Navshya Heights

Completed

Nashik (M Corp.), Nashik 422008 |Promoter: Ashokbhai Batukbhai Adroja Huf

Residential / Group HousingRERAP51600023210
6 Dec 2019Registered with MahaRERA
30 Mar 2027Promised completion
2Buildings
49Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
2
Unit types
1BHK, 1RK, 2BHK49 units in all
Land area for this project
758 sq m (8,156 sq ft)
Permissible built-up area
1,384 sq m (14,898 sq ft)
Sanctioned built-up area
1,384 sq m (14,898 sq ft)
Address
S R No 774/775/2/1 Plot No 1 2, Karmyogi Nagar, UntawadiPIN 422008
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Navshya Heights is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2027

Registered
6 Dec 2019
Promised
30 Mar 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P516000232106 Dec 201930 Mar 2027—Ashokbhai Batukbhai Adroja HufProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P51600023210)——
Navshya Heights749

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

49 units registered

1BHK · 7 units1RK · 35 units2BHK · 7 units
TypeCarpet areaUnits
1BHK35.36 sq m · 381 sq ft7
1RK25.17 sq m · 271 sq ft7
1RK25.28 sq m · 272 sq ft7
1RK29.56 sq m · 318 sq ft14
1RK29.84 sq m · 321 sq ft7
2BHK49.07 sq m · 528 sq ft7

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000016
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Navshya Heights

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCOMPLETED100%
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

29 documents held by Deedo, 34 filings listed on MahaRERA's project page

Commencement certificate (2)

Form B

Form 1

Form 2

Allotment letter (2)

Title report

Show all 63 documentsShow fewer documents

Encumbrance details

Form 2A (9)

Registration certificate

Other (4)

Occupancy / completion certificate

  • Occupancy / completion certificate4 Nov 2021ViewSource

Form 4

Form 5

Layout plan

Building plan (2)

Document library

  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT HUF.pdf · uploaded 27 Nov 2019View
  • Declaration in FORM BFORM B.pdf · uploaded 27 Nov 2019View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE NAVSHYA.PDF · uploaded 27 Nov 2019View
  • Proforma of Allotment letterAGREEMENT DRAFT NAVSHYA HIGHTS APARTMENT-1-22.pdf · uploaded 27 Nov 2019View
  • Proforma of Allotment letterALLOTMENT LETTER NAVSHYA HIGHTS APARTMENT-23-27.pdf · uploaded 27 Nov 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)STRUCTURAL ENG NAVSHYA HIGHTS.pdf · uploaded 27 Nov 2019View
  • Copy of the legal title reportTITLE REPORT_compressed.pdf · uploaded 28 Nov 2019View
  • Copy of Layout Approval (in case of layout)LAYOUT PLAN.pdf · uploaded 28 Nov 2019View
  • Details of encumbrancesNO ENCUMBRANCE NAVSHYA.PDF · uploaded 28 Nov 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)NAVSHYA FORM 2A_compressed.pdf · uploaded 28 Nov 2019View
  • Building Plan Approval / NA Order for plotted developmentBUILDING PLAN HUF.pdf · uploaded 28 Nov 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)ASHOKBHAI BATUKBHAI ADROJA (HUF)_compressed.pdf · uploaded 20 Feb 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2 A MARCH 20_compressed.pdf · uploaded 8 Jul 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2 A JUNE 20_compressed.pdf · uploaded 8 Jul 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2 A SEP 20_compressed.pdf · uploaded 25 Jan 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2 A DEC 20_compressed.pdf · uploaded 25 Jan 2021View
  • OtherFORMAT C CORRECTION.PDF · uploaded 6 Jul 2021View
  • Building Plan Approval / NA Order for plotted developmentREVISED BUILDING PLAN_compressed.pdf · uploaded 6 Jul 2021View
  • Commencement Certificates / NA Order for plotted developmentREVISED COMMENCEMENT_compressed.pdf · uploaded 6 Jul 2021View
  • Disclosure of sold/ booked inventoryNAVSHYA INVENTORY JUNE 21.pdf · uploaded 3 Nov 2021View
  • Disclosure of sold/ booked inventoryNAVSHYA INVENTORY SEP 21.pdf · uploaded 3 Nov 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A MARCH 21_compressed.pdf · uploaded 3 Nov 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A JUNE 21_compressed.pdf · uploaded 3 Nov 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A SEP 21_compressed.pdf · uploaded 3 Nov 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentASHOK ADROJA HUF COMPLETION.pdf · uploaded 4 Nov 2021View
  • Architect’s Certificate on Completion of Project (Form 4)ASHOK HUF FORM 4.pdf · uploaded 4 Nov 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM-5 CA CERTIFICATE ABA- HUF.PDF · uploaded 21 Nov 2022View

Promoter documents

  • Declaration Form BFORM B.pdf · uploaded 27 Nov 2019View
  • Legal Title reportTITLE REPORT_compressed.pdf · uploaded 28 Nov 2019View

Technical documents

  • Layout ApprovalLAYOUT PLAN.pdfView
  • Building Plan ApprovalBUILDING PLAN HUF.pdfView
  • Building Plan ApprovalREVISED BUILDING PLAN_compressed.pdfView

Other legal documents

  • OtherFORMAT C CORRECTION.PDFView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER NAVSHYA HIGHTS APARTMENT-23-27.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

S R NO 774/775/2/1 PLOT NO 1 2

As published on MahaRERA's project page

S R NO 774/775/2/1 PLOT NO 1 2

Boundaries

North
Plot No 3
South
9 Mtr Wide Road
East
S R No 775 1b
West
9 Mtr Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHrishikesh K Pawar—
Chartered accountantDilip S Patel—
EngineerYogesh Thatte—
OtherSantosh Dhondiba Ingale—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology