Skip to content
Deedo home
Menu

Atharva Nagari VIII

Active

Pipla, Nagpur 440034 |Promoter: Atharva Infrastructures

Residential / Group HousingRERAP50500053130
16 Oct 2023Registered with MahaRERA
31 Dec 2028Promised completion
6Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
6
Land area for this project
16,200 sq m (1,74,375 sq ft)
Permissible built-up area
36,323 sq m (3,90,974 sq ft)
Sanctioned built-up area
36,321 sq m (3,90,959 sq ft)
Recreational open space
1,511 sq m (16,259 sq ft)
Address
123/2 and 123/3, Pipla, PiplaPIN 440034
Designated bank account
Bank Of Baroda
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.08064, 79.12343
Atharva Nagari VIII is at latitude 21.08064, longitude 79.12343.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2028

Registered
16 Oct 2023
Promised
31 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050005313016 Oct 202331 Dec 2028—Atharva InfrastructuresProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A15—
Wing B15—
Wing C15—
Wing D0—
Wing E15—
Wing F15—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered0490857
Wing AOpen Space980016114
Wing BClosed/Covered0280028
Wing BOpen Space5600056
Wing CClosed/Covered0280028
Wing COpen Space5600056
Wing DOpen Space00000
Wing EClosed/Covered0280028
Wing EOpen Space5600056
Wing FClosed/Covered0280028
Wing FOpen Space5600056

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Wing B

  • Excavation100%
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises45%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Wing C

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing D

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing E

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing F

  • Excavation100%
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Common areas and amenities

  • Internal Roads & FootpathsAS PER SANCTION PLANNot applicable
  • Water SupplyWork not started0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Work not started0%
  • Storm Water DrainsWork not started0%
  • Landscaping & Tree PlantingWork not started0%
  • Street LightingAS PER SANCTION PLANNot applicable
  • Community BuildingsAS PER SANCTION PLANNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterWork not started0%
  • Solid Waste Management And DisposalWork not started0%
  • Water conservation /Rain water harvestingWork not started0%
  • Energy managemcntWork not started0%
  • Fire protection and fire safety requirementsWork not started0%
  • Electrical meter room, sub-station, receiving stationWork not started0%
  • Aggregate area of recreational Open SpaceWork not started0%
  • Open ParkingWork not started0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

119 documents held by Deedo, 155 filings listed on MahaRERA's project page

Title

Encumbrances

Commencement certificates

Form b

Others

Allotment letters

Form 1s

Form 2s

Form 2as

Form 5s

Registration certificate

Layout plans

Building plans

Document library

  • Copy of the legal title reportLegal Title Search Report _compressed.pdf · uploaded 29 Jul 2023View
  • Copy of Layout Approval (in case of layout)LAY OUT MAP.pdf · uploaded 29 Jul 2023View
  • Declaration about Commencement CertificateDeclaration to commencement.pdf · uploaded 29 Jul 2023View
  • Declaration in FORM BFORM B.pdf · uploaded 29 Jul 2023View
  • CERSAI detailsCERSAI Certificate.pdf · uploaded 29 Jul 2023View
  • Proforma of Agreement for saleDRAFT AGREEMENT FOR SELL.pdf · uploaded 29 Jul 2023View
  • Other – LegalLegal .pdf · uploaded 29 Jul 2023View
  • a Details of encumbrances concerned to FinanceNon Encumbrance by advocate.pdf · uploaded 29 Jul 2023View
  • a Details of encumbrances concerned to FinanceFinance Encumbrances.pdf · uploaded 29 Jul 2023View
  • b Details of encumbrances concerned to LegalNon Encumbrance by advocate.pdf · uploaded 29 Jul 2023View
  • b Details of encumbrances concerned to LegalFinance Encumbrances.pdf · uploaded 29 Jul 2023View
  • Other – FinanceFinance Encumbrances.pdf · uploaded 29 Jul 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration to Seperate Bank Account.pdf · uploaded 29 Jul 2023View
  • Deviation Report with respect to Allotment letterDeclaration to Aloment Letter.pdf · uploaded 29 Jul 2023View
  • Deviation Report with respect to model copy of AgreementDeclaration to AFS.pdf · uploaded 29 Jul 2023View
  • Deviation Report with respect to model copy of AgreementDeclaration to AFS.pdf · uploaded 29 Jul 2023View
  • Building Plan Approval / NA Order for plotted developmentSITE PLAN 1-8_compressed.pdf · uploaded 29 Jul 2023View
  • Commencement Certificates / NA Order for plotted developmentBUILDING PERMITT_compressed.pdf · uploaded 29 Jul 2023View
  • Proforma of Allotment letterAllotement Letter.pdf · uploaded 29 Jul 2023View
  • Proforma of Agreement for saleRERA-ATHARVA INFRASTRUCTURES-ATHARVA NAGARI-VIII-AGREEMENT- (BLANK) - 2023.pdf · uploaded 11 Aug 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA ARCHITECT CERTIFICATE -1.pdf · uploaded 11 Aug 2023View
  • Other – TechnicalSITE PLAN 1-8 (1).pdf · uploaded 26 Aug 2023View
  • Other – TechnicalELEVATION SECTION WING A 2,8.pdf · uploaded 26 Aug 2023View
  • Other – TechnicalELEVATION WING B- 3,8.pdf · uploaded 26 Aug 2023View
  • Other – TechnicalGROUND FLOOR PLAN WING A.pdf · uploaded 26 Aug 2023View
  • Other – TechnicalGROUND FLOOR PLAN WING B.pdf · uploaded 26 Aug 2023View
  • Other – TechnicalWING A FLOOR PLAN.pdf · uploaded 26 Aug 2023View
  • Other – TechnicalFLOOR PLAN WING A.pdf · uploaded 26 Aug 2023View
  • Other – TechnicalFLOOR PLAN WING B.pdf · uploaded 26 Aug 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Chandrakant Suramwar.pdf · uploaded 26 Aug 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Gopal Waghmare.pdf · uploaded 26 Aug 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Manoj Suramwar.pdf · uploaded 26 Aug 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A narendra Mallelwar.pdf · uploaded 26 Aug 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Rahul Mallelwar.pdf · uploaded 26 Aug 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Raju Channawar.pdf · uploaded 26 Aug 2023View
  • Other – TechnicalCovering letter nagar panchayat.pdf · uploaded 26 Aug 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGI CERT_8_DEC_23.pdf · uploaded 20 Jan 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSAPERATE BANK ACCOUNT.pdf · uploaded 22 Feb 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate N8 31032024.pdf · uploaded 10 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate 31032024.pdf · uploaded 10 May 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A.pdf · uploaded 24 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Atharva Nagari - VIII June 2024.pdf · uploaded 19 Jul 2024View
  • Commencement Certificates / NA Order for plotted developmentBLDG PERMIT.pdf · uploaded 9 Dec 2024View
  • Copy of Layout Approval (in case of layout)SITE PLAN.pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentWING A 1 TO 7 9 TO 12 14 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentWING A ELEVATION and SECTION.pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentWING A 8 and 13 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentWING B 8 14 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentWING A GROUND FLOOR AREA STMT.pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentWING B GROUND 1 TO 7 9 TO 12 14 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentWING B ELEVATION.pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentWING F GROUND FLOOR and ELEVATION SECTION PLAN.pdf · uploaded 9 Dec 2024View
  • Building Plan Approval / NA Order for plotted developmentWING F 1 TO 14 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
  • Commencement Certificates / NA Order for plotted developmentEc atharva 8.pdf · uploaded 9 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Atharva Nagari VIII_RERA_Form 2 dec 24.pdf · uploaded 9 Jan 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Atharva Nagari VIII_RERA_Form 2A_MAR-24.pdf · uploaded 9 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 Atharva Nagari- 8.pdf · uploaded 9 Jan 2025View
  • Disclosure of sold/ booked inventorysold unsold atharva nagari-8 dec 24.pdf · uploaded 9 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Atharva Nagar VIII _Dec_2024.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentSITE PLAN_compressed.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentWING A GROUND FLOOR AREA STMT_compressed.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentWING A 8 13 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentWING A 1 TO 7 9 TO 12 14 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentWING A ELEVATION SECTION_compressed.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentWING F GROUND FLOOR ELEVATION SECTION PLAN_compressed.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentWING F 1 TO 14 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentWING B 8 14 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentWING B GROUND 1 TO 7 9 TO 12 14 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
  • Building Plan Approval / NA Order for plotted developmentWING B ELEVATION_compressed.pdf · uploaded 9 Jan 2025View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samechange of bank name Format A (1).pdf · uploaded 6 Feb 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Change of bank Format B (1).pdf · uploaded 6 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Arc certificate 31032025_compressed.pdf · uploaded 23 May 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engi certificate 31032025_compressed.pdf · uploaded 23 May 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Annexure A change in bank.pdf · uploaded 19 Jun 2025View
  • Other – TechnicalAnnexure A letter head.pdf · uploaded 3 Jul 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)NAGARI VIII ARC 30062025_compressed.pdf · uploaded 19 Jul 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)NAGARI VIII ENGI CER 30062025.pdf · uploaded 19 Jul 2025View
  • Form 1Form 1 Archi Certi DECEMBER 2023.pdf · uploaded 25 Feb 2026View
  • Form 2Form 2 1 Engineer Certificate DEC 2023.pdf · uploaded 25 Feb 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory.pdf · uploaded 25 Feb 2026View
  • Form 1Form 1 Archi Certi MARCH 2024.pdf · uploaded 25 Feb 2026View
  • Form 2Form 2 Engineer Certificate MARCH 2024.pdf · uploaded 25 Feb 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory March 2024.pdf · uploaded 25 Feb 2026View
  • Form 1Form 1 Archi Certi JUNE 2024.pdf · uploaded 25 Feb 2026View
  • Form 2Form 2 Engineer Certificate June 2024.pdf · uploaded 25 Feb 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory.pdf · uploaded 25 Feb 2026View
  • Form 1Form 1 Archi Certi MARCH 2025.pdf · uploaded 25 Feb 2026View
  • Form 2Form 2 1 Engineer Certificate MARCH 2025.pdf · uploaded 25 Feb 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of SOld Inventory March 2025.pdf · uploaded 25 Feb 2026View
  • Form 1Form 1 Archi Certi JUNE 2025.pdf · uploaded 26 Feb 2026View
  • Form 2Form 2 1 Engineer Certificate JUNE 2025.pdf · uploaded 26 Feb 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory.pdf · uploaded 26 Feb 2026View
  • Form 1Form 1 Archi Certi DECEMBER 2024.pdf · uploaded 26 Feb 2026View
  • Form 2Form 2 1 Engineer Certificate DEC 2024.pdf · uploaded 26 Feb 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of sold and unsold Inventory.pdf · uploaded 26 Feb 2026View
  • Form 1Form 1 Archi Certi SEPTEMBER 2025.pdf · uploaded 28 Feb 2026View
  • Form 2Form 2 1 Engineer Certificate SEPT 2025.pdf · uploaded 28 Feb 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory.pdf · uploaded 28 Feb 2026View
  • Form 1Form 1 Archi Certi Sep 2024.pdf · uploaded 28 Feb 2026View
  • Form 2Form 2 Engineer Certificate Sep 2024.pdf · uploaded 28 Feb 2026View
  • Disclosure of Sold and Booked InventoryDIsclosure of Sold and Unsold inventory.pdf · uploaded 28 Feb 2026View
  • Form 1Form 1 Architect certificate N-8 Dec-25.pdf · uploaded 28 Feb 2026View
  • Form 2Form 2 Engineer certificate N-8 Dec-25.pdf · uploaded 28 Feb 2026View
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory Dec 2025.pdf · uploaded 28 Feb 2026View
  • Form 5 (FY 2023-2024)Form 5 2023-2024.pdf · uploaded 19 Mar 2026View
  • Form 5 (FY 2024-2025)Form 5 2024-2025.pdf · uploaded 19 Mar 2026View
  • Form 2A (FY 2023-2024)Form 2A March 2024 NAGARI VIII.pdf · uploaded 2 Apr 2026View
  • Form 2A (FY 2024-2025)Form 2A March 2025 NAGARI VIII.pdf · uploaded 2 Apr 2026View
  • Form 1form1 Atharva NAGARI VIII march 2026.pdf · uploaded 12 May 2026View
  • Form 2form 2 Atharva NAGARI VIII march 2026.pdf · uploaded 12 May 2026View
  • Disclosure of Sold and Booked InventoryATHARVA NAGARI VIII SOLD UNSOLD march 2026.pdf · uploaded 12 May 2026View
  • Withdrawal Update Form 1Atharva Nagari - VIII June 2024.pdf · uploaded 25 Jun 2026View
  • Withdrawal Update Form 2Engineers Certificate 31032024.pdf · uploaded 25 Jun 2026View
  • Withdrawal Update Form 1ARCHI CERTI NAG-VIII JUNE 2026.pdf · uploaded 25 Jul 2026View
  • Withdrawal Update Form 2ENGI CERTI NAG-VIII JUNE 2026.pdf · uploaded 25 Jul 2026View
  • Form 2A (FY 2025-2026)Form 2A (2025-26).pdf · uploaded 27 Jul 2026View

Promoter documents

  • Legal Title reportLegal Title Search Report _compressed.pdf · uploaded 29 Jul 2023View
  • Declaration Form BFORM B.pdf · uploaded 29 Jul 2023View

Technical documents

  • Layout ApprovalLAY OUT MAP.pdfView
  • Layout ApprovalSITE PLAN.pdfView
  • Layout Approval1.pdfView
  • Layout Approval2.pdfView
  • Layout Approval3.pdfView
  • Layout Approval4.pdfView
  • Layout Approval5.pdfView
  • Layout Approval6.pdfView
  • Layout Approval7.pdfView
  • Layout Approval8.pdfView
  • Layout Approval9.pdfView
  • Layout Approval10.pdfView
  • Layout Approval11.pdfView
  • Building Plan ApprovalSITE PLAN 1-8_compressed.pdfView
  • Building Plan ApprovalSITE PLAN_compressed.pdfView
  • Building Plan ApprovalWING A GROUND FLOOR AREA STMT_compressed.pdfView
  • Building Plan ApprovalWING A ELEVATION SECTION_compressed.pdfView
  • Building Plan ApprovalWING A 1 TO 7 9 TO 12 14 FLOOR PLAN_compressed.pdfView
  • Building Plan ApprovalWING A 8 13 FLOOR PLAN_compressed.pdfView
  • Building Plan ApprovalWING B ELEVATION_compressed.pdfView
  • Building Plan ApprovalWING B GROUND 1 TO 7 9 TO 12 14 FLOOR PLAN_compressed.pdfView
  • Building Plan ApprovalWING B 8 14 FLOOR PLAN_compressed.pdfView
  • Building Plan ApprovalWING F 1 TO 14 FLOOR PLAN_compressed.pdfView
  • Building Plan ApprovalWING F GROUND FLOOR ELEVATION SECTION PLAN_compressed.pdfView
  • Building Plan ApprovalWING A 1 TO 7 9 TO 12 14 FLOOR PLAN.pdfView
  • Building Plan ApprovalWING A 8 and 13 FLOOR PLAN.pdfView
  • Building Plan ApprovalWING A ELEVATION and SECTION.pdfView
  • Building Plan ApprovalWING A GROUND FLOOR AREA STMT.pdfView
  • Building Plan ApprovalWING B 8 14 FLOOR PLAN.pdfView
  • Building Plan ApprovalWING B ELEVATION.pdfView
  • Building Plan ApprovalWING B GROUND 1 TO 7 9 TO 12 14 FLOOR PLAN.pdfView
  • Building Plan ApprovalWING F 1 TO 14 FLOOR PLAN.pdfView
  • Building Plan ApprovalWING F GROUND FLOOR and ELEVATION SECTION PLAN.pdfView

Other legal documents

  • Other – LegalLegal .pdfView

Financial documents

  • Other – FinanceFinance Encumbrances.pdf · uploaded 29 Jul 2023View

Commencement certificates and NA orders

  • Commencement certificate / NA orderSource

Proforma allotment letter

  • Proforma allotment letterAllotement Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pipla, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

123/2123/3123/3S. No. 123/2

As published on MahaRERA's project page

123/2 and 123/3

Boundaries

North
Khasra Number 152
South
Khasara Number 123 by 1
East
Khasara Number 123 by 1
West
Khasara Number 151

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRajesh Jaiswal—
Chartered accountantCA Ram Bonde—
Chartered accountantRavindra Lashkare—
Chartered accountantSanjay Kamde—
EngineerRupesh Porkute—
OtherShree Shambhu Infrastructure—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology