Atharva Nagari VIII
ActivePipla, Nagpur 440034 |Promoter: Atharva Infrastructures
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Active
- Buildings
- 6
- Land area for this project
- 16,200 sq m (1,74,375 sq ft)
- Permissible built-up area
- 36,323 sq m (3,90,974 sq ft)
- Sanctioned built-up area
- 36,321 sq m (3,90,959 sq ft)
- Recreational open space
- 1,511 sq m (16,259 sq ft)
- Address
- 123/2 and 123/3, Pipla, PiplaPIN 440034
- Designated bank account
- Bank Of Baroda
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- None declared
Location
Coordinates as published by MahaRERA
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2028
- Registered
- 16 Oct 2023
- Promised
- 31 Dec 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50500053130 | 16 Oct 2023 | 31 Dec 2028 | — | Atharva Infrastructures | Project page |
6 buildings
Buildings and wings named in the registration
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 units registered
Parking
| Building | Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|---|
| Wing A | Closed/Covered | 0 | 49 | 0 | 8 | 57 |
| Wing A | Open Space | 98 | 0 | 0 | 16 | 114 |
| Wing B | Closed/Covered | 0 | 28 | 0 | 0 | 28 |
| Wing B | Open Space | 56 | 0 | 0 | 0 | 56 |
| Wing C | Closed/Covered | 0 | 28 | 0 | 0 | 28 |
| Wing C | Open Space | 56 | 0 | 0 | 0 | 56 |
| Wing D | Open Space | 0 | 0 | 0 | 0 | 0 |
| Wing E | Closed/Covered | 0 | 28 | 0 | 0 | 28 |
| Wing E | Open Space | 56 | 0 | 0 | 0 | 56 |
| Wing F | Closed/Covered | 0 | 28 | 0 | 0 | 28 |
| Wing F | Open Space | 56 | 0 | 0 | 0 | 56 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress
Work completed, as the promoter reported it to MahaRERA (Form 1)
Wing A
Wing B
Wing C
Wing D
Wing E
Wing F
Common areas and amenities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Documents
119 documents held by Deedo, 155 filings listed on MahaRERA's project page
Encumbrances
Commencement certificates
Others
- Other29 Jul 2023ViewSource
- Other29 Jul 2023ViewSource
- Other29 Jul 2023ViewSource
- Other11 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other26 Aug 2023ViewSource
- Other9 Jan 2025ViewSource
- Other6 Feb 2025ViewSource
- Other19 Jun 2025ViewSource
- Other3 Jul 2025ViewSource
- Other25 Feb 2026ViewSource
- Other25 Feb 2026ViewSource
- Other28 Feb 2026ViewSource
- Other28 Feb 2026ViewSource
- Other28 Feb 2026ViewSource
- Other12 May 2026ViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
- OtherDate not statedViewSource
Form 1s
- Form 111 Aug 2023ViewSource
- Form 110 May 2024ViewSource
- Form 19 Jan 2025ViewSource
- Form 123 May 2025ViewSource
- Form 119 Jul 2025ViewSource
- Form 125 Feb 2026ViewSource
- Form 125 Feb 2026ViewSource
- Form 128 Feb 2026ViewSource
- Form 128 Feb 2026ViewSource
- Form 128 Feb 2026ViewSource
- Form 112 May 2026ViewSource
- Form 125 Jun 2026ViewSource
- Form 125 Jul 2026ViewSource
Form 2s
- Form 220 Jan 2024ViewSource
- Form 29 Jan 2025ViewSource
- Form 223 May 2025ViewSource
- Form 219 Jul 2025ViewSource
- Form 225 Feb 2026ViewSource
- Form 225 Feb 2026ViewSource
- Form 225 Feb 2026ViewSource
- Form 226 Feb 2026ViewSource
- Form 228 Feb 2026ViewSource
- Form 228 Feb 2026ViewSource
- Form 228 Feb 2026ViewSource
- Form 212 May 2026ViewSource
- Form 225 Jun 2026ViewSource
- Form 225 Jul 2026ViewSource
Form 2as
Layout plans
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
- Layout planDate not statedViewSource
Building plans
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
- Building planDate not statedViewSource
Document library
- Copy of the legal title reportLegal Title Search Report _compressed.pdf · uploaded 29 Jul 2023View
- Copy of Layout Approval (in case of layout)LAY OUT MAP.pdf · uploaded 29 Jul 2023View
- Declaration about Commencement CertificateDeclaration to commencement.pdf · uploaded 29 Jul 2023View
- Declaration in FORM BFORM B.pdf · uploaded 29 Jul 2023View
- CERSAI detailsCERSAI Certificate.pdf · uploaded 29 Jul 2023View
- Proforma of Agreement for saleDRAFT AGREEMENT FOR SELL.pdf · uploaded 29 Jul 2023View
- Other – LegalLegal .pdf · uploaded 29 Jul 2023View
- a Details of encumbrances concerned to FinanceNon Encumbrance by advocate.pdf · uploaded 29 Jul 2023View
