Home Paradise

Completed

Nashik (M Corp.), Nashik 422004 |Promoter: Prashant Fakira Khairnar

Residential / Group HousingRERAP51600000771
23 Jul 2017Registered with MahaRERA
31 Jan 2023Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
611 sq m (6,581 sq ft)
Permissible built-up area
673 sq m (7,239 sq ft)
Sanctioned built-up area
608 sq m (6,544 sq ft)
Address
1 And 2, Near Agra Highway, Near Hotel JatraPIN 422004
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.62391, 73.81250
Home Paradise is at latitude 18.62391, longitude 73.81250.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Jan 2023

The latest completion date on record passed 3 years and 9 months ago.

Registered
23 Jul 2017
Promised
31 Jan 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000077123 Jul 201731 Jan 2023—Prashant Fakira KhairnarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Home Paradise6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Home Paradise

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises90%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyDrinking water supply from Muncipal Corporation100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Without STP100%
  • Storm Water DrainsProvided100%
  • Landscaping & Tree PlantingTree Planted100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingProvided100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationOnly Meter Room100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 20 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1

Form 2

Form 5 (2)

Show all 36 documentsShow fewer documents

Occupancy / completion certificate

  • Occupancy / completion certificate28 Dec 2019ViewSource

Form 4

Registration certificate

Other (2)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 20 Jul 2017View
  • Details of encumbrancesLoan Sanction Letter.pdf · uploaded 20 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 20 Jul 2017View
  • Declaration in FORM BFormB.pdf · uploaded 20 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 20 Jul 2017View
  • Proforma of Allotment letterDraft copy of Agreement and Allotment Letter - Home Paradise.pdf · uploaded 20 Jul 2017View
  • Building Plan Approval (IOD)Bldg Plan.pdf · uploaded 20 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 20 Jul 2017View
  • OtherSelf Declaration.pdf · uploaded 20 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 20 Jul 2017View
  • Certificates of CA (Form 5)Form 5 P K Homes.pdf · uploaded 15 Oct 2018View
  • Certificates of CA (Form 5)Annual Certificate 2019.pdf · uploaded 30 Sep 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate HPRD.pdf · uploaded 28 Dec 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 28 Dec 2019View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 20 Jul 2017View
  • Declaration Form BFormB.pdf · uploaded 20 Jul 2017View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalBldg Plan.pdfView

Other legal documents

  • OtherSelf Declaration.pdfView

Proforma allotment letter

  • Proforma allotment letterDraft copy of Agreement and Allotment Letter - Home Paradise.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

12

As published on MahaRERA's project page

1 AND 2

Boundaries

North
Plot No 3 4 5 6
South
Gat 541 Part
East
7 And Half Mtr Road
West
Gat No 552

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKshitij Dhande—
EngineerYogin Kulkarni—
OtherManoj Shivshankar Pandit—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology