Project type
Residential / Group Housing
Status on MahaRERA
Completed
RERA registrations
2
Phases
2
Buildings
6
Unit types
3 BHK Flat, 3 bHK Flat112 units in all
Land area for this project
6,300 sq m (67,813 sq ft)
Permissible built-up area
6,056 sq m (65,189 sq ft)
Sanctioned built-up area
6,056 sq m (65,189 sq ft)
Recreational open space
3,492 sq m (37,588 sq ft)
Address
Plot No 1 Kh No 59 / 3 Mouza PanjriPIN 441108
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.15934, 72.84269
Shiv Brighton is at latitude 19.15934, longitude 72.84269.

Also registered as

Shiv Brighton Phase IShiv Brighton Phase II

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Jan 2021

P50500006203

The latest completion date on record passed 5 years and 9 months ago.

Registered
14 Aug 2017
Promised
31 Jan 2021

Completion promised for 31 Jan 2021

P50500006295

The latest completion date on record passed 5 years and 9 months ago.

Registered
14 Aug 2017
Promised
31 Jan 2021

2 RERA registrations

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050000620314 Aug 201731 Jan 2021—Om Shivam Buildcon Private LimitedProject page
P5050000629514 Aug 201731 Jan 2021—Om Shivam Buildcon Private LimitedProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Amber828
Coral828
Daimond7—
Mornite828
Ruby7—
Sapphire828

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

112 units registered

3 BHK Flat · 100 units3 bHK Flat · 12 units
RERABuildingTypeCarpet areaUnits
P50500006295Amber3 BHK Flat87.66 sq m · 944 sq ft8
P50500006295Amber3 BHK Flat87.71 sq m · 944 sq ft8
P50500006295Amber3 BHK Flat87.77 sq m · 945 sq ft6
P50500006295Amber3 BHK Flat87.82 sq m · 945 sq ft6
P50500006295Coral3 bHK Flat87.77 sq m · 945 sq ft6
P50500006295Coral3 bHK Flat87.82 sq m · 945 sq ft6
P50500006295Coral3 BHK Flat87.66 sq m · 944 sq ft8
P50500006295Coral3 BHK Flat87.71 sq m · 944 sq ft8
Show all 14 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnits
P50500006295Mornite3 BHK Flat87.69 sq m · 944 sq ft8
P50500006295Mornite3 BHK Flat87.74 sq m · 944 sq ft8
P50500006295Mornite3 BHK Flat87.8 sq m · 945 sq ft6
P50500006295Mornite3 BHK Flat87.85 sq m · 946 sq ft6
P50500006295Sapphire3 BHK Flat87.69 sq m · 944 sq ft16
P50500006295Sapphire3 BHK Flat87.8 sq m · 945 sq ft12

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
AmberClosed/Covered000014
AmberOpen Space00000
CoralClosed/Covered000014
CoralOpen Space00000
DaimondClosed/Covered000021
DaimondOpen Space00000
MorniteClosed/Covered000014
MorniteOpen Space00000
Show all 12 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
RubyClosed/Covered000021
RubyOpen Space00000
SapphireClosed/Covered000014
SapphireOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Amber

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
  • Sanitary Fittings within the flats / premises99%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Coral

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
  • Sanitary Fittings within the flats / premises99%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Daimond

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Show all 7 buildings and common areasShow fewer buildings and common areas

Mornite

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
  • Sanitary Fittings within the flats / premises99%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Ruby

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Sapphire

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
  • Sanitary Fittings within the flats / premises99%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.99%

Common areas and amenities

  • Internal Roads & FootpathsAs per Sanction Map100%
  • Water SupplyAs per Sanction Map100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Sanction Map100%
  • Storm Water DrainsAs per Sanction Map100%
  • Landscaping & Tree PlantingAs per Sanction Map100%
  • Street LightingAs per Sanction Map100%
Show all 30 activitiesShow fewer activities
  • Community BuildingsAs per Sanction Map100%
  • Treatment And Disposal Of Sewage And Sullage WaterAs per Sanction Map100%
  • Solid Waste Management And DisposalAs per Sanction Map100%
  • Water conservation /Rain water harvestingAs per Sanction Map100%
  • Energy managemcntAs per Sanction Map100%
  • Fire protection and fire safety requirementsAs per Sanction Map100%
  • Electrical meter room, sub-station, receiving stationAs per Sanction Map100%
  • Aggregate area of recreational Open SpaceAs per Sanction Map100%
  • Open ParkingNot applicable
  • Internal Roads & FootpathsAs per Sanction Map100%
  • Water SupplyAs per Sanction Map100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Sanction Map100%
  • Storm Water DrainsAs per Sanction Map100%
  • Landscaping & Tree PlantingAs per Sanction Map100%
  • Street LightingAs per Sanction Map100%
  • Community BuildingsAs per Sanction Map100%
  • Treatment And Disposal Of Sewage And Sullage WaterAs per Sanction Map100%
  • Solid Waste Management And DisposalAs per Sanction Map100%
  • Water conservation /Rain water harvestingAs per Sanction Map100%
  • Energy managemcntAs per Sanction map100%
  • Fire protection and fire safety requirementsAs per Sanction Map100%
  • Electrical meter room, sub-station, receiving stationAs per Sanction Map100%
  • Aggregate area of recreational Open SpaceAs per Sanction map100%
  • Open ParkingAs per Sanction map100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

45 documents held by Deedo, 66 filings listed on MahaRERA's project page

Title report (2)

Encumbrance details (2)

  • Encumbrance detailsP50500006203 · 30 Jul 2017ViewSource
  • Encumbrance detailsP50500006295 · 30 Jul 2017ViewSource

Form B (2)

Form 1 (2)

Show all 111 documentsShow fewer documents

Form 2 (2)

Allotment letter (4)

  • Allotment letterP50500006203 · 30 Jul 2017ViewSource
  • Allotment letterP50500006295 · 30 Jul 2017ViewSource
  • Allotment letterP50500006203 · Date not statedViewSource
  • Allotment letterP50500006295 · Date not statedViewSource

Commencement certificate (2)

  • Commencement certificateP50500006203 · 9 Apr 2018ViewSource
  • Commencement certificateP50500006295 · 9 Apr 2018ViewSource

Form 5 (2)

Form 2A

Form 4 (2)

Registration certificate (2)

  • Registration certificateP50500006203 · 18 May 2020ViewSource
  • Registration certificateP50500006295 · 18 May 2020ViewSource

Occupancy / completion certificate (3)

  • Occupancy / completion certificateP50500006203 · 16 Jul 2020ViewSource
  • Occupancy / completion certificateP50500006295 · 16 Jul 2020ViewSource
  • Occupancy / completion certificateP50500006295 · Date not statedViewSource

Other (6)

Layout plan (2)

Building plan (11)

  • Building planP50500006203 · Date not statedViewSource
  • Building planP50500006203 · Date not statedViewSource
  • Building planP50500006295 · Date not statedViewSource
  • Building planP50500006295 · Date not statedViewSource
  • Building planP50500006295 · Date not statedViewSource
  • Building planP50500006295 · Date not statedViewSource
  • Building planP50500006295 · Date not statedViewSource
  • Building planP50500006295 · Date not statedViewSource
  • Building planP50500006203 · Date not statedViewSource
  • Building planP50500006203 · Date not statedViewSource
  • Building planP50500006295 · Date not statedViewSource

