Ramanuj A

Active

Wadi Bk., Nanded 431602 |Promoter: Uttam Kishanrao Bacchewar

Residential / Group HousingRERAP51100055567
2 Apr 2024Registered with MahaRERA
31 Dec 2028Promised completion
33Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
33
Land area for this project
5,936 sq m (63,896 sq ft)
Permissible built-up area
5,978 sq m (64,351 sq ft)
Sanctioned built-up area
5,978 sq m (64,351 sq ft)
Address
Plot No 01 To 07, 227 To 230, 250 To 265, Survey No 38/A/1/1, Mouje Wadi (Bk) Nanded 431602, Mouje Wadi (Bk), Mouje Wadi (Bk)PIN 431602
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
2 Apr 2024
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P511000555672 Apr 202431 Dec 2028—Uttam Kishanrao BacchewarProject page

33 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Row House No 01 on Plot No 011—
Row House No 02 on Plot No 021—
Row House No 03 on Plot No 031—
Row House No 04 on Plot No 041—
Row House No 05 on Plot No 051—
Row House No 06 on Plot No 061—
Row House No 07 on Plot No 071—
Row House No 08 on Plot No 2531—
Row House No 09 on Plot No 2541—
Row House No 10 on Plot No 2551—
Row House No 11 on Plot No 2561—
Row House No 12 on Plot No 2571—
Row House No 13 on Plot No 2581—
Row House No 14 on Plot No 2611—
Row House No 15 on Plot no 2621—
Row House No 16 on Plot No 2631—
Row House No 17 on Plot No 2641—
Row House No 18 on Plot No 2651—
Row House No 19 on Plot No 2651—
Row House No 20 on Plot No 2601—
Row House No 21 on Plot No 2601—
Row House No 22 on Plot No 2591—
Row House No 23 on Plot No 2591—
Row House No 24 on Plot No 2501—
Row House No 25 on Plot No 2501—
Row House No 26 on Plot No 2511—
Row House No 27 on Plot No 2511—
Row House No 28 on Plot No 2521—
Row House No 29 on Plot No 2521—
Row House No 30 on Plot No 2271—
Row House No 31 on Plot No 2281—
Row House No 32 on Plot No 2291—
Row House No 33 on Plot No 2301—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Row House No 01 on Plot No 01Closed/Covered00000
Row House No 01 on Plot No 01Open Space00000
Row House No 02 on Plot No 02Closed/Covered00000
Row House No 02 on Plot No 02Open Space00000
Row House No 03 on Plot No 03Closed/Covered00000
Row House No 03 on Plot No 03Open Space00000
Row House No 04 on Plot No 04Closed/Covered00000
Row House No 04 on Plot No 04Open Space00000
Row House No 05 on Plot No 05Closed/Covered00000
Row House No 05 on Plot No 05Open Space00000
Row House No 06 on Plot No 06Closed/Covered00000
Row House No 06 on Plot No 06Open Space00000
Row House No 07 on Plot No 07Closed/Covered00000
Row House No 07 on Plot No 07Open Space00000
Row House No 08 on Plot No 253Closed/Covered00000
Row House No 08 on Plot No 253Closed/Covered00000
Row House No 08 on Plot No 253Open Space00000
Row House No 08 on Plot No 253Open Space00000
Row House No 09 on Plot No 254Closed/Covered00000
Row House No 09 on Plot No 254Closed/Covered00000
Row House No 09 on Plot No 254Open Space00000
Row House No 09 on Plot No 254Open Space00000
Row House No 10 on Plot No 255Closed/Covered00000
Row House No 10 on Plot No 255Closed/Covered00000
Row House No 10 on Plot No 255Open Space00000
Row House No 10 on Plot No 255Open Space00000
Row House No 11 on Plot no 256Closed/Covered00000
Row House No 11 on Plot no 256Open Space00000
Row House No 11 on Plot No 256Closed/Covered00000
Row House No 11 on Plot No 256Open Space00000
Row House No 12 on Plot No 257Closed/Covered00000
Row House No 12 on Plot No 257Closed/Covered00000
Row House No 12 on Plot No 257Open Space00000
Row House No 12 on Plot No 257Open Space00000
Row House No 13 on Plot No 258Closed/Covered00000
Row House No 13 on Plot No 258Closed/Covered00000
Row House No 13 on Plot No 258Open Space00000
Row House No 13 on Plot No 258Open Space00000
Row House No 14 on Plot No 261Closed/Covered00000
Row House No 14 on Plot No 261Closed/Covered00000
Row House No 14 on Plot No 261Open Space00000
Row House No 14 on Plot No 261Open Space00000
Row House No 15 on Plot no 262Closed/Covered00000
Row House No 15 on Plot no 262Closed/Covered00000
Row House No 15 on Plot no 262Open Space00000
Row House No 15 on Plot no 262Open Space00000
Row House No 16 on Plot No 263Closed/Covered00000
Row House No 16 on Plot No 263Closed/Covered00000
Row House No 16 on Plot No 263Open Space00000
Row House No 16 on Plot No 263Open Space00000
Row House No 17 on Plot No 264Closed/Covered00000
Row House No 17 on Plot No 264Closed/Covered00000
Row House No 17 on Plot No 264Open Space00000
Row House No 17 on Plot No 264Open Space00000
Row House No 18 on Plot No 265Closed/Covered00000
Row House No 18 on Plot No 265Open Space00000
Row House No 19 on Plot No 265Closed/Covered00000
Row House No 19 on Plot No 265Open Space00000
Row House No 20 on Plot No 260Closed/Covered00000
Row House No 20 on Plot No 260Open Space00000
Row House No 21 on Plot No 260Closed/Covered00000
Row House No 21 on Plot No 260Open Space00000
Row House No 22 on Plot No 259Closed/Covered00000
Row House No 22 on Plot No 259Open Space00000
Row House No 23 on Plot No 259Closed/Covered00000
Row House No 23 on Plot No 259Open Space00000
Row House No 24 on Plot No 250Closed/Covered00000
Row House No 24 on Plot No 250Open Space00000
Row House No 25 on Plot No 250Closed/Covered00000
Row House No 25 on Plot No 250Open Space00000
Row House No 26 on Plot No 251Closed/Covered00000
Row House No 26 on Plot No 251Open Space00000
Row House No 27 on Plot No 251Closed/Covered00000
Row House No 27 on Plot No 251Open Space00000
Row House No 28 on Plot No 252Closed/Covered00000
Row House No 28 on Plot No 252Open Space00000
Row House No 29 on Plot No 252Closed/Covered00000
Row House No 29 on Plot No 252Open Space00000
Row House No 30 on Plot No 227Closed/Covered00000
Row House No 30 on Plot No 227Open Space00000
Row House No 31 on Plot No 228Closed/Covered00000
Row House No 31 on Plot No 228Open Space00000
Row House No 32 on Plot No 229Closed/Covered00000
Row House No 32 on Plot No 229Open Space00000
Row House No 33 on Plot No 230Closed/Covered00000
Row House No 33 on Plot No 230Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Row House No 01 on Plot No 01

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 02 on Plot No 02

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 03 on Plot No 03

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 04 on Plot No 04

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 05 on Plot No 05

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Row House No 06 on Plot No 06

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 07 on Plot No 07

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 08 on Plot No 253

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 09 on Plot No 254

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 10 on Plot No 255

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 11 on Plot no 256

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 11 on Plot No 256

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 12 on Plot No 257

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 13 on Plot No 258

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 14 on Plot No 261

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 15 on Plot no 262

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 16 on Plot No 263

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 17 on Plot No 264

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 18 on Plot No 265

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 19 on Plot No 265

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 20 on Plot No 260

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 21 on Plot No 260

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 22 on Plot No 259

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 23 on Plot No 259

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 24 on Plot No 250

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 25 on Plot No 250

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 26 on Plot No 251

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 27 on Plot No 251

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 28 on Plot No 252

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 29 on Plot No 252

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 30 on Plot No 227

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 31 on Plot No 228

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 32 on Plot No 229

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Row House No 33 on Plot No 230

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving station0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

57 documents held by Deedo, 84 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • a Details of encumbrances concerned to FinanceNo Encumbrance Declaration Finance Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • a Details of encumbrances concerned to FinanceNo Encumbrance Declaration Legal Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • b Details of encumbrances concerned to LegalNo Encumbrance Declaration Finance Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • b Details of encumbrances concerned to LegalNo Encumbrance Declaration Legal Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • Copy of Layout Approval (in case of layout)1_compressed (2).pdf · uploaded 7 Feb 2024View
  • Building Plan Approval / NA Order for plotted development1_compressed (2).pdf · uploaded 7 Feb 2024View
  • Building Plan Approval / NA Order for plotted development2_compressed.pdf · uploaded 7 Feb 2024View
  • Building Plan Approval / NA Order for plotted development3_compressed (1).pdf · uploaded 7 Feb 2024View
  • Building Plan Approval / NA Order for plotted development4_compressed.pdf · uploaded 7 Feb 2024View
  • Building Plan Approval / NA Order for plotted development5_compressed.pdf · uploaded 7 Feb 2024View
  • Declaration about Commencement CertificateDeclaration About Commencement Certificate Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • Declaration in FORM BRamanuj A2 (2).pdf · uploaded 7 Feb 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsInterest in Other Real Estate Projects Ramanuj A.pdf · uploaded 7 Feb 2024View
  • Proforma of Agreement for saleAgreement to sale Flat Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • Proforma of Allotment letterAllotment Letter Flat Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Account Final Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • Deviation Report with respect to Allotment letterDeviation Allotment Flat Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • Deviation Report with respect to model copy of AgreementDeviation ATS Apartment Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • CERSAI detailsCERSAI_Search_Report_200296121939_For_Asset_Based_Search_07_02_2024_16_36_58_253.pdf · uploaded 7 Feb 2024View
  • CERSAI detailsCERSAI Declaration Ramanuj A2.pdf · uploaded 7 Feb 2024View
  • Other – LegalName Mismatch A2.pdf · uploaded 7 Feb 2024View
  • Other – TechnicalName Mismatch A2 Tech.pdf · uploaded 7 Feb 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate 1_0001 (1).pdf · uploaded 7 Feb 2024View
  • Other – TechnicalS28C-2240130125500 (1) (1)_organized_compressed.pdf · uploaded 8 Feb 2024View
  • Other – TechnicalDeclaration of Non Registration Layout Project Ramanuj A.pdf · uploaded 9 Feb 2024View
  • Copy of Layout Approval (in case of layout)38 LAYOUT PLAN.pdf · uploaded 15 Feb 2024View
  • Commencement Certificates / NA Order for plotted development38 permission-UB.pdf · uploaded 15 Feb 2024View
  • Copy of the legal title report1 Copy of the legal title report.pdf · uploaded 23 Feb 2024View
  • Commencement Certificates / NA Order for plotted developmentBacchewar mail verify.pdf · uploaded 26 Feb 2024View
  • Commencement Certificates / NA Order for plotted developmentRERA LETTER.pdf · uploaded 13 Mar 2024View
  • Other – Legalplot 1 to 7 sale deed_compressed.pdf · uploaded 20 Mar 2024View
  • Other – LegalRow House No Mismatch.pdf · uploaded 22 Mar 2024View
  • Other – TechnicalRow House No Mismatch.pdf · uploaded 22 Mar 2024View
  • Proforma of Agreement for saleकरार नामा(1)- RAMANUJ- 256_240505_125201.pdf · uploaded 5 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Archi Certi 05-21-2024 UB.pdf · uploaded 5 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT_26-06-2024.pdf · uploaded 5 Nov 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Archi Certi UB 10-10-24.pdf · uploaded 5 Nov 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers 05-21-2024 UB.pdf · uploaded 5 Nov 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS_26-06-2024.pdf · uploaded 5 Nov 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certi UB 10-10-24.pdf · uploaded 5 Nov 2024View
  • Other – TechnicalRamanuj Society Letter.pdf · uploaded 4 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect UB.pdf · uploaded 3 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGI UB.pdf · uploaded 3 Apr 2025View
  • Disclosure of sold/ booked inventoryUB Sold Book Inventory.pdf · uploaded 4 Apr 2025View
  • Form 1Form 1.pdf · uploaded 11 Jul 2025View
  • Form 2Form 2.pdf · uploaded 11 Jul 2025View
  • Disclosure of Sold and Booked InventoryUB Sold Book Inventory.pdf · uploaded 11 Jul 2025View
  • Form 1Form 1.pdf · uploaded 11 Jul 2025View
  • Form 2Form 2.pdf · uploaded 11 Jul 2025View
  • Disclosure of Sold and Booked InventoryUB Sold Book Inventory.pdf · uploaded 11 Jul 2025View
  • Form 1Form 1.pdf · uploaded 11 Jul 2025View
  • Form 2Form 2.pdf · uploaded 11 Jul 2025View
  • Disclosure of Sold and Booked InventoryUB Sold Book Inventory.pdf · uploaded 11 Jul 2025View
  • Form 1Form 1.pdf · uploaded 11 Jul 2025View
  • Form 2Form 2.pdf · uploaded 11 Jul 2025View
  • Disclosure of Sold and Booked InventoryUB Sold Book Inventory.pdf · uploaded 11 Jul 2025View
  • Form 1Form 1.pdf · uploaded 11 Jul 2025View
  • Form 2Form 2.pdf · uploaded 11 Jul 2025View
  • Disclosure of Sold and Booked InventoryUB Sold Book Inventory.pdf · uploaded 11 Jul 2025View
  • Form 1Architect Certificate.pdf · uploaded 10 Oct 2025View
  • Form 2Engineer Certificate.pdf · uploaded 10 Oct 2025View
  • Disclosure of Sold and Booked InventoryUB Sold Book Inventory.pdf · uploaded 10 Oct 2025View
  • Form 1Form 1.pdf · uploaded 3 Jan 2026View
  • Form 2Form 2.pdf · uploaded 3 Jan 2026View
  • Disclosure of Sold and Booked InventoryInventory 567.pdf · uploaded 3 Jan 2026View
  • Form 1Architects Certificate 2_11zon.pdf · uploaded 9 Apr 2026View
  • Form 2Engineers Certificate UB 2 (1)_11zon.pdf · uploaded 9 Apr 2026View
  • Disclosure of Sold and Booked InventoryUB Sold Book Inventory March 26 2.pdf · uploaded 9 Apr 2026View
  • Form 1FORM1_11zon.pdf · uploaded 13 Jul 2026View
  • Form 2FORM2_11zon.pdf · uploaded 13 Jul 2026View
  • Disclosure of Sold and Booked InventoryUB SOLD INVENTORY.pdf · uploaded 13 Jul 2026View

Promoter documents

  • Declaration Form BRamanuj A2 (2).pdf · uploaded 7 Feb 2024View
  • Legal Title report1 Copy of the legal title report.pdf · uploaded 23 Feb 2024View

Technical documents

  • Layout Approval1_compressed (2).pdfView
  • Layout Approval38 LAYOUT PLAN.pdfView
  • Building Plan Approval1_compressed (2).pdfView
  • Building Plan Approval2_compressed.pdfView
  • Building Plan Approval3_compressed (1).pdfView
  • Building Plan Approval4_compressed.pdfView
  • Building Plan Approval5_compressed.pdfView

Other legal documents

  • Other – LegalName Mismatch A2.pdfView
  • Other – LegalRow House No Mismatch.pdfView
  • Other – Legalplot 1 to 7 sale deed_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter Flat Ramanuj A2.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wadi Bk., Nanded taluka

Survey, CTS, gat or plot numbers

227 To 230250 To 265Plot No 01 To 07Survey No 38/A/1/1

As published on MahaRERA's project page

Plot No 01 To 07, 227 To 230, 250 To 265, Survey No 38/A/1/1, Mouje Wadi (Bk) Nanded 431602

Boundaries

North
Survey No 06
South
Survey No 38 part
East
Survey No 38 Part
West
Survey No 39 40 75 part

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRavi Kadge—
Chartered accountantCA Shailesh Partani—
EngineerRavi Kadge—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology