificate 31_3_23.pdf · uploaded 26 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-20-21-Shree Sadguru Homes.pdf · uploaded 22 Dec 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3-21-22-Shree Sadguru homes.pdf · uploaded 22 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5-21-22-Shree SadguruHomes.pdf · uploaded 22 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 22-23-SSH.pdf · uploaded 22 Dec 2023Source
- 2 Disclosure of sold/ booked inventoryDOS Paradise 3132022.pdf · uploaded 25 Dec 2023Source
- 3 Disclosure of sold/ booked inventoryDOS Paradise 3062022.pdf · uploaded 25 Dec 2023Source
- 4 Disclosure of sold/ booked inventoryDOS Paradise 3092022.pdf · uploaded 25 Dec 2023Source
- 5 Disclosure of sold/ booked inventoryDOS Paradise 31122022.pdf · uploaded 25 Dec 2023Source
- 1 CERSAI detailsDOS Paradise 3132023.pdf · uploaded 25 Dec 2023Source
- 6 Disclosure of sold/ booked inventoryDOS Paradise 3062023.pdf · uploaded 25 Dec 2023Source
- 7 Disclosure of sold/ booked inventoryDOS Paradise 3092023.pdf · uploaded 25 Dec 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate July 2023.pdf · uploaded 9 Jan 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate September 2023.pdf · uploaded 9 Jan 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate December 2023.pdf · uploaded 9 Jan 2024Source
- 8 Disclosure of sold/ booked inventoryDOS Paradise 31122023.pdf · uploaded 9 Jan 2024Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer's Certificate JUNE 2023.pdf · uploaded 7 Feb 2024Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer's Certificate SEPT 2023.pdf · uploaded 7 Feb 2024Source
- 7 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer's Certificate DEC 2023.pdf · uploaded 7 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_June 24.pdf · uploaded 17 Mar 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Sep 24.pdf · uploaded 17 Mar 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Dec 24.pdf · uploaded 17 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_March 24.pdf · uploaded 17 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Homes_2023-24.pdf · uploaded 17 Mar 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Homes_June 24.pdf · uploaded 17 Mar 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Homes_Sep 24.pdf · uploaded 17 Mar 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Homes_Dec 24.pdf · uploaded 17 Mar 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_March 23.pdf · uploaded 17 Mar 2025Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Dec 24.pdf · uploaded 17 Mar 2025Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Sep 24.pdf · uploaded 17 Mar 2025Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_June 24.pdf · uploaded 17 Mar 2025Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_March 24.pdf · uploaded 17 Mar 2025Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Dec 23.pdf · uploaded 17 Mar 2025Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Sep 23.pdf · uploaded 17 Mar 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_June 23.pdf · uploaded 17 Mar 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Dec 22.pdf · uploaded 17 Mar 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Sep 22.pdf · uploaded 17 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_June 22.pdf · uploaded 17 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure_March 24.pdf · uploaded 17 Mar 2025Source
- 2 Disclosure of sold/ booked inventoryDisclosure_June 24.pdf · uploaded 17 Mar 2025Source
- 3 Disclosure of sold/ booked inventoryDisclosure_Sep 24.pdf · uploaded 17 Mar 2025Source
- 4 Disclosure of sold/ booked inventoryDisclosure_Dec 24.pdf · uploaded 17 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Homes_2022-23 - converted.pdf · uploaded 3 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA Audit Report_23-24_Homes.pdf · uploaded 5 Apr 2025Source
- Withdrawal Update Form 1Architect Certificate_June 25.pdf · uploaded 22 Sep 2025Source
- Withdrawal Update Form 1Architect Certificate_June 25.pdf · uploaded 22 Sep 2025Source
- Withdrawal Update Form 2Engineer Certificate_June 25.pdf · uploaded 22 Sep 2025Source
- Withdrawal Update Form 2Engineer Certificate_June 25.pdf · uploaded 22 Sep 2025Source
- Withdrawal Update Form 3CA Certificate homes_June 2025.pdf · uploaded 22 Sep 2025Source
- Withdrawal Update Form 3CA Certificate homes_June 2025.pdf · uploaded 22 Sep 2025Source
- Withdrawal Update Form 1Form 1 Sep 25.pdf · uploaded 23 Jan 2026Source
- Withdrawal Update Form 2Form 2 Sep 25.pdf · uploaded 23 Jan 2026Source
- Withdrawal Update Form 3Form 3 Sep 25.pdf · uploaded 23 Jan 2026Source
- Withdrawal Update Form 1Form 1_Dec 25.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 2Form 2_Dec 25.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 3Form 3_Dec 25.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 1Form 1_Mar 26.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 2Form 2_Mar 26.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 3Form 3_Mar 26.pdf · uploaded 19 May 2026Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 29 Jul 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 29 Jul 2026Source
- Withdrawal Update Form 3F 3 - SADGURU HOMES (1)_compressed.pdf · uploaded 29 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A FY 25-26.pdf · uploaded 7 Aug 2026Source
Technical
- DocumentLAYOUT SSHOMES 1.pdf · uploaded 19 Aug 2019Source
- DocumentLAYOUT SSHOMES 2.pdf · uploaded 19 Aug 2019Source
- DocumentLAYOUT SSHOMES 3.pdf · uploaded 19 Aug 2019Source
- DocumentLAYOUT SSHOMES 4.pdf · uploaded 19 Aug 2019Source
- DocumentLAYOUT SSHOMES 5.pdf · uploaded 19 Aug 2019Source
- DocumentLAYOUT SSHOMES 7.pdf · uploaded 19 Aug 2019Source
- Documentss homes Commencement certificate.pdf · uploaded 19 Aug 2019Source
Technical (Architect)
Technical (Engineer)
- DocumentForm 2_Sep 22.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2_Dec 22.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2_March 23.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2_June 23.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2_Sep 23.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2_Dec 23.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2_March 24.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2_June 24.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2_Sep 24.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2_Dec 24.pdf · uploaded 17 Mar 2025Source
- DocumentForm 2.pdf · uploaded 29 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nashik (M Corp.), Nashik taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Open Space Of Sno 188-2 Part
- South
- 30 Mtr D P Road
- East
- Sno 188-2 Part
- West
- Plot No 2
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Kiran Moghe | — |
| Chartered accountant | Ashok S Zawar & Co | — |
| Chartered accountant | Pravin E Pise | — |
| Engineer | Girish T Kulkarni | — |
| Engineer | Sanjeev Patel | — |
| Other | Karmachibhai Patel | — |
| Other | Ravi Chavan | — |
Source: MahaRERA project page. Contact details are not shown.