Shree Laxmi Estate-II

Completed

Pipla, Nagpur 440023 |Promoter: Shree Laxmi Venture Pvt Ltd

Residential / Group HousingRERAP50500021458
3 Jul 2019Registered with MahaRERA
30 Dec 2023Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
3
Land area for this project
4,450 sq m (47,900 sq ft)
Permissible built-up area
13,929 sq m (1,49,928 sq ft)
Sanctioned built-up area
13,929 sq m (1,49,928 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
NAGPUR METROPOLITAN REGION DEVELOPMENT AUTHORITY
Address
Mouza Pipla Kh No 18/3 P H No.38, Pipla Kharsoli Road, Pipla BesaPIN 440023
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.04142, 79.07106
Shree Laxmi Estate-II is at latitude 21.04142, longitude 79.07106.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2023

The latest completion date on record passed 2 years and 10 months ago.

Registered
3 Jul 2019
Promised
30 Dec 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000214583 Jul 201930 Dec 2023—Shree Laxmi Venture Pvt LtdProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Diamond10—
Platinum10—
Topaz7—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
DiamondClosed/Covered1803600216
PlatinumClosed/Covered1803600216
TopazClosed/Covered4180049

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Diamond

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Platinum

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Topaz

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Common areas and amenities

  • Internal Roads & FootpathsBWM ROAD60%
  • Water SupplyBORE WELL30%
  • Sewerage (Chamber, Lines, Septic Tank , STP)LINES LAYING20%
  • Storm Water DrainsLINE LAYING80%
  • Landscaping & Tree Planting030%
  • Street Lighting00%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage Water00%
  • Solid Waste Management And Disposal00%
  • Water conservation /Rain water harvesting00%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirements00%
  • Electrical meter room, sub-station, receiving station00%
  • Aggregate area of recreational Open SpaceCOMPOUND WALL50%
  • Open Parking00%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

47 documents held by Deedo, 127 filings listed on MahaRERA's project page

Commencement certificates

Form 1s

Form b

Registration certificate

Form 2as

Others

Building plans

Layout plan

Document library

  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)archi cer 2.pdf · uploaded 18 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Estate-2 Engineers Certificateoc 2019-06-18.pdf · uploaded 18 Jun 2019Source
  • Commencement Certificates / NA Order for plotted developmentBuilding permit commencement certificate.pdf · uploaded 18 Jun 2019View
  • Copy of the legal title reportAD NO ENCUMBRANCE.pdf · uploaded 18 Jun 2019Source
  • Building Plan Approval (IOD)patinum diamond.pdf · uploaded 18 Jun 2019View
  • Building Plan Approval (IOD)platinum diamomd.pdf · uploaded 18 Jun 2019View
  • Building Plan Approval (IOD)platinum diamond (2).pdf · uploaded 18 Jun 2019View
  • Building Plan Approval (IOD)platinum diamond (3).pdf · uploaded 18 Jun 2019View
  • Building Plan Approval (IOD)platinum diamond (4).pdf · uploaded 18 Jun 2019View
  • Building Plan Approval (IOD)platinum diamond (5).pdf · uploaded 18 Jun 2019View
  • Building Plan Approval (IOD)platinum diamond.pdf · uploaded 18 Jun 2019View
  • Building Plan Approval (IOD)topaz (2).pdf · uploaded 18 Jun 2019View
  • Building Plan Approval (IOD)layout plan building.pdf · uploaded 18 Jun 2019View
  • OtherEstate-2 Decleration Topaz New Doc 2019-06-18 (1).pdf · uploaded 18 Jun 2019Source
  • Copy of Layout Approval (in case of layout)layout plan.pdf · uploaded 18 Jun 2019View
  • Proforma of Allotment letterEstate- 2 Allotment Letter.pdf · uploaded 18 Jun 2019Source
  • Proforma of Allotment letterDecleration Agreement To sale New Doc 2019-06-18 (1).pdf · uploaded 18 Jun 2019Source
  • OtherEstate 2 Self Declaration.pdf · uploaded 18 Jun 2019Source
  • Declaration in FORM BEstate 2 Affidavit cum Declaration.pdf · uploaded 26 Jun 2019View
  • Details of encumbrancesNew Doc 2019-06-26_1.pdf · uploaded 26 Jun 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)New Doc 2019-10-19 architect.pdf · uploaded 19 Oct 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)New Doc 2019-10-19 engineers.pdf · uploaded 19 Oct 2019Source
  • OtherCREDAI MEMBERSHIP.pdf · uploaded 22 Nov 2019Source
  • OtherCREDAI MEMBERSHIP.pdf · uploaded 22 Nov 2019Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Sheee Laxmi Estate-2 SEP192A.pdf · uploaded 31 Jan 2020Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Sheee Laxmi Estate2 arch dec19.pdf · uploaded 31 Jan 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Sheee Laxmi Estate-2dec192A.pdf · uploaded 31 Jan 2020Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sheee Laxmi Estate2 engi dec19.pdf · uploaded 31 Jan 2020Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH II MARCH20.PDF · uploaded 30 Jul 2020View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH II JUNE20.PDF · uploaded 30 Jul 2020View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ENG II JUNE20-min.pdf · uploaded 30 Jul 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG II MARCH20-min.pdf · uploaded 30 Jul 2020Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ESTATE 2 ARECHI SEP20.pdf · uploaded 26 Oct 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ESTATE2 ENG SEP20.pdf · uploaded 26 Oct 2020Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)form5 es2.pdf · uploaded 19 Mar 2021Source
  • Otherdisclosure of sold booked inventory e2-compressed (1).pdf · uploaded 21 May 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)arch mar21.pdf · uploaded 20 Jul 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng mar21.pdf · uploaded 20 Jul 2021Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)eng june21C.pdf · uploaded 20 Jul 2021Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ar cer June21_compressed.pdf · uploaded 20 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Estate II, March-2021.pdf · uploaded 13 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Estate-II, June-2021.pdf · uploaded 13 Aug 2021Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Archi (Estate-II).PDF · uploaded 14 Oct 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2(Estate-II).PDF · uploaded 14 Oct 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A(Estate-II).PDF · uploaded 14 Oct 2021Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)estate2 archi.pdf · uploaded 15 Jan 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)2 estate2.pdf · uploaded 15 Jan 2022Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A estate2.pdf · uploaded 15 Jan 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)ESTTAE 2.pdf · uploaded 15 Jan 2022Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Copy.PDF · uploaded 17 Mar 2022Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHEST2MARCH2022 (6)_compressed.pdf · uploaded 15 Apr 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM2EST2MARCH2022_compressed.pdf · uploaded 15 Apr 2022Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM2AEST2MARCH2022.pdf · uploaded 15 Apr 2022Source
  • Building Plan Approval (IOD)01.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)02.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)03.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)04.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)05.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)06.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)07.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)08.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)09.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)10.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)11.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)12.pdf · uploaded 16 May 2022View
  • Building Plan Approval (IOD)13.pdf · uploaded 16 May 2022View
  • Commencement Certificates / NA Order for plotted developmentPERMIT.pdf · uploaded 16 May 2022View
  • Disclosure of sold/ booked inventoryDECLERATION OF SOLD UNSOLD ESTATE_compressed.pdf · uploaded 11 Jul 2022Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM2 ESTATE_compressed.pdf · uploaded 11 Jul 2022Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM1 ESTATE-compressed.pdf · uploaded 11 Jul 2022Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Art Cert Estate-II.pdf · uploaded 7 Oct 2022Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 EngCert Estate-II.pdf · uploaded 7 Oct 2022Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A EngCetiEstate-II.pdf · uploaded 7 Oct 2022Source
  • Disclosure of sold/ booked inventoryUnsold Estate-II.pdf · uploaded 7 Oct 2022Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)estate2 form5.pdf · uploaded 28 Dec 2022Source
  • Status of Formation of Legal Entity (Society/Co Op etc.)SOCIETY CERTIFICATE.pdf · uploaded 28 Dec 2022Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arc Estate II Dec 22.pdf · uploaded 16 Jan 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng Cert Estate II Dec 22.pdf · uploaded 16 Jan 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Estate II Dec 22.pdf · uploaded 16 Jan 2023View
  • Disclosure of sold/ booked inventoryUnsold Inventory Dec 22.pdf · uploaded 20 Feb 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ArcESTMAR23.pdf · uploaded 15 Apr 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng2 March 23.pdf · uploaded 15 Apr 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A, Estate -2,March 23.pdf · uploaded 15 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form No52223.pdf · uploaded 1 Jul 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ESTATE ARC JUNE23.pdf · uploaded 15 Jul 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ESTATE ARC JUNE23.pdf · uploaded 15 Jul 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A, Estate -2,March 23.pdf · uploaded 15 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ESTATE 2A June23.pdf · uploaded 15 Jul 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ESTATE 2A June23.pdf · uploaded 15 Jul 2023Source
  • Disclosure of sold/ booked inventoryUnsold Inventory March 23.pdf · uploaded 20 Jul 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect CertSept 23Estate.pdf · uploaded 15 Oct 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)EngCert Sept 23 Estate.pdf · uploaded 15 Oct 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupation Cert topaz.pdf · uploaded 22 Nov 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupation CertiTOPAZ.pdf · uploaded 31 Dec 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentestate form4.pdf · uploaded 4 Jan 2024Source
  • Occupational CertificateCOMM_SHREE LAXMI ESTATE-II_OC.pdf · uploaded 25 Aug 2026Source

Promoter documents

  • Legal Title reportAD NO ENCUMBRANCE.pdf · uploaded 18 Jun 2019Source
  • Declaration Form BEstate 2 Affidavit cum Declaration.pdf · uploaded 26 Jun 2019View

Technical documents

  • Building Plan Approvalpatinum diamond.pdfView
  • Building Plan Approvalplatinum diamomd.pdfView
  • Building Plan Approvalplatinum diamond (2).pdfView
  • Building Plan Approvalplatinum diamond (3).pdfView
  • Building Plan Approvalplatinum diamond (4).pdfView
  • Building Plan Approvalplatinum diamond (5).pdfView
  • Building Plan Approvalplatinum diamond.pdfView
  • Building Plan Approvaltopaz (2).pdfView
  • Building Plan Approvallayout plan building.pdfView
  • Layout Approvallayout plan.pdfView
  • Building Plan Approval01.pdfView
  • Building Plan Approval02.pdfView
  • Building Plan Approval03.pdfView
  • Building Plan Approval04.pdfView
  • Building Plan Approval05.pdfView
  • Building Plan Approval06.pdfView
  • Building Plan Approval07.pdfView
  • Building Plan Approval08.pdfView
  • Building Plan Approval09.pdfView
  • Building Plan Approval10.pdfView
  • Building Plan Approval11.pdfView
  • Building Plan Approval12.pdfView
  • Building Plan Approval13.pdfView

Other legal documents

  • OtherEstate-2 Decleration Topaz New Doc 2019-06-18 (1).pdfSource
  • OtherEstate 2 Self Declaration.pdfSource
  • OtherCREDAI MEMBERSHIP.pdfSource
  • OtherCREDAI MEMBERSHIP.pdfSource
  • Otherdisclosure of sold booked inventory e2-compressed (1).pdfView

Proforma allotment letter

  • Proforma allotment letterEstate- 2 Allotment Letter.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pipla, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

MOUZA PIPLA KH NO 18/3 P H NO.38

As published on MahaRERA's project page

MOUZA PIPLA KH NO 18/3 P H NO.38

Boundaries

North
Kh No 18 Bate 1
South
Kh No 18 Bate 2
East
Kh No 19
West
24 Meter wide road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnjali Kadam Wave Designers And Planners—
ArchitectWavearch Designers And Planners—
Chartered accountantGad & Associates—
Chartered accountantRajesh Bora & Company—
Chartered accountantRenu Anand Kewalramani—
Chartered accountantSumit Santosh Agrawal And Associates—
EngineerDhawal Harshe—
OtherGanesh Bisen Sk Mep Consultant—
OtherPremchand Jaganlal Belkayyaa—
OtherSatyanarayan Bondre—
OtherS B Malode And Associates—

Source: MahaRERA project page. Contact details are not shown.