- a Details of encumbrances concerned to FinanceFinance Encumbrances.pdf · uploaded 29 Jul 2023View
- b Details of encumbrances concerned to LegalNon Encumbrance by advocate.pdf · uploaded 29 Jul 2023View
- b Details of encumbrances concerned to LegalFinance Encumbrances.pdf · uploaded 29 Jul 2023View
- Other – FinanceFinance Encumbrances.pdf · uploaded 29 Jul 2023View
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration to Seperate Bank Account.pdf · uploaded 29 Jul 2023View
- Deviation Report with respect to Allotment letterDeclaration to Aloment Letter.pdf · uploaded 29 Jul 2023View
- Deviation Report with respect to model copy of AgreementDeclaration to AFS.pdf · uploaded 29 Jul 2023View
- Deviation Report with respect to model copy of AgreementDeclaration to AFS.pdf · uploaded 29 Jul 2023View
- Building Plan Approval / NA Order for plotted developmentSITE PLAN 1-8_compressed.pdf · uploaded 29 Jul 2023View
- Commencement Certificates / NA Order for plotted developmentBUILDING PERMITT_compressed.pdf · uploaded 29 Jul 2023View
- Proforma of Allotment letterAllotement Letter.pdf · uploaded 29 Jul 2023View
- Proforma of Agreement for saleRERA-ATHARVA INFRASTRUCTURES-ATHARVA NAGARI-VIII-AGREEMENT- (BLANK) - 2023.pdf · uploaded 11 Aug 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA ARCHITECT CERTIFICATE -1.pdf · uploaded 11 Aug 2023View
- Other – TechnicalSITE PLAN 1-8 (1).pdf · uploaded 26 Aug 2023View
- Other – TechnicalELEVATION SECTION WING A 2,8.pdf · uploaded 26 Aug 2023View
- Other – TechnicalELEVATION WING B- 3,8.pdf · uploaded 26 Aug 2023View
- Other – TechnicalGROUND FLOOR PLAN WING A.pdf · uploaded 26 Aug 2023View
- Other – TechnicalGROUND FLOOR PLAN WING B.pdf · uploaded 26 Aug 2023View
- Other – TechnicalWING A FLOOR PLAN.pdf · uploaded 26 Aug 2023View
- Other – TechnicalFLOOR PLAN WING A.pdf · uploaded 26 Aug 2023View
- Other – TechnicalFLOOR PLAN WING B.pdf · uploaded 26 Aug 2023View
- Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Chandrakant Suramwar.pdf · uploaded 26 Aug 2023View
- Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Gopal Waghmare.pdf · uploaded 26 Aug 2023View
- Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Manoj Suramwar.pdf · uploaded 26 Aug 2023View
- Disclosure of Interest in Other Real Estate OrganizationsAnnexure A narendra Mallelwar.pdf · uploaded 26 Aug 2023View
- Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Rahul Mallelwar.pdf · uploaded 26 Aug 2023View
- Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Raju Channawar.pdf · uploaded 26 Aug 2023View
- Other – TechnicalCovering letter nagar panchayat.pdf · uploaded 26 Aug 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGI CERT_8_DEC_23.pdf · uploaded 20 Jan 2024View
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSAPERATE BANK ACCOUNT.pdf · uploaded 22 Feb 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate N8 31032024.pdf · uploaded 10 May 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate 31032024.pdf · uploaded 10 May 2024View
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A.pdf · uploaded 24 May 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Atharva Nagari - VIII June 2024.pdf · uploaded 19 Jul 2024View
- Commencement Certificates / NA Order for plotted developmentBLDG PERMIT.pdf · uploaded 9 Dec 2024View
- Copy of Layout Approval (in case of layout)SITE PLAN.pdf · uploaded 9 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentWING A 1 TO 7 9 TO 12 14 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentWING A ELEVATION and SECTION.pdf · uploaded 9 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentWING A 8 and 13 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentWING B 8 14 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentWING A GROUND FLOOR AREA STMT.pdf · uploaded 9 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentWING B GROUND 1 TO 7 9 TO 12 14 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentWING B ELEVATION.pdf · uploaded 9 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentWING F GROUND FLOOR and ELEVATION SECTION PLAN.pdf · uploaded 9 Dec 2024View
- Building Plan Approval / NA Order for plotted developmentWING F 1 TO 14 FLOOR PLAN.pdf · uploaded 9 Dec 2024View
- Commencement Certificates / NA Order for plotted developmentEc atharva 8.pdf · uploaded 9 Jan 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Atharva Nagari VIII_RERA_Form 2 dec 24.pdf · uploaded 9 Jan 2025View
- Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Atharva Nagari VIII_RERA_Form 2A_MAR-24.pdf · uploaded 9 Jan 2025View
- Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 Atharva Nagari- 8.pdf · uploaded 9 Jan 2025View
- Disclosure of sold/ booked inventorysold unsold atharva nagari-8 dec 24.pdf · uploaded 9 Jan 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Atharva Nagar VIII _Dec_2024.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentSITE PLAN_compressed.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentWING A GROUND FLOOR AREA STMT_compressed.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentWING A 8 13 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentWING A 1 TO 7 9 TO 12 14 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentWING A ELEVATION SECTION_compressed.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentWING F GROUND FLOOR ELEVATION SECTION PLAN_compressed.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentWING F 1 TO 14 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentWING B 8 14 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentWING B GROUND 1 TO 7 9 TO 12 14 FLOOR PLAN_compressed.pdf · uploaded 9 Jan 2025View
- Building Plan Approval / NA Order for plotted developmentWING B ELEVATION_compressed.pdf · uploaded 9 Jan 2025View
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samechange of bank name Format A (1).pdf · uploaded 6 Feb 2025View
- Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Change of bank Format B (1).pdf · uploaded 6 Feb 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)Arc certificate 31032025_compressed.pdf · uploaded 23 May 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)Engi certificate 31032025_compressed.pdf · uploaded 23 May 2025View
- Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Annexure A change in bank.pdf · uploaded 19 Jun 2025View
- Other – TechnicalAnnexure A letter head.pdf · uploaded 3 Jul 2025View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)NAGARI VIII ARC 30062025_compressed.pdf · uploaded 19 Jul 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)NAGARI VIII ENGI CER 30062025.pdf · uploaded 19 Jul 2025View
- Form 1Form 1 Archi Certi DECEMBER 2023.pdf · uploaded 25 Feb 2026View
- Form 2Form 2 1 Engineer Certificate DEC 2023.pdf · uploaded 25 Feb 2026View
- Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory.pdf · uploaded 25 Feb 2026View
- Form 1Form 1 Archi Certi MARCH 2024.pdf · uploaded 25 Feb 2026View
- Form 2Form 2 Engineer Certificate MARCH 2024.pdf · uploaded 25 Feb 2026View
- Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory March 2024.pdf · uploaded 25 Feb 2026View
- Form 1Form 1 Archi Certi JUNE 2024.pdf · uploaded 25 Feb 2026View
- Form 2Form 2 Engineer Certificate June 2024.pdf · uploaded 25 Feb 2026View
- Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory.pdf · uploaded 25 Feb 2026View
- Form 1Form 1 Archi Certi MARCH 2025.pdf · uploaded 25 Feb 2026View
- Form 2Form 2 1 Engineer Certificate MARCH 2025.pdf · uploaded 25 Feb 2026View
- Disclosure of Sold and Booked InventoryDisclosure of SOld Inventory March 2025.pdf · uploaded 25 Feb 2026View
- Form 1Form 1 Archi Certi JUNE 2025.pdf · uploaded 26 Feb 2026View
- Form 2Form 2 1 Engineer Certificate JUNE 2025.pdf · uploaded 26 Feb 2026View
- Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory.pdf · uploaded 26 Feb 2026View
- Form 1Form 1 Archi Certi DECEMBER 2024.pdf · uploaded 26 Feb 2026View
- Form 2Form 2 1 Engineer Certificate DEC 2024.pdf · uploaded 26 Feb 2026View
- Disclosure of Sold and Booked InventoryDisclosure of sold and unsold Inventory.pdf · uploaded 26 Feb 2026View
- Form 1Form 1 Archi Certi SEPTEMBER 2025.pdf · uploaded 28 Feb 2026View
- Form 2Form 2 1 Engineer Certificate SEPT 2025.pdf · uploaded 28 Feb 2026View
- Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory.pdf · uploaded 28 Feb 2026View
- Form 1Form 1 Archi Certi Sep 2024.pdf · uploaded 28 Feb 2026View
- Form 2Form 2 Engineer Certificate Sep 2024.pdf · uploaded 28 Feb 2026View
- Disclosure of Sold and Booked InventoryDIsclosure of Sold and Unsold inventory.pdf · uploaded 28 Feb 2026View
- Form 1Form 1 Architect certificate N-8 Dec-25.pdf · uploaded 28 Feb 2026View
- Form 2Form 2 Engineer certificate N-8 Dec-25.pdf · uploaded 28 Feb 2026View
- Disclosure of Sold and Booked InventoryDisclosure of Sold Inventory Dec 2025.pdf · uploaded 28 Feb 2026View
- Form 5 (FY 2023-2024)Form 5 2023-2024.pdf · uploaded 19 Mar 2026View
- Form 5 (FY 2024-2025)Form 5 2024-2025.pdf · uploaded 19 Mar 2026View
- Form 2A (FY 2023-2024)Form 2A March 2024 NAGARI VIII.pdf · uploaded 2 Apr 2026View
- Form 2A (FY 2024-2025)Form 2A March 2025 NAGARI VIII.pdf · uploaded 2 Apr 2026View
- Form 1form1 Atharva NAGARI VIII march 2026.pdf · uploaded 12 May 2026View
- Form 2form 2 Atharva NAGARI VIII march 2026.pdf · uploaded 12 May 2026View
- Disclosure of Sold and Booked InventoryATHARVA NAGARI VIII SOLD UNSOLD march 2026.pdf · uploaded 12 May 2026View
- Withdrawal Update Form 1Atharva Nagari - VIII June 2024.pdf · uploaded 25 Jun 2026View
- Withdrawal Update Form 2Engineers Certificate 31032024.pdf · uploaded 25 Jun 2026View
- Withdrawal Update Form 1ARCHI CERTI NAG-VIII JUNE 2026.pdf · uploaded 25 Jul 2026View
- Withdrawal Update Form 2ENGI CERTI NAG-VIII JUNE 2026.pdf · uploaded 25 Jul 2026View
- Form 2A (FY 2025-2026)Form 2A (2025-26).pdf · uploaded 27 Jul 2026View
Promoter documents
Technical documents
- Layout ApprovalLAY OUT MAP.pdfView
- Layout ApprovalSITE PLAN.pdfView
- Layout Approval1.pdfView
- Layout Approval2.pdfView
- Layout Approval3.pdfView
- Layout Approval4.pdfView
- Layout Approval5.pdfView
- Layout Approval6.pdfView
- Layout Approval7.pdfView
- Layout Approval8.pdfView
- Layout Approval9.pdfView
- Layout Approval10.pdfView
- Layout Approval11.pdfView
- Building Plan ApprovalSITE PLAN 1-8_compressed.pdfView
- Building Plan ApprovalSITE PLAN_compressed.pdfView
- Building Plan ApprovalWING A GROUND FLOOR AREA STMT_compressed.pdfView
- Building Plan ApprovalWING A ELEVATION SECTION_compressed.pdfView
- Building Plan ApprovalWING A 1 TO 7 9 TO 12 14 FLOOR PLAN_compressed.pdfView
- Building Plan ApprovalWING A 8 13 FLOOR PLAN_compressed.pdfView
- Building Plan ApprovalWING B ELEVATION_compressed.pdfView
- Building Plan ApprovalWING B GROUND 1 TO 7 9 TO 12 14 FLOOR PLAN_compressed.pdfView
- Building Plan ApprovalWING B 8 14 FLOOR PLAN_compressed.pdfView
- Building Plan ApprovalWING F 1 TO 14 FLOOR PLAN_compressed.pdfView
- Building Plan ApprovalWING F GROUND FLOOR ELEVATION SECTION PLAN_compressed.pdfView
- Building Plan ApprovalWING A 1 TO 7 9 TO 12 14 FLOOR PLAN.pdfView
- Building Plan ApprovalWING A 8 and 13 FLOOR PLAN.pdfView
- Building Plan ApprovalWING A ELEVATION and SECTION.pdfView
- Building Plan ApprovalWING A GROUND FLOOR AREA STMT.pdfView
- Building Plan ApprovalWING B 8 14 FLOOR PLAN.pdfView
- Building Plan ApprovalWING B ELEVATION.pdfView
- Building Plan ApprovalWING B GROUND 1 TO 7 9 TO 12 14 FLOOR PLAN.pdfView
- Building Plan ApprovalWING F 1 TO 14 FLOOR PLAN.pdfView
- Building Plan ApprovalWING F GROUND FLOOR and ELEVATION SECTION PLAN.pdfView
Other legal documents
- Other – LegalLegal .pdfView
Financial documents
- Other – FinanceFinance Encumbrances.pdf · uploaded 29 Jul 2023View
Commencement certificates and NA orders
- Commencement certificate / NA orderSource
Proforma allotment letter
- Proforma allotment letterAllotement Letter.pdfView
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Pipla, Nagpur (Rural) taluka
Survey, CTS, gat or plot numbers
As published on MahaRERA's project page
123/2 and 123/3
Boundaries
- North
- Khasra Number 152
- South
- Khasara Number 123 by 1
- East
- Khasara Number 123 by 1
- West
- Khasara Number 151
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Rajesh Jaiswal | — |
| Chartered accountant | CA Ram Bonde | — |
| Chartered accountant | Ravindra Lashkare | — |
| Chartered accountant | Sanjay Kamde | — |
| Engineer | Rupesh Porkute | — |
| Other | Shree Shambhu Infrastructure | — |
Source: MahaRERA project page. Contact details are not shown.