BLD_009124Completed15 floors

Symphony-1 and 2 · First City Project, Phase-1A

Khapri · RERA P50500010398

15Sanctioned habitable floorsregistration certificate
30 Dec 2022Promised completion

Floors

15 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50500010398 · registered 24 Aug 2017
Promised completion
30 Dec 2022
Sanctioned habitable floors
15

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
1BHK62.7 m² (675 sq.ft)32not published
2.5BHK109.6 m² (1,180 sq.ft)8not published
2BHK82.7 m² (890 sq.ft)20not published
2BHK82.9 m² (892 sq.ft)22not published
2BHK83.5 m² (898 sq.ft)42not published
2BHK84.4 m² (909 sq.ft)20not published
2BHK84.7 m² (912 sq.ft)22not published
2BHK85.4 m² (919 sq.ft)42not published
2BHK85.6 m² (921 sq.ft)52not published
2BHK85.9 m² (925 sq.ft)20not published
2BHK88.5 m² (953 sq.ft)22not published
3BHK114.6 m² (1,234 sq.ft)20not published
3BHK114.9 m² (1,237 sq.ft)22not published
3BHKDUP149 m² (1,604 sq.ft)2not published
3BHKDUP150 m² (1,615 sq.ft)2not published
3BHKDUP152.4 m² (1,640 sq.ft)2not published
3BHKDUP153.9 m² (1,656 sq.ft)2not published
3BHKDUP154 m² (1,658 sq.ft)4not published
3BHKDUP155.4 m² (1,673 sq.ft)2not published
4BHK157 m² (1,690 sq.ft)4not published
4BHK157.5 m² (1,695 sq.ft)4not published
4BHK159 m² (1,711 sq.ft)8not published
4BHKDUP214.1 m² (2,305 sq.ft)2not published
5BHK184.5 m² (1,986 sq.ft)4not published
5BHK186.3 m² (2,005 sq.ft)4not published
Total384

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered000267
Open Space000117

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology