Ramchandra Nagar

Active

Nashik (M Corp.), Nashik 422004 |Promoter: Deshpande Constructions & Land Developers

25 Aug 2019Registered with MahaRERA
30 Dec 2028Promised completion
5Buildings
1MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
5
Land area for this project
3,391 sq m (36,500 sq ft)
Permissible built-up area
18,421 sq m (1,98,277 sq ft)
Sanctioned built-up area
7,910 sq m (85,139 sq ft)
Recreational open space
1,213 sq m (13,057 sq ft)
Planning authority
Nashik Municipal Corporation
Address
232/4, Dindori Road, MhasrulPIN 422004
Designated bank account
Punjab National Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.04196, 73.80742
Ramchandra Nagar is at latitude 20.04196, longitude 73.80742.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2028

Registered
25 Aug 2019
Promised
30 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160002205925 Aug 201930 Dec 2028—Deshpande Constructions & Land DevelopersProject page

5 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
C WingClosed/Covered00001
C WingOpen Space00000
D WingClosed/Covered01001
D WingOpen Space00000
E WingClosed/Covered00001
E WingOpen Space00000
F WingClosed/Covered00000
F WingOpen Space000016

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

C Wing

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

D Wing

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

E Wing

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

F Wing

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyTo be obtained from NMC on completion of project0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AT THE TIME OF COMPLETION OF WHOLE PROJECT0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAT THE TIME OF COMPLETION OF WHOLE PROJECT0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsAT THE TIME OF COMPLETION OF WHOLE PROJECT0%
  • Treatment And Disposal Of Sewage And Sullage WaterAT THE TIME OF COMPLETION OF WHOLE PROJECT0%
  • Solid Waste Management And DisposalAT THE TIME OF COMPLETION OF WHOLE PROJECT0%
  • Water conservation /Rain water harvestingAT THE TIME OF COMPLETION OF WHOLE PROJECT0%
  • Energy managemcntAT THE TIME OF COMPLETION OF WHOLE PROJECT0%
  • Fire protection and fire safety requirementsAT THE TIME OF COMPLETION OF WHOLE PROJECT0%
  • Electrical meter room, sub-station, receiving stationAT THE TIME OF COMPLETION OF WHOLE PROJECT0%
  • Aggregate area of recreational Open Space1213 sqm0%
  • Open ParkingAS PER NMC16%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

73 documents held by Deedo, 84 filings listed on MahaRERA's project page

Title report

Encumbrance details (3)

Commencement certificate (3)

Allotment letter (5)

Show all 157 documentsShow fewer documents

Allotment letter (5)

Form 2 (16)

Form B (2)

Form 1 (16)

Registration certificate

Form 5 (6)

Other (10)

Layout plan

Building plan (9)

Document library

  • Copy of Layout Approval (in case of layout)scan295.pdf · uploaded 8 Aug 2019View
  • Copy of the legal title reportTITLE REPORT.pdf · uploaded 8 Aug 2019View
  • Details of encumbrancesDetails of encumbrances.pdf · uploaded 8 Aug 2019View
  • Details of encumbrancesDetails of encumbrances1.pdf · uploaded 8 Aug 2019View
  • Details of encumbrancesDetails of encumbrances2.pdf · uploaded 8 Aug 2019View
  • Proforma of Allotment letterALLOTMENT LETTER 1.pdf · uploaded 8 Aug 2019View
  • Proforma of Allotment letterALLOTMENT LETTER 2.pdf · uploaded 8 Aug 2019View
  • Proforma of Allotment letterALLOTMENT LETTER 3.pdf · uploaded 8 Aug 2019View
  • Proforma of Allotment letterAFF OF AGREEMENT TO SALE 1.pdf · uploaded 8 Aug 2019View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE1.pdf · uploaded 8 Aug 2019View
  • Building Plan Approval / NA Order for plotted developmentscan296.pdf · uploaded 9 Aug 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)DCL Engineer Certificate for RERA.pdf · uploaded 9 Aug 2019View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE2.pdf · uploaded 14 Aug 2019View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE3.pdf · uploaded 14 Aug 2019View
  • Proforma of Allotment letterAFF OF AGREEMENT TO SALE.pdf · uploaded 14 Aug 2019View
  • Proforma of Allotment letterAFF OF AGREEMENT TO SALE 1.pdf · uploaded 14 Aug 2019View
  • Declaration in FORM BNOTARISED FORM B.pdf · uploaded 19 Aug 2019View
  • Declaration in FORM BNOTARISED FORM B1.pdf · uploaded 19 Aug 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE RAMCHANDRA NAGAR_compressed.pdf · uploaded 17 Aug 2021View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 8.pdf · uploaded 16 Nov 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 7.pdf · uploaded 16 Nov 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 6.pdf · uploaded 16 Nov 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 5.pdf · uploaded 16 Nov 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 4.pdf · uploaded 16 Nov 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 3.pdf · uploaded 16 Nov 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 2.pdf · uploaded 16 Nov 2022View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan 1-compressed.pdf · uploaded 16 Nov 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5- 2019-20.pdf · uploaded 7 Mar 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FROM 5 2020-21.pdf · uploaded 7 Mar 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FROM 5- 2021-22.pdf · uploaded 7 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-19-20 ARCHITECTS CERTIFICATE.pdf · uploaded 20 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- ARCHITECTS CERTIFICATE-20-21.pdf · uploaded 20 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- ARCHITECTS CERTIFICATE - Dec 22.pdf · uploaded 20 Mar 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- ARCHITES CERTIFICATE - 21-22.pdf · uploaded 20 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - ENGINEERS CERTIFICATE-2019-20.pdf · uploaded 20 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- ENGINEERS CERTIFICATE - 2020-21.pdf · uploaded 20 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- ENGINEERS CERTIFICATE- 2021-22.pdf · uploaded 20 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- ENGINEERS CERTIFICATE-Dec 2022.pdf · uploaded 20 Mar 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 New.pdf · uploaded 30 Sep 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 31 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE FORM 1 DATE 30-09-2023.pdf · uploaded 6 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE FORM-2 DATE 31-3-2023.pdf · uploaded 6 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE FORM-2 DATE 30-9-2023.pdf · uploaded 6 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEERS CERTIFICATE.pdf · uploaded 30 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 31 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE.pdf · uploaded 19 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE.pdf · uploaded 19 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ARCHITECTS CERTIFICATE.pdf · uploaded 12 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE.pdf · uploaded 12 Aug 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEERS CERTIFICATE DATE 19-10-2024.pdf · uploaded 2 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Arch Certificate.pdf · uploaded 3 Dec 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 DATE 31-12-2024 FY 2023-24.pdf · uploaded 1 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)DATE 20-1-2025 FORM-1 ARCHTECTS CERTIFICATE .pdf · uploaded 4 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)DATE 20-1-2025 FORM-2 ENGINEERS CERTIFICATE .pdf · uploaded 4 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)DCL ARCHITECTS CERTIFICATE.pdf · uploaded 7 May 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate Form 2.pdf · uploaded 12 May 2025View
  • Form 1FORM 1 ARCHITECTS CERTIFICATE DATE 20-07-2025.pdf · uploaded 26 Aug 2025View
  • Form 2FORM -2 ENGINEERS CERTIFICATE DATE 20-07-2025.pdf · uploaded 26 Aug 2025View
  • Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD - BOOKED INVENTORY (BUILDING WISE).pdf · uploaded 26 Aug 2025View
  • Form 5 (FY 2024-2025)FORM -5 SEE REGULATION 4 DATE 30-09-2025.pdf · uploaded 3 Oct 2025View
  • Form 1FORM 1 ARCHITECTS CERTIFICATE DATE 20-10-2025.pdf · uploaded 6 Dec 2025View
  • Form 2FORM 2 ENGINEERS CERTIFICATE DATE 20-10-2025.pdf · uploaded 6 Dec 2025View
  • Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD BOOKED INVENTORY DATE 06-12-2025.pdf · uploaded 6 Dec 2025View
  • Form 1Architect Certificate-DCL Qtr 3.pdf · uploaded 20 Feb 2026View
  • Form 2DCL- Engineer Certificate Dec 2025.pdf · uploaded 20 Feb 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of sold and Booked Inventory.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 1Architect Certificate-DCL Qtr 3.pdf · uploaded 18 Mar 2026View
  • Withdrawal Update Form 2DCL- Engineer Certificate Dec 2025.pdf · uploaded 18 Mar 2026View
  • Withdrawal Update Form 1ARCHITECTS CERTIFICATE DATE 20-4-2026.pdf · uploaded 12 May 2026View
  • Withdrawal Update Form 2Form 2 - Engineer Certificate.pdf · uploaded 12 May 2026View

Promoter documents

  • Legal Title reportTITLE REPORT.pdf · uploaded 8 Aug 2019View
  • Declaration Form BNOTARISED FORM B.pdf · uploaded 19 Aug 2019View
  • Declaration Form BNOTARISED FORM B1.pdf · uploaded 19 Aug 2019View

Technical documents

  • Layout Approvalscan295.pdfView
  • Building Plan Approvalscan296.pdfView
  • Building Plan ApprovalBuilding Plan 8.pdfView
  • Building Plan ApprovalBuilding Plan 7.pdfView
  • Building Plan ApprovalBuilding Plan 6.pdfView
  • Building Plan ApprovalBuilding Plan 5.pdfView
  • Building Plan ApprovalBuilding Plan 4.pdfView
  • Building Plan ApprovalBuilding Plan 3.pdfView
  • Building Plan ApprovalBuilding Plan 2.pdfView
  • Building Plan ApprovalBuilding Plan 1-compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER 3.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

232/4232/4 at Nashik

As published on MahaRERA's project page

232/4

Boundaries

North
Sno229and15mwidedproad
South
Sno233sno217
East
Sno303andsno331
West
Sno232hisaano1plus2plus3plus4

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAvinash Kothavade—
Chartered accountantAashish Abhonkar—
Chartered accountantGanesh Prabhakar Deore—
Chartered accountantPrashant Pathak & Associates—
EngineerJagtap chetan—
OtherRajesh Patel—

Source: MahaRERA project page. Contact details are not shown.