K R Suncity

Completed

Khamgaon, Nandurbar 425412 |Promoter: Kreations Enterprises Private Limited

Residential / Group HousingRERAP49700013238
21 Sep 2017Registered with MahaRERA
31 Jul 2018Promised completion
31 Jul 2019Revised completionPushed back 1 year
24Buildings
23Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
24
Unit types
1 BHK, 1BHK, 2 BHK, Plot23 units in all
Land area for this project
1,932 sq m (20,796 sq ft)
Permissible built-up area
855 sq m (9,199 sq ft)
Sanctioned built-up area
855 sq m (9,199 sq ft)
Address
S NO 80 P NO 56 TO 60 63 TO 68 73 TO 79 81 TO 83 85 167, Surat By Pass Road, KhamgaonPIN 425412
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.34980, 74.20904
K R Suncity is at latitude 21.34980, longitude 74.20904.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 7 years and 3 months ago.

Registered
21 Sep 2017
Promised
31 Jul 2018
Revised
31 Jul 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4970001323821 Sep 201731 Jul 201831 Jul 2019Kreations Enterprises Private LimitedProject page

24 buildings

Buildings and wings named in the registration

Show all 24 buildingsShow fewer buildings

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

23 units registered

1 BHK · 15 units1BHK · 7 units2 BHK · 1 unitPlot · 0 units
BuildingTypeCarpet areaUnits
K R Suncity-2 Phase 1 Row House No 1671 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase-1 Row House No 561 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 571BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 581BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 591BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 601BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 631BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 641BHK36.74 sq m · 395 sq ft1
Show all 24 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnits
K R Suncity-2 Phase 1 Row House No 651BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 661 BHK36.74 sq m · 395 sq ft1
K R Suncity -2 Phase 1 Row House No 671 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 681 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 731 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 741 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 751 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 761 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 771 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 781 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 792 BHK46.31 sq m · 498 sq ft1
K R Suncity-2 Phase 1 Row House No 811 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 821 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 831 BHK36.74 sq m · 395 sq ft1
K R Suncity-2 Phase 1 Row House No 851 BHK36.74 sq m · 395 sq ft1
PlotPlot0 sq m · 0 sq ft0

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
K R Suncity-2 Phase 1 Row House No 167Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 167Open Space00000
K R Suncity-2 Phase-1 Row House No 56Closed/Covered00000
K R Suncity-2 Phase-1 Row House No 56Open Space00000
K R Suncity-2 Phase 1 Row House No 57Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 57Open Space00000
K R Suncity-2 Phase 1 Row House No 58Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 58Open Space00000
Show all 48 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
K R Suncity-2 Phase 1 Row House No 59Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 59Open Space00000
K R Suncity-2 Phase 1 Row House No 60Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 60Open Space00000
K R Suncity-2 Phase 1 Row House No 63Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 63Open Space00000
K R Suncity-2 Phase 1 Row House No 64Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 64Open Space00000
K R Suncity-2 Phase 1 Row House No 65Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 65Open Space00000
K R Suncity-2 Phase 1 Row House No 66Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 66Open Space00000
K R Suncity -2 Phase 1 Row House No 67Closed/Covered00000
K R Suncity -2 Phase 1 Row House No 67Open Space00000
K R Suncity-2 Phase 1 Row House No 68Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 68Open Space00000
K R Suncity-2 Phase 1 Row House No 73Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 73Open Space00000
K R Suncity-2 Phase 1 Row House No 74Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 74Open Space00000
K R Suncity-2 Phase 1 Row House No 75Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 75Open Space00000
K R Suncity-2 Phase 1 Row House No 76Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 76Open Space00000
K R Suncity-2 Phase 1 Row House No 77Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 77Open Space00000
K R Suncity-2 Phase 1 Row House No 78Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 78Open Space00000
K R Suncity-2 Phase 1 Row House No 79Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 79Open Space00000
K R Suncity-2 Phase 1 Row House No 81Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 81Open Space00000
K R Suncity-2 Phase 1 Row House No 82Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 82Open Space00000
K R Suncity-2 Phase 1 Row House No 83Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 83Open Space00000
K R Suncity-2 Phase 1 Row House No 85Closed/Covered00000
K R Suncity-2 Phase 1 Row House No 85Open Space00000
PlotClosed/Covered00000
PlotOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

K R Suncity-2 Phase 1 Row House No 167

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase-1 Row House No 56

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 57

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Show all 25 buildings and common areasShow fewer buildings and common areas

K R Suncity-2 Phase 1 Row House No 58

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

K R Suncity-2 Phase 1 Row House No 59

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

K R Suncity-2 Phase 1 Row House No 60

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 63

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 64

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 65

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 66

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity -2 Phase 1 Row House No 67

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 68

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 73

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 74

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 75

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

K R Suncity-2 Phase 1 Row House No 76

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 77

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 78

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 79

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)50%
  • Plinth100%
  • Stilt Floor50%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 81

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 82

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

K R Suncity-2 Phase 1 Row House No 83

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

K R Suncity-2 Phase 1 Row House No 85

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Plot

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsWORK IN PROGRESS0%
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)NO STP100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingONLY TREE PLANTING100%
  • Street LightingWORK YET TO START100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationONLY ELECTRICAL METER BOXSEPARATELY.WORKYETTOSTART100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 28 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Registration certificate

Commencement certificate

Form 5 (3)

Show all 49 documentsShow fewer documents

Form 4

Occupancy / completion certificate

  • Occupancy / completion certificate28 May 2021ViewSource

Extension certificate

Layout plan

Building plan (6)

Allotment letter

Other (2)

Document library

  • Copy of the legal title reportTitle Certificate.pdf · uploaded 1 Sep 2017View
  • Declaration in FORM BAffidavit.pdf · uploaded 1 Sep 2017View
  • Copy of Layout Approval (in case of layout)LAYOUT 1.pdf · uploaded 1 Sep 2017View
  • Proforma of Allotment letterFINAL RERA SALE DEED AGREEMENT.pdf · uploaded 1 Sep 2017View
  • Details of encumbrancesEncumbrances Kreations.pdf · uploaded 1 Sep 2017View
  • Building Plan Approval (IOD)Building Plan 1-(1-4).pdf · uploaded 1 Sep 2017View
  • Building Plan Approval (IOD)Building Plan 2 (5-8).pdf · uploaded 1 Sep 2017View
  • Building Plan Approval (IOD)Building Plan 3 (9-12).pdf · uploaded 1 Sep 2017View
  • Building Plan Approval (IOD)Building Plan 4 (13-16).pdf · uploaded 1 Sep 2017View
  • Building Plan Approval (IOD)Building Plan 5-(17-21).pdf · uploaded 1 Sep 2017View
  • Building Plan Approval (IOD)Building Plan 6.pdf · uploaded 13 Sep 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 4 Nov 2017View
  • Certificates of CA (Form 5)AUDIT REPORT PDF.pdf · uploaded 15 Oct 2018View
  • Certificates of CA (Form 5)Audit report 2018-19.pdf · uploaded 19 May 2020View
  • Architect’s Certificate on Completion of Project (Form 4)Form-4.pdf · uploaded 20 Aug 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Rera Audit report_2019-20.pdf · uploaded 19 May 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)RERA Audit report 18-19 _Signed.pdf · uploaded 19 May 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 28 May 2021View

Promoter documents

  • Declaration Form BAffidavit.pdf · uploaded 1 Sep 2017View
  • Legal Title reportTitle Certificate.pdf · uploaded 1 Sep 2017View

Technical documents

  • Building Plan ApprovalBuilding Plan 6.pdfView
  • Layout ApprovalLAYOUT 1.pdfView
  • Building Plan ApprovalBuilding Plan 1-(1-4).pdfView
  • Building Plan ApprovalBuilding Plan 2 (5-8).pdfView
  • Building Plan ApprovalBuilding Plan 3 (9-12).pdfView
  • Building Plan ApprovalBuilding Plan 4 (13-16).pdfView
  • Building Plan ApprovalBuilding Plan 5-(17-21).pdfView

Proforma allotment letter

  • Proforma allotment letterFINAL RERA SALE DEED AGREEMENT.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Khamgaon, Nandurbar taluka

Survey, CTS, gat or plot numbers

S NO 80 P NO 56 TO 60 63 TO 68 73 TO 79 81 TO 83 85 167

As published on MahaRERA's project page

S NO 80 P NO 56 TO 60 63 TO 68 73 TO 79 81 TO 83 85 167

Boundaries

North
Plot No 55 And 86
South
Plot No 69 And 72
East
9 Meter Colony Road
West
9 Mtr Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDigvijay Devendra Narsay—
EngineerHitesh B Lahoti—

Source: MahaRERA project page. Contact details are not shown.

Data through8 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology