Bajrang

Completed

Nashik (M Corp.), Nashik 422003 |Promoter: Narsibhai Mavjibhai Mavani

Residential / Group HousingRERAP51600011049
31 Aug 2017Registered with MahaRERA
28 Jan 2018Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
549 sq m (5,913 sq ft)
Permissible built-up area
769 sq m (8,278 sq ft)
Sanctioned built-up area
769 sq m (8,278 sq ft)
Address
S No 30/3 A 1/1/1/143 P No 01 at MakhmalabadPIN 422003
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.03446, 73.01101
Bajrang is at latitude 19.03446, longitude 73.01101.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 28 Jan 2018

The latest completion date on record passed 8 years and 9 months ago.

Registered
31 Aug 2017
Promised
28 Jan 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160001104931 Aug 201728 Jan 2018—Narsibhai Mavjibhai MavaniProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Bajrang5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000013
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Bajrang

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBORE WELL AND NMC100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELECTRICAL METER ROOM100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 22 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Form 1

Form 2

Registration certificate

Commencement certificate

Form 5 (2)

Show all 38 documentsShow fewer documents

Form 5 (2)

Form 4

Other (2)

Layout plan

Building plan

Allotment letter

Occupancy / completion certificate

  • Occupancy / completion certificateDate not statedViewSource

Document library

  • Details of encumbrancesNo Encum.pdf · uploaded 16 Aug 2017View
  • Copy of Layout Approval (in case of layout)Lay out.pdf · uploaded 16 Aug 2017View
  • Declaration in FORM BForm B.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)Building.pdf · uploaded 16 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterBajrang -Draft.pdf · uploaded 16 Aug 2017View
  • Copy of the legal title reportTitle.pdf · uploaded 16 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement.pdf · uploaded 15 Nov 2017View
  • Certificates of CA (Form 5)Form-5-2018.PDF · uploaded 29 Sep 2018View
  • OtherCompletion.pdf · uploaded 12 Jul 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion.pdf · uploaded 12 Dec 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 13 Dec 2019View
  • Certificates of CA (Form 5)Form 5-2019.pdf · uploaded 16 Dec 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5-2019.pdf · uploaded 16 Dec 2019View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Apartment Declaration.pdf · uploaded 20 Jul 2021View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 16 Aug 2017View
  • Legal Title reportTitle.pdf · uploaded 16 Aug 2017View

Technical documents

  • Layout ApprovalLay out.pdfView
  • Building Plan ApprovalBuilding.pdfView

Other legal documents

  • OtherCompletion.pdfView

Proforma allotment letter

  • Proforma allotment letterBajrang -Draft.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nashik (M Corp.), Nashik taluka

Survey, CTS, gat or plot numbers

S No 30/3 A 1/1/1/143 P No 01 at Makhmalabad

As published on MahaRERA's project page

S No 30/3 A 1/1/1/143 P No 01 at Makhmalabad

Boundaries

North
P No 88 96 and 120 and colony road
South
P No 1 143 2 and 1 143 3
East
P No 1 143 6 and 1 143 4
West
Colony road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Suresh N Patel—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology