Skip to content
Deedo home
Menu

Prime Residency

Completed

Nashik (M Corp.), Nashik 422003 |Promoter: Rajesh Shankar Kashmire

Residential / Group HousingRERAP51600010552
31 Aug 2017Registered with MahaRERA
30 Sep 2019Promised completion
1Building
8Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
3BHK8 units in all
Land area for this project
524 sq m (5,638 sq ft)
Permissible built-up area
733 sq m (7,893 sq ft)
Sanctioned built-up area
524 sq m (5,638 sq ft)
Address
PLOT NO 5-6 SR NO 181A AND 180, The Rajlaxmi Urban Co-operative Bank, PANCHVATIPIN 422003
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.01167, 73.80320
Prime Residency is at latitude 20.01167, longitude 73.80320.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2019

The latest completion date on record passed 7 years and 1 month ago.

Registered
31 Aug 2017
Promised
30 Sep 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001055231 Aug 201730 Sep 2019—Rajesh Shankar KashmireProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Prime Residency68

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

8 units registered

3BHK · 8 units
TypeCarpet areaUnits
3BHK87.09 sq m · 937 sq ft8

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00008
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Prime Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCORPORATION CONNECTION100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER NMC NORMS100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTING100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING ONLY100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationMETER BOX ONLY100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 20 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Commencement certificate

Registration certificate

Form 5s

Others

Form 2a

Form 4

Layout plan

Allotment letter

Document library

  • Copy of the legal title reportKR Legal Title Report-ilovepdf-compressed.pdf · uploaded 5 Aug 2017View
  • Copy of Layout Approval (in case of layout)KR Building Plan.pdf · uploaded 5 Aug 2017View
  • Building Plan Approval (IOD)KR Building Plan.pdf · uploaded 5 Aug 2017View
  • Details of encumbrancesNO ENCUMBRANCE.pdf · uploaded 11 Aug 2017View
  • Declaration in FORM BFORM B AFFIDAVITE.pdf · uploaded 11 Aug 2017View
  • Proforma of Allotment letterAGREEMENT FOR SALE.pdf · uploaded 30 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentKR Commencement Certificate.pdf · uploaded 30 Aug 2017View
  • Certificates of CA (Form 5)RAJESH KASHMIRE.pdf · uploaded 29 Sep 2018View
  • Status of Formation of Legal Entity (Society/Co Op etc.)A 083.pdf · uploaded 10 May 2019View
  • Status of ConveyanceA 083.pdf · uploaded 10 May 2019View
  • Form 2AFORM 2A QUALITY ASSURANCE.pdf · uploaded 31 May 2019View
  • Certificates of Architect (Form 4)FORM 4 COMPLETION.pdf · uploaded 31 May 2019View
  • Certificates of CA (Form 5)FORM 5 STATUTORY AUDIT 1819.pdf · uploaded 13 Oct 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5 STATUTORY AUDIT 1819.pdf · uploaded 20 Feb 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 ANNUAL AUDIT KASHMIRE 1920.pdf · uploaded 20 Feb 2021View

Promoter documents

  • Legal Title reportKR Legal Title Report-ilovepdf-compressed.pdf · uploaded 5 Aug 2017View
  • Declaration Form BFORM B AFFIDAVITE.pdf · uploaded 11 Aug 2017View

Technical documents

  • Layout ApprovalKR Building Plan.pdfView
  • Building Plan ApprovalKR Building Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREEMENT FOR SALE.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

180PLOT NO 56 SR NO 181A

As published on MahaRERA's project page

PLOT NO 5-6 SR NO 181A AND 180

Boundaries

North
75 Mtr Road
South
Residential Bunglow
East
Shivparvati Bunglow Bearing Plot No 4-5
West
Residential Building Bearing Plot No 7-8

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRavi Amrutkar Associates—
EngineerDeltacom—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology