Central Heights
Certificate SignedPipla, Nagpur 440034 |Promoter: Nirmaan Infra
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- RERA registrations
- 2
- Phases
- 2
- Buildings
- 6
- Unit types
- 1BHK, 2BHK, Society Office293 units in all
- Address
- Plot No. 3, Survey No. 185/1/A, Besa - Pipla Road, PiplaPIN 440034
- Designated bank account
- 171
- Developed in phases
- Yes
Also registered as
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
P50500053562- Registered
- 10 Nov 2023
- Promised
- 31 Dec 2028
- Revised
- 30 Apr 2029
Completion pushed back 4 months
P50500053730- Registered
- 28 Nov 2023
- Promised
- 31 Dec 2028
- Revised
- 30 Apr 2029
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50500053562 | 10 Nov 2023 | 31 Dec 2028 | 30 Apr 2029 | Nirmaan Infra | Project page |
| P50500053730 | 28 Nov 2023 | 31 Dec 2028 | 30 Apr 2029 | Nirmaan Infra | Project page |
6 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Block - E JAY | 8 | 59 |
| Block - F HARSH | 7 | 56 |
| Block - G DEV | 4 | 14 |
| Block - H MRUNAL | 7 | 57 |
| Block - I AROHI | 7 | 51 |
| D Wing SARA HEIGHTS | 7 | 56 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
33 of 293 units booked (11%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P50500053730 | Block - E JAY | 1BHK | 31.34 sq m · 337 sq ft | 1 | 0 |
| P50500053730 | Block - E JAY | 1BHK | 31.36 sq m · 338 sq ft | 1 | 0 |
| P50500053730 | Block - E JAY | 1BHK | 31.55 sq m · 340 sq ft | 1 | 0 |
| P50500053730 | Block - E JAY | 2BHK | 43.93 sq m · 473 sq ft | 28 | 0 |
| P50500053730 | Block - E JAY | 2BHK | 44.68 sq m · 481 sq ft | 28 | 0 |
| P50500053730 | Block - F HARSH | 2BHK | 43.93 sq m · 473 sq ft | 28 | 0 |
| P50500053730 | Block - F HARSH | 2BHK | 44.68 sq m · 481 sq ft | 28 | 0 |
| P50500053730 | Block - G DEV | 2BHK | 50.23 sq m · 541 sq ft | 8 | 0 |
Show all 23 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P50500053730 | Block - G DEV | 2BHK | 50.26 sq m · 541 sq ft | 6 | 0 |
| P50500053562 | Block - H MRUNAL | 2BHK | 40.22 sq m · 433 sq ft | 14 | 0 |
| P50500053562 | Block - H MRUNAL | 2BHK | 40.24 sq m · 433 sq ft | 14 | 0 |
| P50500053562 | Block - H MRUNAL | 2BHK | 40.77 sq m · 439 sq ft | 14 | 0 |
| P50500053562 | Block - H MRUNAL | 2BHK | 40.78 sq m · 439 sq ft | 14 | 0 |
| P50500053562 | Block - H MRUNAL | Society Office | 22.11 sq m · 238 sq ft | 1 | 0 |
| P50500053562 | Block - I AROHI | 2BHK | 40.22 sq m · 433 sq ft | 12 | 0 |
| P50500053562 | Block - I AROHI | 2BHK | 40.24 sq m · 433 sq ft | 13 | 0 |
| P50500053562 | Block - I AROHI | 2BHK | 40.77 sq m · 439 sq ft | 12 | 0 |
| P50500053562 | Block - I AROHI | 2BHK | 40.78 sq m · 439 sq ft | 13 | 0 |
| P50500053562 | Block - I AROHI | Society Office | 22.11 sq m · 238 sq ft | 1 | 0 |
| P50500053562 | D Wing SARA HEIGHTS | 2BHK | 46.28 sq m · 498 sq ft | 14 | 8 |
| P50500053562 | D Wing SARA HEIGHTS | 2BHK | 46.29 sq m · 498 sq ft | 14 | 8 |
| P50500053562 | D Wing SARA HEIGHTS | 2BHK | 46.47 sq m · 500 sq ft | 14 | 8 |
| P50500053562 | D Wing SARA HEIGHTS | 2BHK | 46.7 sq m · 503 sq ft | 14 | 9 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
131 documents held by Deedo, 180 filings listed on MahaRERA's project page
Registration certificate (2)
Layout plan (11)
Show all 311 documentsShow fewer documents
Layout plan (11)
Other (58)
- OtherP50500053562 · Date not statedViewSource
- OtherP50500053730 · Date not statedViewSource
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053562 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
- OtherP50500053730 · Date not statedView
Commencement certificate (4)
Form 1 (33)
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053562 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
- Form 1P50500053730 · Date not statedView
Allotment letter (2)
Title report (2)
Encumbrance details (5)
Building plan (6)
Form 2 (6)
Legal
- Declaration Form BP50500053562 · Form B.pdf · uploaded 21 Jul 2023View
- Declaration Form BP50500053730 · Form B.pdf · uploaded 22 Jul 2023View
- Legal Title reportP50500053730 · 2 Search Report.pdf · uploaded 24 Jul 2023View
- Legal Title reportP50500053562 · 2 Legal Title Report new.pdf · uploaded 1 Aug 2023View
Migrated
- 1 PAN CardP50500053562 · 1 PAN -PDF.pdf · uploaded 26 Jun 2023View
- 1 a Details of encumbrances concerned to FinanceP50500053562 · 4 Declaration concerned to Legal.pdf · uploaded 26 Jun 2023View
- 1 b Details of encumbrances concerned to LegalP50500053562 · 4 Declaration concerned to Legal.pdf · uploaded 26 Jun 2023View
- 1 Copy of Layout Approval (in case of layout)P50500053562 · 5 Layout Approval.pdf · uploaded 26 Jun 2023View
- 1 Building Plan Approval / NA Order for plotted developmentP50500053562 · 7 Building Plan Block D.pdf · uploaded 26 Jun 2023View
- 2 Building Plan Approval / NA Order for plotted developmentP50500053562 · 8 Building Plan Block H.pdf · uploaded 26 Jun 2023View
- 3 Building Plan Approval / NA Order for plotted developmentP50500053562 · 9 Building Plan Block I.pdf · uploaded 26 Jun 2023View
- 1 Commencement Certificates / NA Order for plotted developmentP50500053562 · 11 Commencement Certificate (Building Permit).pdf · uploaded 26 Jun 2023View
- 1 Declaration about Commencement CertificateP50500053562 · 12 Declaration about Commencement Certificate.pdf · uploaded 26 Jun 2023View
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053562 · 16 Engineer's Certificate.pdf · uploaded 26 Jun 2023View
- 1 Deviation Report with respect to Allotment letterP50500053562 · 52 Deviation Report Allotment Letter New.pdf · uploaded 26 Jun 2023View
- 1 Declaration in FORM BP50500053562 · Form B.pdf · uploaded 21 Jul 2023View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053562 · 15 Architect Certificate.pdf · uploaded 21 Jul 2023View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053562 · 23 CA Certificate.pdf · uploaded 21 Jul 2023View
- 1 Proforma of Allotment letterP50500053562 · 42 Allotment Letter NEW.pdf · uploaded 21 Jul 2023View
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP50500053562 · 51 Separate Bank Details new.pdf · uploaded 21 Jul 2023View
- 1 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 1 Ashok Bhuva.pdf · uploaded 22 Jul 2023View
- 2 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 2 Ashish Nilawar.pdf · uploaded 22 Jul 2023View
- 3 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 3 Jitendra Bose.pdf · uploaded 22 Jul 2023View
- 4 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 4 Varsha Kondawar.pdf · uploaded 22 Jul 2023View
- 5 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 5 Aniket Khandaskar.pdf · uploaded 22 Jul 2023View
- 6 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 6 Satish Belsare.pdf · uploaded 22 Jul 2023View
- 7 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 7 Archana Madurwar.pdf · uploaded 22 Jul 2023View
- 8 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 8 Milind Bhawsar.pdf · uploaded 22 Jul 2023View
- 9 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 9 Ratnesh Paralkar.pdf · uploaded 22 Jul 2023View
- 10 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 10 Vinod Paralikar.pdf · uploaded 22 Jul 2023View
- 11 Disclosure of Interest in Other Real Estate OrganizationsP50500053562 · 11 Damodhar Dandekar.pdf · uploaded 22 Jul 2023View
- 1 PAN CardP50500053730 · 1 PAN -PDF.pdf · uploaded 22 Jul 2023View
- 1 Copy of Layout Approval (in case of layout)P50500053730 · 5 Layout Approval.pdf · uploaded 22 Jul 2023View
- 1 Commencement Certificates / NA Order for plotted developmentP50500053730 · 10 Commencement Certificate (Building Permit).pdf · uploaded 22 Jul 2023View
- 1 Declaration about Commencement CertificateP50500053730 · Declaration about commencement certificate.pdf · uploaded 22 Jul 2023View
- 1 Declaration in FORM BP50500053730 · Form B.pdf · uploaded 22 Jul 2023View
- 1 CERSAI detailsP50500053730 · Cersai Search.pdf · uploaded 22 Jul 2023View
- 1 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 1 Ashok Bhuva.pdf · uploaded 22 Jul 2023View
- 2 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 2 Ashish Nilawar.pdf · uploaded 22 Jul 2023Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 3 Jitendra Bose.pdf · uploaded 22 Jul 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 4 Varsha Kondawar.pdf · uploaded 22 Jul 2023Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 5 Aniket Khandaskar.pdf · uploaded 22 Jul 2023Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 6 Satish Belsare.pdf · uploaded 22 Jul 2023Source
- 7 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 7 Archana Madurwar.pdf · uploaded 22 Jul 2023View
- 8 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 8 Milind Bhawsar.pdf · uploaded 22 Jul 2023Source
- 9 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 9 Ratnesh Paralkar.pdf · uploaded 22 Jul 2023Source
- 10 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 10 Vinod Paralikar.pdf · uploaded 22 Jul 2023Source
- 11 Disclosure of Interest in Other Real Estate OrganizationsP50500053730 · 11 Damodhar Dandekar.pdf · uploaded 22 Jul 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP50500053730 · Bank Declaration.pdf · uploaded 22 Jul 2023Source
- 1 Deviation Report with respect to Allotment letterP50500053730 · Deviation Report Allotment Letter new.pdf · uploaded 22 Jul 2023View
- 1 Deviation Report with respect to model copy of AgreementP50500053730 · Deviation Report A to S.pdf · uploaded 22 Jul 2023View
- 1 Copy of the legal title reportP50500053730 · 2 Search Report.pdf · uploaded 24 Jul 2023View
- 1 Proforma of Allotment letterP50500053730 · Allotment Letter.pdf · uploaded 24 Jul 2023View
- 1 Copy of the legal title reportP50500053562 · 2 Legal Title Report new.pdf · uploaded 1 Aug 2023View
- 2 a Details of encumbrances concerned to FinanceP50500053562 · 3 Declaration concerned to Finance.pdf · uploaded 1 Aug 2023View
- 2 b Details of encumbrances concerned to LegalP50500053562 · 3 Declaration concerned to Finance.pdf · uploaded 1 Aug 2023View
- 1 CERSAI detailsP50500053562 · 22 Cersai Search.pdf · uploaded 1 Aug 2023View
- 1 Deviation Report with respect to model copy of AgreementP50500053562 · 53 Deviation Report Agreement To sale New.pdf · uploaded 1 Aug 2023View
- 1 Building Plan Approval / NA Order for plotted developmentP50500053730 · 1MB Building Plan Block E.pdf · uploaded 2 Aug 2023View
- 2 Building Plan Approval / NA Order for plotted developmentP50500053730 · 1 MB Building Plan Block F.pdf · uploaded 2 Aug 2023View
- 3 Building Plan Approval / NA Order for plotted developmentP50500053730 · 1MB Building Plan Block G.pdf · uploaded 2 Aug 2023View
- 1 Proforma of Agreement for saleP50500053730 · Agreement to Sale.pdf · uploaded 2 Aug 2023View
- 2 Copy of Layout Approval (in case of layout)P50500053730 · 6 Floor Plan.pdf · uploaded 4 Aug 2023View
- 1 a Details of encumbrances concerned to FinanceP50500053730 · 3 Declaration concerned to Finance.pdf · uploaded 18 Aug 2023View
- 2 a Details of encumbrances concerned to FinanceP50500053730 · 3 Declaration concerned to Legal.pdf · uploaded 18 Aug 2023View
- 1 b Details of encumbrances concerned to LegalP50500053730 · 3 Declaration concerned to Finance.pdf · uploaded 18 Aug 2023View
- 2 b Details of encumbrances concerned to LegalP50500053730 · 3 Declaration concerned to Legal.pdf · uploaded 18 Aug 2023View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053730 · Architect.pdf · uploaded 18 Aug 2023View
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053730 · Engineer.pdf · uploaded 18 Aug 2023View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053730 · 21 CA Certficate.pdf · uploaded 18 Aug 2023View
- 1 Proforma of Agreement for saleP50500053562 · 36 Agreement to Sale new.pdf · uploaded 25 Aug 2023View
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053562 · Arch-CH3.pdf · uploaded 11 Jan 2024View
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053562 · Devbhumi - CH3.pdf · uploaded 11 Jan 2024View
- 1 Disclosure of sold/ booked inventoryP50500053562 · Disclosure - CH3_compressed.pdf · uploaded 11 Jan 2024View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053562 · CA-CH3_compressed.pdf · uploaded 11 Jan 2024View
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053730 · Arch-CH-2.pdf · uploaded 11 Jan 2024View
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053730 · Devbhumi - CH 2.pdf · uploaded 11 Jan 2024View
- 1 Disclosure of sold/ booked inventoryP50500053730 · Disclosure - CH2.pdf · uploaded 11 Jan 2024View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053730 · CA-CH2_compressed.pdf · uploaded 11 Jan 2024View
- 2 Proforma of Agreement for saleP50500053562 · Agreement to Sale.pdf · uploaded 6 Mar 2024View
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053562 · arch - ch 3.pdf · uploaded 16 Apr 2024View
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053562 · devbhumi - ch 3.pdf · uploaded 16 Apr 2024View
- 2 Disclosure of sold/ booked inventoryP50500053562 · sold unsold - ch 3.pdf · uploaded 16 Apr 2024View
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053562 · ca - ch 3_compressed.pdf · uploaded 16 Apr 2024View
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053730 · arch - ch 2.pdf · uploaded 16 Apr 2024View
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053730 · devbhumi - ch 2(2).pdf · uploaded 16 Apr 2024View
- 2 Disclosure of sold/ booked inventoryP50500053730 · sold-unsold - ch 2.pdf · uploaded 16 Apr 2024View
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053730 · ca - ch 2_compressed.pdf · uploaded 16 Apr 2024View
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053562 · Architect central heights-3.pdf · uploaded 13 Jul 2024View
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053562 · Engineer central heights-3.pdf · uploaded 13 Jul 2024View
- 3 Disclosure of sold/ booked inventoryP50500053562 · Sold Unsold Central heights -3_compressed.pdf · uploaded 13 Jul 2024View
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053562 · C A central heights-3_compressed.pdf · uploaded 13 Jul 2024View
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053730 · Architect central heights- 2.pdf · uploaded 13 Jul 2024View
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053730 · Engineer central heights- 2.pdf · uploaded 13 Jul 2024View
- 3 Disclosure of sold/ booked inventoryP50500053730 · Sold Unsold Central heights -2_compressed.pdf · uploaded 13 Jul 2024View
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053730 · C A central heights- 2_compressed.pdf · uploaded 13 Jul 2024View
- 1 Proforma of Agreement for saleP50500053562 · ATS Draft-CH3-RERA.pdf · uploaded 9 Oct 2024View
- 1 Proforma of Agreement for saleP50500053730 · ATS Draft-CH2.pdf · uploaded 9 Oct 2024View
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053562 · Architect Certificate-CH3.pdf · uploaded 17 Oct 2024View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053562 · CA Certificate-CH3_comp.pdf · uploaded 17 Oct 2024View
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053562 · Engineers Certificate-CH-3.pdf · uploaded 17 Oct 2024View
- 2 Disclosure of sold/ booked inventoryP50500053562 · sold booked inventory-CH3_comp.pdf · uploaded 17 Oct 2024View
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053730 · Architect Certificate-CH2.pdf · uploaded 17 Oct 2024View
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053730 · CA Certificate-CH2_comp.pdf · uploaded 17 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053730 · Engineers Certificate-CH2.pdf · uploaded 17 Oct 2024View
- 2 Disclosure of sold/ booked inventoryP50500053730 · sold booked inventory-CH2_comp.pdf · uploaded 17 Oct 2024View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053562 · Architect Certificate_CH3.pdf · uploaded 13 Jan 2025View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053562 · CA Certificate_CH3_compressed.pdf · uploaded 13 Jan 2025View
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053562 · Engineer Certificate_CH3.pdf · uploaded 13 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP50500053562 · sold unsold inventory_CH3.pdf · uploaded 13 Jan 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053730 · Architect Certificate_CH2.pdf · uploaded 13 Jan 2025View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053730 · CA Certificate_CH2_compressed.pdf · uploaded 13 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053730 · Engineer Certificate_CH2.pdf · uploaded 13 Jan 2025View
- 1 Disclosure of sold/ booked inventoryP50500053730 · sold unsold inventory_CH2.pdf · uploaded 13 Jan 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053562 · Architect C H 3.pdf · uploaded 18 Apr 2025View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053562 · C A C h 3_compressed.pdf · uploaded 18 Apr 2025View
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053562 · Engineer C H 3.pdf · uploaded 18 Apr 2025View
- 1 Disclosure of sold/ booked inventoryP50500053562 · inventory C H 3_compressed.pdf · uploaded 18 Apr 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P50500053730 · Architect CH -2.pdf · uploaded 18 Apr 2025View
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P50500053730 · CA certificate CH -2_compressed.pdf · uploaded 18 Apr 2025View
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P50500053730 · Engineer certificate CH -2.pdf · uploaded 18 Apr 2025View
- 1 Disclosure of sold/ booked inventoryP50500053730 · inventory C H 2_compressed.pdf · uploaded 18 Apr 2025View
- Withdrawal Update Form 1P50500053562 · Arch_CH3_update.pdf · uploaded 30 May 2025Source
- Withdrawal Update Form 2P50500053562 · Engr_CH3_update.pdf · uploaded 30 May 2025Source
- Withdrawal Update Form 3P50500053562 · CA_CH3_update.pdf · uploaded 30 May 2025Source
- Withdrawal Update Form 1P50500053730 · Arch_CH2_update.pdf · uploaded 30 May 2025Source
- Withdrawal Update Form 2P50500053730 · Egr_CH2_update.pdf · uploaded 30 May 2025Source
- Withdrawal Update Form 3P50500053730 · CA_CH2_update.pdf · uploaded 30 May 2025Source
- Withdrawal Update Form 1P50500053562 · Architect_CH3.pdf · uploaded 17 Jul 2025Source
- Withdrawal Update Form 2P50500053562 · Engineer_CH3.pdf · uploaded 17 Jul 2025Source
- Withdrawal Update Form 3P50500053562 · CA_CH3.pdf · uploaded 17 Jul 2025Source
- Withdrawal Update Form 1P50500053562 · Architect Certificate_CH3.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2P50500053562 · Engineer Certificate_CH3.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3P50500053562 · CA Certificate_CH3.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1P50500053730 · Architect Certificate_CH2.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 2P50500053730 · Engineer Certificate_CH2.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 3P50500053730 · CA Certificate_CH2.pdf · uploaded 17 Oct 2025Source
- Withdrawal Update Form 1P50500053562 · Architect_CH3.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2P50500053562 · Engineer Certificate_CH3.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3P50500053562 · CA Certificate_CH3_compressed.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1P50500053730 · Architect Certificate_CH2.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 2P50500053730 · Engineer Certificate_CH2.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 3P50500053730 · CA Certificate_CH2_compressed.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1P50500053562 · Architect_CH3.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P50500053562 · Engineer_CH3.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P50500053562 · CA_CH3.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P50500053730 · Architect_CH2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2P50500053730 · Engineer_CH2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3P50500053730 · CA_CH2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 1P50500053562 · Architect_CH3.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 2P50500053562 · Engineer_CH3.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 3P50500053562 · CA_CH3.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 1P50500053730 · Architect_CH2.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 2P50500053730 · Engineer_CH2.pdf · uploaded 16 Jul 2026Source
- Withdrawal Update Form 3P50500053730 · CA_CH2.pdf · uploaded 16 Jul 2026Source
Technical
- DocumentP50500053562 · 5 Layout Approval.pdf · uploaded 26 Jun 2023View
- DocumentP50500053562 · 7 Building Plan Block D.pdf · uploaded 26 Jun 2023View
- DocumentP50500053562 · 8 Building Plan Block H.pdf · uploaded 26 Jun 2023View
- DocumentP50500053562 · 9 Building Plan Block I.pdf · uploaded 26 Jun 2023View
- DocumentP50500053730 · 5 Layout Approval.pdf · uploaded 22 Jul 2023View
- DocumentP50500053730 · 1MB Building Plan Block E.pdf · uploaded 2 Aug 2023View
- DocumentP50500053730 · 1 MB Building Plan Block F.pdf · uploaded 2 Aug 2023View
- DocumentP50500053730 · 1MB Building Plan Block G.pdf · uploaded 2 Aug 2023View
- DocumentP50500053730 · 6 Floor Plan.pdf · uploaded 4 Aug 2023View
Technical (Architect)
- DocumentP50500053562 · Architect Certificate-CH3.pdf · uploaded 17 Oct 2024View
- DocumentP50500053730 · Architect Certificate-CH2.pdf · uploaded 17 Oct 2024View
- DocumentP50500053562 · Architect Certificate_CH3.pdf · uploaded 13 Jan 2025View
- DocumentP50500053730 · Architect Certificate_CH2.pdf · uploaded 13 Jan 2025View
- DocumentP50500053562 · Architect C H 3.pdf · uploaded 18 Apr 2025View
- DocumentP50500053730 · Architect CH -2.pdf · uploaded 18 Apr 2025View
- DocumentP50500053562 · Architect_CH3.pdf · uploaded 16 Jul 2026Source
- DocumentP50500053730 · Architect_CH2.pdf · uploaded 16 Jul 2026Source
Technical (Engineer)
- DocumentP50500053562 · Engineers Certificate-CH-3.pdf · uploaded 17 Oct 2024View
- DocumentP50500053730 · Engineers Certificate-CH2.pdf · uploaded 17 Oct 2024View
- DocumentP50500053562 · Engineer Certificate_CH3.pdf · uploaded 13 Jan 2025View
- DocumentP50500053730 · Engineer Certificate_CH2.pdf · uploaded 13 Jan 2025View
- DocumentP50500053562 · Engineer C H 3.pdf · uploaded 18 Apr 2025View
- DocumentP50500053730 · Engineer certificate CH -2.pdf · uploaded 18 Apr 2025View
- DocumentP50500053562 · Engineer_CH3.pdf · uploaded 16 Jul 2026Source
- DocumentP50500053730 · Engineer_CH2.pdf · uploaded 16 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Pipla, Nagpur (Rural) taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 9 Mtrs Wide Road
- South
- 9 Mtrs Wide Road
- East
- Khasra No 185 Part
- West
- Plot No 2
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Sanjay Basantani | — | P50500053562 |
| Architect | Ssb Associates | — | P50500053730 |
| Chartered accountant | GKJ And Associates | — | P50500053562 |
| Chartered accountant | Gkj & Associates | — | P50500053730 |
| Engineer | Devendra Nathabhai Patel | — | P50500053562 |
| Engineer | Devendra Nathabhai Patel | — | P50500053730 |
| Other | Indigene Law And Associates | — | P50500053562 |
| Other | Indigene Law And Associates Through Adv Suyog H Madavi | — | P50500053730 |
| Other | Nirmaan Infra | — | P50500053562 |
Source: MahaRERA project page. Contact details are not shown.