Document library

  • Copy of the legal title reportP50500006203 · TITAL REPORT PHASE I (SHIV BRIGHTON ).pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesP50500006203 · PHASE I ENCUMBRANCE CERTIFICATE (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)P50500006203 · PHASE-I RUBY and DIAMOND PLAN 1 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Declaration in FORM BP50500006203 · PHASE I FORM B (AFFIDAVITE).pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500006203 · ARCHITECT CERTIFICAT SHIV BRIGHTON PHASE - I.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterP50500006203 · PHASE-I ALLOTMENT LETTER (SHIV BBRIGHTON).pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterP50500006203 · AGGRIMENT TO SELL BRIGHTON PHASE I BRIGHTON.pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006203 · PHASE-I RUBY and DIAMOND PLAN 1 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006203 · PHASE-I RUBY and DIAMOND PLAN 2 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006203 · PHASE-I RUBY and DIAMOND PLAN 3 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006203 · PHASE-I RUBY and DIAMOND PLAN 4 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500006203 · PHASE I ENGINEER CERTIFICATE (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006203 · PHASE-I RUBY and DIAMOND PLAN 5 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • OtherP50500006203 · DECLERATION (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Copy of the legal title reportP50500006295 · PHASE-II TITAL REPORT (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesP50500006295 · PHASE II ENCUMBRANCE CERTIFICATE (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Copy of Layout Approval (in case of layout)P50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 1 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Declaration in FORM BP50500006295 · FORM B (AFFIDAVITE).pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P50500006295 · ARCHITECT CERTIFICAT SHIV BRIGHTON PHASE - II.pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterP50500006295 · PHASE II ALLOTMENT LETTER (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Proforma of Allotment letterP50500006295 · PHASE II AGGRIMENT TO SELL (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 1 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 2 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 3 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 4 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P50500006295 · PHASE II ENGINEER CERTIFICATE (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 5 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 6 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 7 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)P50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 8 (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • OtherP50500006295 · DECLERATION (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentP50500006203 · PHASE-I COMMENCEMENT CERTIFICATE (SHIV BRIGHTON).pdf · uploaded 9 Apr 2018View
  • Commencement Certificates / NA Order for plotted developmentP50500006295 · PHASE II COMMENCEMENT CERTIFICATE (SHIV BRIGHTON).pdf · uploaded 9 Apr 2018View
  • Certificates of CA (Form 5)P50500006203 · Shiv Brighton Phase I.pdf · uploaded 29 Sep 2018View
  • Certificates of CA (Form 5)P50500006295 · Shiv Brighton Phase II.pdf · uploaded 29 Sep 2018View
  • Form 2AP50500006295 · QUALITY CERTIFICATE SHIV BRIGHTON PH-II.pdf · uploaded 16 Jul 2019View
  • OtherP50500006295 · OC BRIGHTON PHASE II.pdf · uploaded 24 Jan 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500006295 · OC BRIGHTON PHASE II.pdf · uploaded 24 Jan 2020View
  • Architect’s Certificate on Completion of Project (Form 4)P50500006295 · FORM NO 4 SHIV BRIGHTON PH-II.pdf · uploaded 31 Jan 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500006203 · OC Shiv Brighton Phase I.pdf · uploaded 16 Jul 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50500006295 · OC Shiv Brighton Phase II.pdf · uploaded 16 Jul 2020View
  • Architect’s Certificate on Completion of Project (Form 4)P50500006203 · FORM NO 4 SHIV BRIGHTON PH-I .pdf · uploaded 23 Jul 2020View

Promoter documents

  • Legal Title reportP50500006203 · TITAL REPORT PHASE I (SHIV BRIGHTON ).pdf · uploaded 30 Jul 2017View
  • Declaration Form BP50500006203 · PHASE I FORM B (AFFIDAVITE).pdf · uploaded 30 Jul 2017View
  • Legal Title reportP50500006295 · PHASE-II TITAL REPORT (SHIV BRIGHTON).pdf · uploaded 30 Jul 2017View
  • Declaration Form BP50500006295 · FORM B (AFFIDAVITE).pdf · uploaded 30 Jul 2017View

Technical documents

  • Layout ApprovalP50500006203 · PHASE-I RUBY and DIAMOND PLAN 1 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006203 · PHASE-I RUBY and DIAMOND PLAN 1 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006203 · PHASE-I RUBY and DIAMOND PLAN 2 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006203 · PHASE-I RUBY and DIAMOND PLAN 3 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006203 · PHASE-I RUBY and DIAMOND PLAN 4 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006203 · PHASE-I RUBY and DIAMOND PLAN 5 (SHIV BRIGHTON).pdfView
  • Layout ApprovalP50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 1 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 1 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 2 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 3 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 4 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 5 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 6 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 7 (SHIV BRIGHTON).pdfView
  • Building Plan ApprovalP50500006295 · PHASE-II SAFFIRE, MORGNITE, AMBER, CORAL PLAN 8 (SHIV BRIGHTON).pdfView

Other legal documents

  • OtherP50500006203 · DECLERATION (SHIV BRIGHTON).pdfView
  • OtherP50500006295 · DECLERATION (SHIV BRIGHTON).pdfView
  • OtherP50500006295 · OC BRIGHTON PHASE II.pdfView

Proforma allotment letter

  • Proforma allotment letterP50500006203 · PHASE-I ALLOTMENT LETTER (SHIV BBRIGHTON).pdfView
  • Proforma allotment letterP50500006295 · PHASE II ALLOTMENT LETTER (SHIV BRIGHTON).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Panjari farm, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

Plot No 1 Kh No 59 / 3 Mouza PanjriPlot No5921 Mouza Panjri BZ

As published on MahaRERA's project page

Plot No 1 Kh No 59 / 3 Mouza Panjri

Boundaries

North
Approach Road and Plot 19 and 21
South
Other Kh
East
Vasundhara Phase II
West
Other Kh

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectEkveera Architects—P50500006203
ArchitectEkVeera Architects—P50500006295
EngineerMr. P.S. Patankar—P50500006203
EngineerMr. P.S. Patankar—P50500006295