Skip to content
Deedo home
Menu

Tirupati Garden Phase III

Completed

Bhagur (M Cl), Nashik 422401 |Promoter: Riddhi Siddhi Constructions

Residential / Group HousingRERAP51600008472
19 Aug 2017Registered with MahaRERA
31 Dec 2018Promised completion
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
2
Land area for this project
1,500 sq m (16,146 sq ft)
Permissible built-up area
749 sq m (8,066 sq ft)
Sanctioned built-up area
749 sq m (8,066 sq ft)
Address
Survey no 39/3A/4PIN 422401
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.88428, 73.83436
Tirupati Garden Phase III is at latitude 19.88428, longitude 73.83436.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2018

The latest completion date on record passed 7 years and 10 months ago.

Registered
19 Aug 2017
Promised
31 Dec 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160000847219 Aug 201731 Dec 2018—Riddhi Siddhi ConstructionsProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A- wing4—
B-Wing4—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A- wingClosed/Covered00001
A- wingOpen Space00000
B-WingClosed/Covered00001
B-WingOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A- wing

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B-Wing

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsTo be completed at the final stage0%
  • Water Supplyto be joined to cantonment board line0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)to be joined to cantonment board line0%
  • Storm Water Drainsto be joined to cantonment line0%
  • Landscaping & Tree PlantingTo be completed at the final stage0%
  • Street LightingTo be completed at the final stage0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterTo be completed at the final stage50%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingto be joined to bore well pit0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationTo be completed at the final stage50%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

19 documents held by Deedo, 23 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Declaration in FORM BAffidavit Tirupati garden.pdf · uploaded 4 Aug 2017View
  • Details of encumbrancesCCF04082017_0006.pdf · uploaded 4 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)CCF04082017_0007.pdf · uploaded 4 Aug 2017View
  • Copy of the legal title reportTitle Certificate.pdf · uploaded 4 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement letter.pdf · uploaded 4 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)CCF04082017_0008.pdf · uploaded 4 Aug 2017View
  • Building Plan Approval (IOD)plan 2.pdf · uploaded 4 Aug 2017View
  • Building Plan Approval (IOD)plan 3.pdf · uploaded 4 Aug 2017View
  • Proforma of Allotment letterDraft Agrement.pdf · uploaded 4 Aug 2017View
  • Copy of Layout Approval (in case of layout)layout.pdf · uploaded 4 Aug 2017View
  • Building Plan Approval (IOD)PLAN 1.pdf · uploaded 4 Aug 2017View
  • OtherCompletion certificate.pdf · uploaded 27 Jun 2018View
  • OtherCompletion certificate 1.pdf · uploaded 27 Jun 2018View
  • Architect’s Certificate on Completion of Project (Form 4)Tirupati-1.pdf · uploaded 7 Dec 2019View

Promoter documents

  • Declaration Form BAffidavit Tirupati garden.pdf · uploaded 4 Aug 2017View
  • Legal Title reportTitle Certificate.pdf · uploaded 4 Aug 2017View

Technical documents

  • Building Plan Approvalplan 2.pdfView
  • Building Plan Approvalplan 3.pdfView
  • Layout Approvallayout.pdfView
  • Building Plan ApprovalPLAN 1.pdfView

Other legal documents

  • OtherCompletion certificate.pdfView
  • OtherCompletion certificate 1.pdfView

Proforma allotment letter

  • Proforma allotment letterDraft Agrement.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhagur (M Cl), Nashik taluka

Survey, CTS, gat or plot numbers

39/3A/4Survey no 39/3A/4

As published on MahaRERA's project page

Survey no 39/3A/4

Boundaries

North
Part of Survey no 39 oblige 2 and survey no 39 obl
South
Part of Survey no 39 oblige 3A oblige 4
East
Part of Survey no 39 oblige 3A oblige 5
West
Part of survey no 39 oblige3A oblige 3

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSheetal Chougule—
EngineerSunil Patel—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology