Pearl Residency

Completed

Nashik (M Corp.), Nashik 422101 |Promoter: Bardia And Associates

22 Aug 2017Registered with MahaRERA
31 Dec 2020Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
1,075 sq m (11,566 sq ft)
Permissible built-up area
1,801 sq m (19,381 sq ft)
Sanctioned built-up area
1,686 sq m (18,144 sq ft)
Address
Plot No 36/1a/2, Champa Lane, Jail RoadPIN 422101
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.76483, 73.61535
Pearl Residency is at latitude 18.76483, longitude 73.61535.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2020

The latest completion date on record passed 5 years and 10 months ago.

Registered
22 Aug 2017
Promised
31 Dec 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000961822 Aug 201731 Dec 2020—Bardia And AssociatesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Pearl Residency6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Pearl Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NO STP100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree Planting100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 19 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1

Form 2

Allotment letter (2)

Show all 35 documentsShow fewer documents

Form 4

Other (3)

Registration certificate

Layout plan

Building plan (2)

Document library

  • Copy of the legal title reportTitle Certificate.pdf · uploaded 29 Jul 2017View
  • Details of encumbrancesSelf Declaration.pdf · uploaded 29 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout Approval 1.pdf · uploaded 29 Jul 2017View
  • Proforma of Allotment letterAllottment Letter.pdf · uploaded 29 Jul 2017View
  • Proforma of Allotment lettermodel-form-of-agreement-to-be-entered-into-between-promoter-and-alottees-annexure-a.pdf · uploaded 29 Jul 2017View
  • Declaration in FORM BForm B Affidavit cum Declaration.pdf · uploaded 29 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer Certificate.pdf · uploaded 29 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)Building Plan Approval.pdf · uploaded 29 Jul 2017View
  • Certificates of Architect (Form 4)Form-4 Architect Certificate.pdf · uploaded 12 Jun 2018View
  • OtherCompletion Certificate.pdf · uploaded 12 Jun 2018View
  • Building Plan Approval (IOD)Final Approved Building Plan.pdf · uploaded 12 Jun 2018View

Promoter documents

  • Legal Title reportTitle Certificate.pdf · uploaded 29 Jul 2017View
  • Declaration Form BForm B Affidavit cum Declaration.pdf · uploaded 29 Jul 2017View

Technical documents

  • Building Plan ApprovalFinal Approved Building Plan.pdfView
  • Layout ApprovalLayout Approval 1.pdfView
  • Building Plan ApprovalBuilding Plan Approval.pdfView

Proforma allotment letter

  • Proforma allotment lettermodel-form-of-agreement-to-be-entered-into-between-promoter-and-alottees-annexure-a.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

36/1A/2PLOT NO 36/1A/2

As published on MahaRERA's project page

PLOT NO 36/1A/2

Boundaries

North
By 12 Mtr Road
South
By S No 36 1a 2 Part Layout
East
By S No 36 1a 2 Part Layout
West
By 12 Mtr Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Pratibha V Sonawane—
EngineerDeltacom Structural Consultants—

Source: MahaRERA project page. Contact details are not shown.