Aaradhana Residency
Certificate SignedDeolaligaon, Nashik 422101 |Promoter: A C Jain Builders And Developers LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 2
- Phases
- 2
- Buildings
- 2
- Unit types
- 2BHK, 1BHK100 units in all
- Address
- S No - 39/6/40/6/7/2/3, Plot No 62-65, Shivam Colony, Artillery Center Road, Nasikroad, Opp Gopal NagarPIN 422101
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Also registered as
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Sep 2026
P51600025163The latest completion date on record passed 1 month ago.
- Registered
- 19 Mar 2020
- Promised
- 30 Sep 2026
Completion pushed back 8 months
P51600025195The latest completion date on record passed 3 years and 2 months ago.
- Registered
- 23 Mar 2020
- Promised
- 30 Dec 2022
- Revised
- 8 Aug 2023
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51600025163 | 19 Mar 2020 | 30 Sep 2026 | 30 Sep 2026 | A C Jain Builders And Developers LLP | Project page |
| P51600025195 | 23 Mar 2020 | 30 Dec 2022 | 8 Aug 2023 | A C Jain Builders And Developers LLP | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| AARADHANA RESIDENCY - A - A B and C WING | 9 | 84 |
| Aaradhana Residency - B | 4 | 16 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
64 of 100 units booked (64%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51600025195 | AARADHANA RESIDENCY - A - A B and C WING | 2BHK | 64.91 sq m · 699 sq ft | 84 | 48 |
| P51600025163 | Aaradhana Residency - B | 1BHK | 38.95 sq m · 419 sq ft | 16 | 16 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
3 documents held by Deedo, 318 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Show all 321 documentsShow fewer documents
Legal
- Declaration Form BP51600025195 · ACJ LLP AFFIDAVIT.pdf · uploaded 24 Feb 2020Source
- OtherP51600025195 · FORM C.pdf · uploaded 6 Sep 2021Source
- OtherP51600025195 · Binder1.pdf · uploaded 20 Sep 2021Source
- OtherP51600025195 · 67_CONSENT.pdf · uploaded 27 Sep 2021Source
- Declaration Form BP51600025195 · Form B.pdf · uploaded 19 Mar 2025Source
- Declaration Form BP51600025163 · Form B.pdf · uploaded 22 Mar 2025Source
Migrated
- 1 PAN CardP51600025163 · pan.pdf · uploaded 19 Feb 2020Source
- 1 Copy of the legal title reportP51600025163 · TITLE DEED.pdf · uploaded 19 Feb 2020Source
- 1 Copy of Layout Approval (in case of layout)P51600025163 · LAYOUT ORDER.pdf · uploaded 19 Feb 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP51600025163 · B-DRAWING.pdf · uploaded 19 Feb 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP51600025163 · B-COMMENCEMENT.pdf · uploaded 19 Feb 2020Source
- 1 PAN CardP51600025195 · pan.pdf · uploaded 19 Feb 2020Source
- 1 Copy of the legal title reportP51600025195 · TITLE DEED.pdf · uploaded 19 Feb 2020Source
- 1 Details of encumbrancesP51600025195 · 25-46.pdf · uploaded 19 Feb 2020Source
- 1 Building Plan Approval / NA Order for plotted developmentP51600025195 · A 1.pdf · uploaded 19 Feb 2020Source
- 2 Building Plan Approval / NA Order for plotted developmentP51600025195 · A 2.pdf · uploaded 19 Feb 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentP51600025195 · A-COMMENCEMENT.pdf · uploaded 19 Feb 2020Source
- 1 Declaration in FORM BP51600025163 · ACJ LLP AFFIDAVIT.pdf · uploaded 24 Feb 2020Source
- 1 Declaration in FORM BP51600025195 · ACJ LLP AFFIDAVIT.pdf · uploaded 24 Feb 2020Source
- 1 Proforma of Allotment letterP51600025163 · B.pdf · uploaded 2 Mar 2020Source
- 1 Proforma of Allotment letterP51600025195 · A2S - Rera_Jain_Chandratre.pdf · uploaded 2 Mar 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · Aaradhana B.pdf · uploaded 16 Mar 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · Aardhana A.pdf · uploaded 16 Mar 2020Source
- 1 Details of encumbrancesP51600025163 · 62-65.pdf · uploaded 18 Mar 2020Source
- 2 Proforma of Allotment letterP51600025163 · A2S - Rera_Jain_Chandratre - RESIDENCY - B.pdf · uploaded 18 Mar 2020Source
- 1 Copy of Layout Approval (in case of layout)P51600025195 · layout plan.pdf · uploaded 18 Mar 2020Source
- 2 Proforma of Allotment letterP51600025195 · A.pdf · uploaded 18 Mar 2020Source
- 2 Commencement Certificates / NA Order for plotted developmentP51600025195 · Plan 1.pdf · uploaded 24 Aug 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentP51600025195 · Plan 2.pdf · uploaded 24 Aug 2021Source
- 4 Commencement Certificates / NA Order for plotted developmentP51600025195 · Plan 3.pdf · uploaded 24 Aug 2021Source
- 5 Commencement Certificates / NA Order for plotted developmentP51600025195 · REV COMMENCEMENT1.pdf · uploaded 24 Aug 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentP51600025195 · PLAN 1.pdf · uploaded 6 Sep 2021Source
- 4 Building Plan Approval / NA Order for plotted developmentP51600025195 · PLAN 2.pdf · uploaded 6 Sep 2021Source
- 5 Building Plan Approval / NA Order for plotted developmentP51600025195 · PLAN 3.pdf · uploaded 6 Sep 2021Source
- 1 Declaration about Commencement CertificateP51600025195 · commencement_dec.pdf · uploaded 6 Sep 2021Source
- 1 Disclosure of sold/ booked inventoryP51600025195 · booking list.pdf · uploaded 6 Sep 2021Source
- 1 OtherP51600025195 · FORM C.pdf · uploaded 6 Sep 2021Source
- 2 OtherP51600025195 · Binder1.pdf · uploaded 20 Sep 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P51600025195 · Scan_144705.pdf · uploaded 27 Sep 2021Source
- 3 OtherP51600025195 · 67_CONSENT.pdf · uploaded 27 Sep 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · Scan_171528.pdf · uploaded 6 Oct 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51600025195 · Scan_144705.pdf · uploaded 6 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51600025195 · RERA FORM 5- Resi A 25195.pdf · uploaded 6 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · Scan_171202.pdf · uploaded 7 Oct 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51600025163 · Scan_144840.pdf · uploaded 7 Oct 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51600025163 · Rera Form 5 - Resi b 25163.pdf · uploaded 7 Oct 2021Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51600025195 · Form 4 Resi A - C Wing.pdf · uploaded 24 Jan 2022Source
- 2 Details of encumbrancesP51600025195 · Binder1-8.pdf · uploaded 22 Apr 2022Source
- 3 Details of encumbrancesP51600025195 · Binder 9-14.pdf · uploaded 22 Apr 2022Source
- 4 Details of encumbrancesP51600025195 · Binder15-20.pdf · uploaded 22 Apr 2022Source
- 5 Details of encumbrancesP51600025195 · Binder21-25.pdf · uploaded 22 Apr 2022Source
- 6 Details of encumbrancesP51600025195 · ENC - RA.pdf · uploaded 22 Apr 2022Source
- 7 Details of encumbrancesP51600025195 · ENC - RA.pdf · uploaded 28 Apr 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · resi b.pdf · uploaded 5 Nov 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · resi b.pdf · uploaded 18 Nov 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · resi a.pdf · uploaded 18 Nov 2022Source
- 2 a Details of encumbrances concerned to FinanceP51600025163 · 62-65.pdf · uploaded 8 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalP51600025163 · 62-65.pdf · uploaded 8 Feb 2023Source
- 1 Declaration about Commencement CertificateP51600025163 · Resi B.pdf · uploaded 8 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P51600025163 · Sep 21.pdf · uploaded 8 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P51600025163 · Dec 21.pdf · uploaded 8 Feb 2023Source
- 1 Disclosure of sold/ booked inventoryP51600025163 · SOLD DEC22.pdf · uploaded 8 Feb 2023Source
- 1 Proforma of Agreement for saleP51600025163 · GetUserDocumentFileContent.pdf · uploaded 8 Feb 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51600025163 · h5418.pdf · uploaded 8 Feb 2023Source
- 8 a Details of encumbrances concerned to FinanceP51600025195 · ENC - RA.pdf · uploaded 8 Feb 2023Source
- 1 b Details of encumbrances concerned to LegalP51600025195 · ENC - RA.pdf · uploaded 8 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51600025195 · Dec21.pdf · uploaded 8 Feb 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51600025195 · Mar22.pdf · uploaded 8 Feb 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P51600025195 · Jun22.pdf · uploaded 8 Feb 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P51600025195 · Sep22.pdf · uploaded 8 Feb 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P51600025195 · Dec22.pdf · uploaded 8 Feb 2023Source
- 1 CERSAI detailsP51600025195 · CERSAI_Search_Report_200259831358_For_Asset_Based_Search_08_02_2023_13_38_47_049.pdf · uploaded 8 Feb 2023Source
- 2 Disclosure of sold/ booked inventoryP51600025195 · Sep 21.pdf · uploaded 8 Feb 2023Source
- 3 Disclosure of sold/ booked inventoryP51600025195 · Dec 21.pdf · uploaded 8 Feb 2023Source
- 4 Disclosure of sold/ booked inventoryP51600025195 · Mar 22.pdf · uploaded 8 Feb 2023Source
- 5 Disclosure of sold/ booked inventoryP51600025195 · Jun 22.pdf · uploaded 8 Feb 2023Source
- 6 Disclosure of sold/ booked inventoryP51600025195 · Sep 22.pdf · uploaded 8 Feb 2023Source
- 7 Disclosure of sold/ booked inventoryP51600025195 · Dec 22.pdf · uploaded 8 Feb 2023Source
- 1 Proforma of Agreement for saleP51600025195 · 1 Proforma of Allotment letter.pdf · uploaded 8 Feb 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51600025195 · Accountstmt_50200051216203_03112022120611.PDF · uploaded 8 Feb 2023Source
- 2 Disclosure of sold/ booked inventoryP51600025163 · Sold Unsold INVENTORY - MAR 23.pdf · uploaded 14 Apr 2023Source
- 8 Disclosure of sold/ booked inventoryP51600025195 · Mar 23.pdf · uploaded 14 Apr 2023Source
- 1 Other – TechnicalP51600025163 · Quality Assurance Certificate Form 2A- Aaradhana Residency - B.pdf · uploaded 6 May 2023Source
- 1 Other – TechnicalP51600025195 · Quality Assurance Certificate Form 2A- Aaradhana Residency - A.pdf · uploaded 6 May 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 1 Engineer Certificate_Aradhana B _ March 20.pdf · uploaded 24 May 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 2 Engineer Certificate_Aradhana B _ March 21.pdf · uploaded 24 May 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 3 Engineer Certificate_Aradhana B _ June 21.pdf · uploaded 24 May 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 4 Engineer Certificate_Aradhana B _ sept 21.pdf · uploaded 24 May 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 5 Engineer Certificate_Aradhana B_dec21.pdf · uploaded 24 May 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 6 Engineer Certificate_Aradhana B_March22.pdf · uploaded 24 May 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 1 Engineer Certificate_Aradhana A _ March 20.pdf · uploaded 24 May 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 2 Engineer Certificate_Aradhana A _ March 21.pdf · uploaded 24 May 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 3 Engineer Certificate_Aradhana A _ June 21.pdf · uploaded 24 May 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 4 Engineer Certificate_Aradhana A _ Sept 21 .pdf · uploaded 24 May 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 5 Engineer Certificate_Aradhana A_dec21.pdf · uploaded 24 May 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 6 Engineer Certificate_Aradhana A_March 22.pdf · uploaded 24 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P51600025163 · RA_Aradhana B_19-20_Signed.pdf · uploaded 25 May 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51600025163 · RA_Aradhana B_20-21_Signed.pdf · uploaded 25 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51600025163 · RA_Aradhana B_21 22_Signed.pdf · uploaded 25 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P51600025195 · RA_Aaradhana A_signed_19 20.pdf · uploaded 25 May 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51600025195 · RA_Aaradhana A_signed_20 21.pdf · uploaded 25 May 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51600025195 · RA_Aaradhana A_signed_21 22.pdf · uploaded 25 May 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · Architect Certificate_MAR 20.pdf · uploaded 29 May 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · Architect Certificate_MAR 21.pdf · uploaded 29 May 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · Architect Certificate_JUN 21.pdf · uploaded 29 May 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · Architect Certificate_ SEP 21.pdf · uploaded 29 May 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · Architect Certificate_Dec 21.pdf · uploaded 29 May 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · Architect Certificate_MAR 22.pdf · uploaded 29 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 1 CA Cert_Aradhana B_March 20.pdf · uploaded 29 May 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 2 CA Cert_Aradhana B_March 21.pdf · uploaded 29 May 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 3 CA Cert_Aradhana B_June 21.pdf · uploaded 29 May 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 4 CA Cert_Aradhana B_Sept 21.pdf · uploaded 29 May 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 5 CA Cert_Aradhana B_Dec 21.pdf · uploaded 29 May 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 6 CA Cert_Aradhana B_March 22.pdf · uploaded 29 May 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · Architect Certificate_MAR 20.pdf · uploaded 29 May 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 1 Architect Certificate_MAR 20.pdf · uploaded 29 May 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 2 Architect Certificate_MAR21.pdf · uploaded 29 May 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 3 Architect Certificate_ Jun 21.pdf · uploaded 29 May 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 4 Architect Certificate_Sept 21.pdf · uploaded 29 May 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 5 Architect Certificate_Dec 21.pdf · uploaded 29 May 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 6 Architect Certificate_Mar22.pdf · uploaded 29 May 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 1 CA Certificate_march 20_Aradhana A.pdf · uploaded 29 May 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 2 CA Certificate_march 21_Aradhana A.pdf · uploaded 29 May 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 3 CA Certificate_June 21_Aradhana A.pdf · uploaded 29 May 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 4 CA Certificate_Sept 21_Aradhana A.pdf · uploaded 29 May 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 5 CA Certificate_Dec 21_Aaradhana A.pdf · uploaded 29 May 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 6 CA Certificate_March 22_Aaradhana A.pdf · uploaded 29 May 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 5 Architect Certificate_Aradhana A_June 22.pdf · uploaded 8 Sep 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 6 Architect Certificate_Aradhana A_Sept 22.pdf · uploaded 8 Sep 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 7 Architect Certificate_Aradhana A_Dec 22.pdf · uploaded 8 Sep 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 8 Architect Certificate_Aradhana A_Mar 23.pdf · uploaded 8 Sep 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 1 Engineer Certificate_Aradhana A_June 22.pdf · uploaded 8 Sep 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 2 Engineer Certificate_Aradhana A_Sept 22.pdf · uploaded 8 Sep 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 3 Engineer Certificate_Aradhana A_Dec 22.pdf · uploaded 8 Sep 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 4 Engineer Certificate_Aradhana A_March 23.pdf · uploaded 8 Sep 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 1 CA Certificate_June 22_Aaradhana A.pdf · uploaded 8 Sep 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 2 CA Certificate_Sept 22_Aaradhana A.pdf · uploaded 8 Sep 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 3 CA Certificate_Dec 22_Aaradhana A.pdf · uploaded 8 Sep 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · 4 CA Certificate_March 23_Aaradhana A.pdf · uploaded 8 Sep 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 1 CA Certificate June'22.pdf · uploaded 15 Sep 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 2 CA Certificate Sept'22.pdf · uploaded 15 Sep 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 3 CA Certificate Dec'22.pdf · uploaded 15 Sep 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 4 CA Certificate Mar'23.pdf · uploaded 15 Sep 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 5 CA Certificate June'23.pdf · uploaded 15 Sep 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025163 · 6 CA Certificate Aug'23.pdf · uploaded 15 Sep 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · 1 Architect Certificate_June 22.pdf · uploaded 16 Sep 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · 2 Architect Certificate_Sep 22.pdf · uploaded 16 Sep 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · 3 Architect Certificate_Dec 22.pdf · uploaded 16 Sep 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · 4 Architect Certificate_March 23.pdf · uploaded 16 Sep 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · 5 Architect Certificate_June 23.pdf · uploaded 16 Sep 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025163 · 6 Architect Certificate_Aug 23.pdf · uploaded 16 Sep 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 7 Engineer Certificate_Aradhana B_June 22.pdf · uploaded 16 Sep 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 8 Engineer Certificate_Aradhana B_Sept 22.pdf · uploaded 16 Sep 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 9 Engineer Certificate_Aradhana B_Dec 22.pdf · uploaded 16 Sep 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 10 Engineer Certificate_Aradhana B_March 23.pdf · uploaded 16 Sep 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 11 Engineer Certificate_Aradhana B_June 23 - Copy.pdf · uploaded 16 Sep 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025163 · 12 Engineer Certificate_Aradhana B_August 23.pdf · uploaded 16 Sep 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51600025163 · 9216 - 2023 - Apt Decleration Aradhana Residency B.pdf · uploaded 16 Sep 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 11 Architect Certificate_Aradhana A_June 23.pdf · uploaded 16 Sep 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600025195 · 12 Architect Certificate_Aradhana A_Aug 23.pdf · uploaded 16 Sep 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 9 Engineer Certificate_Aradhana A_June 23.pdf · uploaded 16 Sep 2023Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600025195 · 10 Engineer Certificate_Aradhana A_August 23.pdf · uploaded 16 Sep 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · Aaradhana A - CA Certificate June 23.pdf · uploaded 16 Sep 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600025195 · Aaradhana A -CA Certificate August 23.pdf · uploaded 16 Sep 2023Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51600025195 · COMPLETION CERTIFICATE.pdf · uploaded 16 Sep 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51600025195 · 9217 - Apt Decleration Aradhana Residency A.pdf · uploaded 16 Sep 2023Source
- 3 Disclosure of sold/ booked inventoryP51600025163 · Disclosure of Sold Booked Inventory - Aaradhana Residency - B.pdf · uploaded 21 Sep 2023Source
- 9 Disclosure of sold/ booked inventoryP51600025195 · Disclosure of Sold Booked Inventory - Aaradhana Residency - A.pdf · uploaded 21 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51600025163 · Aaradhana Residency B.pdf · uploaded 27 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51600025195 · Aaradhana Residency A.pdf · uploaded 27 Feb 2024Source
- 4 Disclosure of sold/ booked inventoryP51600025163 · Disclosure of Sold Booked Inventory - Aaradhana Residency - B.pdf · uploaded 21 Jun 2024Source
- 10 Disclosure of sold/ booked inventoryP51600025195 · Disclosure of Sold Booked Inventory - Aaradhana Residency - A.pdf · uploaded 21 Jun 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P51600025195 · Form 4-A.pdf · uploaded 1 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51600025163 · Quality Assurance Certificate Form 2A-23-24-Aaradhana Residency B.pdf · uploaded 14 Mar 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51600025163 · Quality Assurance Certificate Form 2A-23-24-Aaradhana Residency B.pdf · uploaded 14 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51600025163 · Aaradhna B Form 2A.pdf · uploaded 18 Mar 2025Source
- 1 Declaration in FORM BP51600025195 · Form B.pdf · uploaded 19 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51600025195 · Form 2A F Y 22-23.pdf · uploaded 19 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51600025195 · Quality Assurance Certificate-F Y 23-24.pdf · uploaded 19 Mar 2025Source
- 1 Declaration about Commencement CertificateP51600025195 · Declaration for Commencment Certificate (1).pdf · uploaded 21 Mar 2025Source
- 1 Declaration in FORM BP51600025163 · Form B.pdf · uploaded 22 Mar 2025Source
- Form 1P51600025195 · Form 1 - Aug 23.pdf · uploaded 8 May 2026Source
- Form 2P51600025195 · Form 2 - Aug 23.pdf · uploaded 8 May 2026Source
- Form 3P51600025195 · Form 3 - Aug 23.pdf · uploaded 8 May 2026Source
- Disclosure of Sold and Booked InventoryP51600025195 · Disclosure of sold inventory - Aug 23.pdf · uploaded 8 May 2026Source
- Form 1P51600025195 · Form 1 - March 23.pdf · uploaded 8 May 2026Source
- Form 2P51600025195 · Form 2 - March 23.pdf · uploaded 8 May 2026Source
- Form 3P51600025195 · Form 3 - March 23.pdf · uploaded 8 May 2026Source
- Disclosure of Sold and Booked InventoryP51600025195 · Disclosure of sold booked inventory - March 23.pdf · uploaded 8 May 2026Source
- Form 1P51600025163 · Form 1 March 20.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · Form 2 March 20.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · Form 3 March 20.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure Mar 20- Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · Architect Certificate_MAR 21.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · ER Certificate_MAR 21.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 2 CA Cert_Aradhana B_March 21.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure March-21 -Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · Architect Certificate_JUN 21.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · ER Certificate_JUN 21.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 3 CA Cert_Aradhana B_June 21.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure - June 21 - Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · Architect Certificate_ SEP 21.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · ER Certificate_ SEP 21.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 4 CA Cert_Aradhana B_Sept 21.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure Sept-21 - aardhna residency B.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · Architect Certificate_Dec 21.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · ER Certificate_Dec 21.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 5 CA Cert_Aradhana B_Dec 21.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure Dec 21- Aardhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · Architect Certificate_MAR 22.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · ER Certificate_MAR 22.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 6 CA Cert_Aradhana B_March 22.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure March 22- Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · 2 Architect Certificate_Aradhana B_Sept 22.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · 1 ER Certificate Sept 22.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 2 CA Certificate Sept 22.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure Sept 22- Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · 3 Architect Certificate_Aradhana B_Dec 22.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · 1 ER Certificate Dec 22.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 3 CA Certificate Dec 22.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure Dec 22 - Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · 4 Architect Certificate_Aradhana B_March 23.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · 1 ER Certificate March 23.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 4 CA Certificate Mar 23.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure March 23- Final.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · 5 Architect Certificate_Aradhana B_June 23.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · 1 ER Certificate June 23.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 5 CA Certificate June 23.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure June 23 - Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · Architect Certificate_MAR 21.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · ER Certificate_MAR 21.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 2 CA Cert_Aradhana B_March 21.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure March-21 -Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · Architect Certificate_MAR 21.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · ER Certificate_MAR 21.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 2 CA Cert_Aradhana B_March 21.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure March-21 -Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · Architect Certificate_MAR 21.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · ER Certificate_MAR 21.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 2 CA Cert_Aradhana B_March 21.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure March-21 -Aaradhna residency B docx.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · AR-Sep 23.pdf · uploaded 13 Jun 2026Source
- Form 2P51600025163 · 1 ER Certificate Aug 23.pdf · uploaded 13 Jun 2026Source
- Form 3P51600025163 · 6 CA Certificate Aug 23.pdf · uploaded 13 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure pdf-1.pdf · uploaded 13 Jun 2026Source
- Form 2A (FY 2019-2020)P51600025163 · Form 2A March 20- aaradhna residency b.pdf · uploaded 13 Jun 2026Source
- Form 2A (FY 2020-2021)P51600025163 · Form 2A March 21 aaradhna residency b.pdf · uploaded 13 Jun 2026Source
- Form 2A (FY 2021-2022)P51600025163 · Form 2A March 22 aaradhna residency b.pdf · uploaded 13 Jun 2026Source
- Form 2A (FY 2022-2023)P51600025163 · Form 2A March 23 aaradhna residency b.pdf · uploaded 13 Jun 2026Source
- Form 2A (FY 2023-2024)P51600025163 · Form 2A March 24 - aaradhna residency B.pdf · uploaded 13 Jun 2026Source
- Form 1P51600025163 · 1 Architect Certificate_Aradhana B_June 22.pdf · uploaded 18 Jun 2026Source
- Form 2P51600025163 · 1 ER Certificate June 22.pdf · uploaded 18 Jun 2026Source
- Form 3P51600025163 · 1 CA Certificate June 22.pdf · uploaded 18 Jun 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Disclosure June 22 docx.pdf · uploaded 18 Jun 2026Source
- Form 5 (FY 2019-2020)P51600025163 · RA_Aradhana B_19-20_Signed.pdf · uploaded 18 Jun 2026Source
- Form 5 (FY 2020-2021)P51600025163 · RA_Aradhana B_20-21_Signed.pdf · uploaded 18 Jun 2026Source
- Form 5 (FY 2021-2022)P51600025163 · RA_Aradhana B_21 22_Signed.pdf · uploaded 18 Jun 2026Source
- Form 5 (FY 2022-2023)P51600025163 · Rera Audit-Aaradhana Residency B.pdf · uploaded 23 Jun 2026Source
- Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Dis-Final.pdf · uploaded 14 Jul 2026Source
- Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Dis-Final.pdf · uploaded 14 Jul 2026Source
- Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Dis-Final.pdf · uploaded 14 Jul 2026Source
- Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Dis-Final.pdf · uploaded 14 Jul 2026Source
- Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Dis-Final.pdf · uploaded 14 Jul 2026Source
- Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Disclosure of Sold and Booked InventoryP51600025163 · Dis-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 1P51600025163 · AR-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 2P51600025163 · ER-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Withdrawal Update Form 3P51600025163 · CA-Final.pdf · uploaded 14 Jul 2026Source
- Form 2A (FY 2024-2025)P51600025163 · Form 2A - March 24.pdf · uploaded 14 Jul 2026Source
- Form 2A (FY 2025-2026)P51600025163 · Form 2A - March 24.pdf · uploaded 14 Jul 2026Source
Technical
- DocumentP51600025163 · LAYOUT ORDER.pdf · uploaded 19 Feb 2020Source
- DocumentP51600025163 · B-DRAWING.pdf · uploaded 19 Feb 2020Source
- DocumentP51600025195 · A 1.pdf · uploaded 19 Feb 2020Source
- DocumentP51600025195 · A 2.pdf · uploaded 19 Feb 2020Source
- DocumentP51600025195 · layout plan.pdf · uploaded 18 Mar 2020Source
- DocumentP51600025195 · PLAN 1.pdf · uploaded 6 Sep 2021Source
- DocumentP51600025195 · PLAN 2.pdf · uploaded 6 Sep 2021Source
- DocumentP51600025195 · PLAN 3.pdf · uploaded 6 Sep 2021Source
- Other – TechnicalP51600025163 · Quality Assurance Certificate Form 2A- Aaradhana Residency - B.pdf · uploaded 6 May 2023Source
- Other – TechnicalP51600025195 · Quality Assurance Certificate Form 2A- Aaradhana Residency - A.pdf · uploaded 6 May 2023Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Deolaligaon, Nashik taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 9 Mtr Colony Road
- South
- Land Surrendered To Government
- East
- Open Space Of Layout
- West
- 9 Mtr Colony Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Niki Associates | — | P51600025163 |
| Architect | Niki Associates | — | P51600025195 |
| Chartered accountant | Kpn And Co | — | P51600025163 |
| Chartered accountant | Kpn And Co | — | P51600025195 |
| Chartered accountant | Pratik D Jain | — | P51600025163 |
| Engineer | Jitendra S Bhamare | — | P51600025163 |
| Engineer | Milind Rathi | — | P51600025163 |
| Engineer | Sanjay Shriram Patil | — | P51600025163 |
Show all 22 professionalsShow fewer professionals
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Engineer | Sanjay Shriram Patil | — | P51600025195 |
| Other | Altaf Mumtaj Khan | — | P51600025195 |
| Other | Altaf Mumtaj Khan | — | P51600025163 |
| Other | Ayush Enterprises | — | P51600025163 |
| Other | Ayush Enterprises | — | P51600025195 |
| Other | Kashinath Dhage | — | P51600025163 |
| Other | Kashinath Dhage | — | P51600025195 |
| Other | Mrp Electricals | — | P51600025163 |
| Other | Mrp Electricals | — | P51600025195 |
| Other | Raghuram Triveni Chauhan | — | P51600025163 |
| Other | Raghuram Triveni Chauhan | — | P51600025195 |
| Other | Sai Associates | — | P51600025195 |
| Registered real estate agent | Nitin Madhusudan Deolalkar | — | P51600025195 |
| Registered real estate agent | Nitin Madhusudan Deolalkar | — | P51600025163 |
Source: MahaRERA project page. Contact details are not shown.