Laxmi Narayan Park

Active

Pawangaon, Nagpur 440035 |Promoter: Manoj Laxmikant Itkelwar, Raju Laxmikant Itkelwar

Residential / Group HousingRERAP50500077320
6 Aug 2024Registered with MahaRERA
31 Dec 2029Promised completion
5Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
5
Land area for this project
5,014 sq m (53,972 sq ft)
Permissible built-up area
11,688 sq m (1,25,813 sq ft)
Sanctioned built-up area
11,188 sq m (1,20,431 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
MANOJ LAXMIKANT ITKELWAR, RAJU LAXMIKANT ITKELWAR
Address
KH No. 12/1A, P.H. NO-18 MOUZA-PAWANGAON, Pawangaon, PawangaonPIN 440035
Designated bank account
Icici Bank Limited
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Laxmi Narayan Park is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2029

Registered
6 Aug 2024
Promised
31 Dec 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000773206 Aug 202431 Dec 2029—Manoj Laxmikant Itkelwar, Raju Laxmikant ItkelwarProject page

5 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A3—
Wing B2—
Wing C2—
Wing D2—
Wing E2—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered000013
Wing AOpen Space00000
Wing BClosed/Covered000010
Wing BOpen Space00000
Wing CClosed/Covered000010
Wing COpen Space00000
Wing DClosed/Covered000013
Wing DOpen Space00000
Wing EClosed/Covered000014
Wing EOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A

  • Excavation90%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth40%
  • Stilt Floor30%
  • Slabs of Super Structure30%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing B

  • Excavation90%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor40%
  • Slabs of Super Structure40%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
  • Sanitary Fittings within the flats / premises30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing C

  • Excavation70%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth40%
  • Stilt Floor30%
  • Slabs of Super Structure30%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises20%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing D

  • Excavation90%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth50%
  • Stilt Floor40%
  • Slabs of Super Structure40%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
  • Sanitary Fittings within the flats / premises30%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing E

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAS PER SANCTIONED PLAN0%
  • Water SupplyAS PER SANCTIONED PLAN0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER SANCTIONED PLAN0%
  • Storm Water DrainsAS PER SANCTIONED PLAN0%
  • Landscaping & Tree PlantingAS PER SANCTIONED PLAN0%
  • Street LightingAS PER SANCTIONED PLAN0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER SANCTIONED PLAN0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER SANCTIONED PLAN0%
  • Aggregate area of recreational Open SpaceAS PER SANCTIONED PLAN0%
  • Open ParkingAS PER SANCTIONED PLAN0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

59 documents held by Deedo, 93 filings listed on MahaRERA's project page

Commencement certificates

Encumbrances

Form b

Form 2s

Others

Allotment letters

Form 1s

Title

Registration certificate

Layout plan

Building plans

Document library

  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 10 Jul 2024View
  • Disclosure for secured/unsecured finance availed for the projectDisclosure for securedunsecured finance availed for the project.pdf · uploaded 13 Jul 2024View
  • Proforma of Agreement for saleATS- Laxmi Narayan Park.pdf · uploaded 13 Jul 2024View
  • Proforma of Allotment letter-Allotment_Letter-lAXMI nARAYAN PARK.pdf · uploaded 13 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 LN PARK.pdf · uploaded 13 Jul 2024View
  • Deviation Report with respect to Allotment letterDeviation Report - ALLOTMENT LETTER _Laxmi Narayan Park.pdf · uploaded 13 Jul 2024View
  • Deviation Report with respect to model copy of AgreementATS DEVIATION REPORT -Laxmi naraya park (1).pdf · uploaded 13 Jul 2024View
  • a Details of encumbrances concerned to FinanceENCUM_Finance_LAXMI NARAYAN PARK.pdf · uploaded 13 Jul 2024View
  • a Details of encumbrances concerned to FinanceENCUM_LEGAL_LAXMI NARAYAN PARK.pdf · uploaded 13 Jul 2024View
  • b Details of encumbrances concerned to LegalENCUM_Finance_LAXMI NARAYAN PARK.pdf · uploaded 13 Jul 2024View
  • b Details of encumbrances concerned to LegalENCUM_LEGAL_LAXMI NARAYAN PARK.pdf · uploaded 13 Jul 2024View
  • CERSAI detailsCersai Declaration_LAXMI NARAYAN PARK.pdf · uploaded 13 Jul 2024View
  • Other – TechnicalQuality-Annexure A LAXMI NARAYAN PARK.pdf · uploaded 13 Jul 2024View
  • Declaration in FORM Bilovepdf_merged (26).pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentiNDEX.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development1_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-5.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development2_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-6.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development3_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-9_compressed.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development4_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-10.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development5_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-7_compressed.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development6_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-8.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development7_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-3_compressed.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development8_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-4.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development9_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-1_compressed.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development10_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-2.pdf · uploaded 13 Jul 2024View
  • Building Plan Approval / NA Order for plotted development11_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-11.pdf · uploaded 13 Jul 2024View
  • Copy of Layout Approval (in case of layout)12_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-12.pdf · uploaded 14 Jul 2024View
  • Building Plan Approval / NA Order for plotted development12_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-12.pdf · uploaded 14 Jul 2024View
  • Declaration about Commencement Certificateform d (2)_L N PARK.pdf · uploaded 14 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 Laxmi Narayan Park.pdf · uploaded 14 Jul 2024View
  • Disclosure of Interest in Other Real Estate Organizations1 Disclosure of Interest in Other Real Estate Organizations (14).pdf · uploaded 14 Jul 2024View
  • Disclosure of Interest in Other Real Estate Organizations2 Disclosure of Interest in Other Real Estate Organizations (7).pdf · uploaded 14 Jul 2024View
  • Other – Finance1 Other – Legal (10).pdf · uploaded 15 Jul 2024View
  • Other – Technical1 Copy of the legal title report (49).pdf · uploaded 15 Jul 2024View
  • Copy of the legal title reportTITLE.pdf · uploaded 25 Jul 2024View
  • Other – Technical3 Other – Technical.pdf · uploaded 26 Jul 2024View
  • Other – Technical3 Other – Technical.pdf · uploaded 26 Jul 2024View
  • Other – Legal3 Other – Technical.pdf · uploaded 26 Jul 2024View
  • Other – Finance3 Other – Technical.pdf · uploaded 26 Jul 2024View
  • Other – LegalDeclaration Other Legal.pdf · uploaded 28 Jul 2024View
  • Other – LegalGift Deed.pdf · uploaded 28 Jul 2024View
  • Other – LegalDigital पावनगांव_12-1-अ_Satbara (1).pdf · uploaded 28 Jul 2024View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B) (7).pdf · uploaded 28 Jul 2024View
  • Declaration about all RERA Designated Bank Accounts (Format A)1 Declaration about all RERA Designated Bank Accounts (Format A) (3).pdf · uploaded 28 Jul 2024View
  • Other – TechnicalCC Mail.pdf · uploaded 30 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Laxmi Narayan Park - Form 1 - September 2024.pdf · uploaded 11 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Laxmi Narayan Park - Form 2 - September 2024.pdf · uploaded 11 Feb 2025View
  • Disclosure of sold/ booked inventoryLaxmi Narayan Park - Disclosure - September 2024.pdf · uploaded 11 Feb 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Laxmi Narayan Park - Form 1 - December 2024.pdf · uploaded 11 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Laxmi Narayan Park - Form 2 - December 2024.pdf · uploaded 11 Feb 2025View
  • Disclosure of sold/ booked inventoryLaxmi Narayan Park - Disclosure - December 2024.pdf · uploaded 11 Feb 2025View
  • Form 1Laxmi Narayan Park - Form 1 - September 2024.pdf · uploaded 18 Jun 2025View
  • Form 2Laxmi Narayan Park - Form 2 - September 2024.pdf · uploaded 18 Jun 2025View
  • Disclosure of Sold and Booked InventoryLaxmi Narayan Park - Disclosure - September 2024.pdf · uploaded 18 Jun 2025View
  • Form 1Laxmi Narayan Park - Form 1 - December 2024.pdf · uploaded 18 Jun 2025View
  • Form 2Laxmi Narayan Park - Form 2 - December 2024.pdf · uploaded 18 Jun 2025View
  • Disclosure of Sold and Booked InventoryLaxmi Narayan Park - Disclosure - December 2024.pdf · uploaded 18 Jun 2025View
  • Form 1Laxmi Narayan Park - Form 1 - March 2025.pdf · uploaded 6 Sep 2025View
  • Form 2Laxmi Narayan Park - Form 2 - March 2025.pdf · uploaded 6 Sep 2025View
  • Disclosure of Sold and Booked InventoryLaxmi Narayan Park - Disclosure - March 2025.pdf · uploaded 6 Sep 2025View
  • Withdrawal Update Form 1Laxmi Narayan Park - Form 1 - June 2025.pdf · uploaded 6 Sep 2025View
  • Withdrawal Update Form 2Laxmi Narayan Park - Form 2 - June 2025.pdf · uploaded 6 Sep 2025View
  • Withdrawal Update Form 1FORM - 1 Architect Certificate - Sep 2025.pdf · uploaded 19 Feb 2026View
  • Withdrawal Update Form 2Laxmi Narayan Park - Form 2 - September 2025 (3).pdf · uploaded 19 Feb 2026View
  • Withdrawal Update Form 1FORM - 1 Architect Certificate - Dec 2025 (2).pdf · uploaded 19 Feb 2026View
  • Withdrawal Update Form 2Laxmi Narayan Park - Form 2 - December 2025 (2).pdf · uploaded 19 Feb 2026View
  • Withdrawal Update Form 1Laxmi Narayan Park FORM 1 MARCH 2026.pdf · uploaded 21 May 2026View
  • Withdrawal Update Form 2Laxmi Narayan Park FORM 2 MARCH 2026.pdf · uploaded 21 May 2026View
  • Withdrawal Update Form 1FORM 1 - ARCHITECTS CERTIFICATE - LAXMI NARAYAN PARK - JUNE 2026.pdf · uploaded 10 Aug 2026View
  • Withdrawal Update Form 2FORM 2 - ENGINEER CERTIFICATE - LAXMI NARAYAN PARK - JUNE 2026.pdf · uploaded 10 Aug 2026View

Promoter documents

  • Declaration Form Bilovepdf_merged (26).pdf · uploaded 13 Jul 2024View
  • Legal Title reportTITLE.pdf · uploaded 25 Jul 2024View

Technical documents

  • Building Plan ApprovaliNDEX.pdfView
  • Building Plan Approval1_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-5.pdfView
  • Building Plan Approval2_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-6.pdfView
  • Building Plan Approval3_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-9_compressed.pdfView
  • Building Plan Approval4_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-10.pdfView
  • Building Plan Approval5_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-7_compressed.pdfView
  • Building Plan Approval6_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-8.pdfView
  • Building Plan Approval7_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-3_compressed.pdfView
  • Building Plan Approval8_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-4.pdfView
  • Building Plan Approval9_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-1_compressed.pdfView
  • Building Plan Approval10_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-2.pdfView
  • Building Plan Approval11_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-11.pdfView
  • Layout Approval12_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-12.pdfView
  • Building Plan Approval12_APPROVED PAWANGAON 12-1A ROW HOUSE BUILDING PLANS-12.pdfView

Other legal documents

  • Other – LegalDeclaration Other Legal.pdfView
  • Other – LegalGift Deed.pdfView
  • Other – LegalDigital पावनगांव_12-1-अ_Satbara (1).pdfView
  • Other – Legal3 Other – Technical.pdfView

Financial documents

  • Other – Finance1 Other – Legal (10).pdf · uploaded 15 Jul 2024View
  • Other – Finance3 Other – Technical.pdf · uploaded 26 Jul 2024View

Proforma allotment letter

  • Proforma allotment letter-Allotment_Letter-lAXMI nARAYAN PARK.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pawangaon, Kamptee taluka

Survey, CTS, gat or plot numbers

KH No. 12/1AP.H. NO18 MOUZA PAWANGAON

As published on MahaRERA's project page

KH No. 12/1A, P.H. NO-18 MOUZA-PAWANGAON

Boundaries

North
Khasara No 13-1-2-3
South
Road
East
Road
West
Part Of Khasara No 12-1

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectChandrashekhar Giripunje—
Chartered accountantCa Ankit Talreja—
Chartered accountantRishi Lashkare—
EngineerChandrashekhar Giripunje—
EngineerMahesh Balpande—

Source: MahaRERA project page. Contact details are not shown.