Sankalp Enclave

Completed

Wadi, Nagpur 440023 |Promoter: M/S. N.k. Associates

7 Sep 2017Registered with MahaRERA
31 Mar 2019Promised completion
1Building
14Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
Commercial Shop, Residential flats14 units in all
Land area for this project
395 sq m (4,250 sq ft)
Permissible built-up area
394 sq m (4,245 sq ft)
Sanctioned built-up area
394 sq m (4,245 sq ft)
Address
Plot No. 52PIN 440023
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.12273, 72.83020
Sankalp Enclave is at latitude 19.12273, longitude 72.83020.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2019

The latest completion date on record passed 7 years and 7 months ago.

Registered
7 Sep 2017
Promised
31 Mar 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000126587 Sep 201731 Mar 2019—M/S. N.k. AssociatesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sankalp Enclave414

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

14 units registered

Commercial Shop · 5 unitsResidential flats · 9 units
TypeCarpet areaUnits
Commercial Shop49.15 sq m · 529 sq ft5
Residential flats253.15 sq m · 2,725 sq ft9

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sankalp Enclave

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWATER SUPPLY FROM COPRORATION AND FROM BORE WELL10%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank50%
  • Storm Water Drains000%
  • Landscaping & Tree PlantingTREES WILL BE PLANTED ON COMPLETION0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterWILL BE DONE IN DUE COURSE0%
  • Solid Waste Management And DisposalWILL BE DONE IN DUE COURSE0%
  • Water conservation /Rain water harvestingWILL BE DONE BEFORE COMPLETION0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationWILL BE DONE IN DUE COURSE0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

4 documents held by Deedo, 17 filings listed on MahaRERA's project page

Registration certificate

Others

Document library

  • Proforma of Allotment letterSANKALP-AGREEMENTS-RERA-pdf.pdf · uploaded 31 Aug 2017Source
  • Proforma of Allotment letterSANKALP-ALLOTMENT LETTER-PDF.pdf · uploaded 31 Aug 2017Source
  • Building Plan Approval (IOD)2.pdf · uploaded 31 Aug 2017Source
  • Copy of the legal title reportTITLE.pdf · uploaded 31 Aug 2017Source
  • Details of encumbrancesSANKALP-ENCUMBERANCE-2.pdf · uploaded 31 Aug 2017Source
  • Copy of Layout Approval (in case of layout)2.pdf · uploaded 31 Aug 2017Source
  • OtherPROPERTY CARD-1-3-333 (1)-NEW.pdf · uploaded 31 Aug 2017Source
  • Declaration in FORM BDECLARATION.pdf · uploaded 31 Aug 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGG.pdf · uploaded 31 Aug 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH.pdf · uploaded 31 Aug 2017Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentIMG_20201022_075318.pdf · uploaded 26 Oct 2020Source

Promoter documents

  • Legal Title reportTITLE.pdf · uploaded 31 Aug 2017Source
  • Declaration Form BDECLARATION.pdf · uploaded 31 Aug 2017Source

Technical documents

Other legal documents

  • OtherPROPERTY CARD-1-3-333 (1)-NEW.pdfSource

Proforma allotment letter

  • Proforma allotment letterSANKALP-ALLOTMENT LETTER-PDF.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Wadi, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

52Plot No. 52

As published on MahaRERA's project page

Plot No. 52

Boundaries

North
Layout Road
South
Plot No 51
East
Plot No 53
West
Lichade Layout

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectM B Malewar Designs Private Limited—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology