Nagpur (M Corp.), Nagpur 440030 |Promoter: Vardan Buildcon

Residential / Group HousingRERAP50500015398
21 Feb 2018Registered with MahaRERA
30 Oct 2021Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
458 sq m (4,930 sq ft)
Permissible built-up area
689 sq m (7,416 sq ft)
Sanctioned built-up area
589 sq m (6,340 sq ft)
Address
Plot No 175a, Cts No 247, Kh No 141, 143144, 146, 148/4PIN 440030
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.52960, 73.87602
Prerna Elite is at latitude 18.52960, longitude 73.87602.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Oct 2021

The latest completion date on record passed 5 years ago.

Registered
21 Feb 2018
Promised
30 Oct 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001539821 Feb 201830 Oct 2021—Vardan BuildconProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Prerna Elite8—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Prerna Elite

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyTHROUGH AVAILABLE SOURCE AFTER POSSESION100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)CHAMBERS CONNECTED TO MUNCIPAL SEWER LINE100%
  • Storm Water DrainsCHAMBER TO MUNCIPAL STORM WATER LINE100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAFTER COMPLETION100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS PER RECOMMENDATION PLAN100%
  • Electrical meter room, sub-station, receiving stationMETERING PANEL100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

3 documents held by Deedo, 34 filings listed on MahaRERA's project page

Form 1s

Registration certificate

Document library

  • Commencement Certificates / NA Order for plotted developmentBuilding Permit Letter dtd 31102017 NIT.pdf · uploaded 2 Nov 2017Source
  • Building Plan Approval (IOD)Final Nit Sanction Map Sheet No 1 PDF.pdf · uploaded 2 Nov 2017Source
  • Declaration in FORM BFrom B' Affidevid11142017.pdf · uploaded 6 Feb 2018Source
  • Details of encumbrancesEncumbrance Certificate.pdf · uploaded 12 Feb 2018Source
  • Proforma of Allotment letterAllotment Letter Draft 09022018.pdf · uploaded 12 Feb 2018Source
  • Copy of Layout Approval (in case of layout)Certificate02122018.pdf · uploaded 12 Feb 2018Source
  • Building Plan Approval (IOD)Final Nit Sanction Map Sheet No 2 PDF.pdf · uploaded 12 Feb 2018Source
  • Copy of the legal title reportVerification_and_encmubrance_Report.pdf · uploaded 13 Feb 2018Source
  • Certificates of CA (Form 5)Vardan Buildcon Form 5 30042018 (2).pdf · uploaded 23 Nov 2018Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Audit Report.pdf · uploaded 10 Dec 2019Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architecture Certificate april 2019 _000044.pdf · uploaded 2 May 2020Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER Vardan- Apr-19.pdf · uploaded 2 May 2020Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architecture Certificate Jully 2019 _000045.pdf · uploaded 2 May 2020Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER Vardan- July-19.pdf · uploaded 2 May 2020Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architecture Certificate q2.pdf · uploaded 2 May 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architecture Certificate q2.pdf · uploaded 2 May 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER Vardan- Oct-19.pdf · uploaded 2 May 2020Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architecture Certificate q3.pdf · uploaded 2 May 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER Vardan- Oct-19.pdf · uploaded 2 May 2020Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Vardan- Jan-20.pdf · uploaded 2 May 2020Source
  • Declaration about Commencement CertificateCommencment Certificate - Prerna Elite.pdf · uploaded 14 Aug 2021Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 elite march 20.pdf · uploaded 14 Aug 2021Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 20 elite.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A elite.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A elite.pdf · uploaded 14 Aug 2021Source
  • Architect’s Certificate on Completion of Project (Form 4)form 4 elite.pdf · uploaded 14 Aug 2021Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFinal Occupancy Certificate.pdf · uploaded 14 Aug 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 05.pdf · uploaded 23 Jan 2023Source

Promoter documents

  • Declaration Form BFrom B' Affidevid11142017.pdf · uploaded 6 Feb 2018Source
  • Legal Title reportVerification_and_encmubrance_Report.pdf · uploaded 13 Feb 2018Source

Technical documents

  • Building Plan ApprovalFinal Nit Sanction Map Sheet No 1 PDF.pdfSource
  • Layout ApprovalCertificate02122018.pdfSource
  • Building Plan ApprovalFinal Nit Sanction Map Sheet No 2 PDF.pdfSource

Proforma allotment letter

  • Proforma allotment letterAllotment Letter Draft 09022018.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nagpur (M Corp.), Nagpur (Urban) taluka

Survey, CTS, gat or plot numbers

143144146148/4CTS NO 247KH NO 141PLOT NO 175A

As published on MahaRERA's project page

PLOT NO 175A, CTS NO 247, KH NO 141,143144,146,148/4

Boundaries

North
Plot No 175 B
South
9 Meter Wide Road
East
12 Meter Wide Road
West
Open Land And Kh No 138

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectEmanate Design—
Chartered accountantAgrawal Saraf & associates—
EngineerNlilesh mahajan—
EngineerP S Patankar & Associates—
OtherShri Taj Construction—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology