BLD_009124Completed15 floors
Symphony-1 and 2 · First City Project, Phase-1A
Khapri · RERA P50500010398
15Sanctioned habitable floorsregistration certificate
30 Dec 2022Promised completion
Floors
15 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 15
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 62.7 m² (675 sq.ft) | 32 | not published |
| 2.5BHK | 109.6 m² (1,180 sq.ft) | 8 | not published |
| 2BHK | 82.7 m² (890 sq.ft) | 20 | not published |
| 2BHK | 82.9 m² (892 sq.ft) | 22 | not published |
| 2BHK | 83.5 m² (898 sq.ft) | 42 | not published |
| 2BHK | 84.4 m² (909 sq.ft) | 20 | not published |
| 2BHK | 84.7 m² (912 sq.ft) | 22 | not published |
| 2BHK | 85.4 m² (919 sq.ft) | 42 | not published |
| 2BHK | 85.6 m² (921 sq.ft) | 52 | not published |
| 2BHK | 85.9 m² (925 sq.ft) | 20 | not published |
| 2BHK | 88.5 m² (953 sq.ft) | 22 | not published |
| 3BHK | 114.6 m² (1,234 sq.ft) | 20 | not published |
| 3BHK | 114.9 m² (1,237 sq.ft) | 22 | not published |
| 3BHKDUP | 149 m² (1,604 sq.ft) | 2 | not published |
| 3BHKDUP | 150 m² (1,615 sq.ft) | 2 | not published |
| 3BHKDUP | 152.4 m² (1,640 sq.ft) | 2 | not published |
| 3BHKDUP | 153.9 m² (1,656 sq.ft) | 2 | not published |
| 3BHKDUP | 154 m² (1,658 sq.ft) | 4 | not published |
| 3BHKDUP | 155.4 m² (1,673 sq.ft) | 2 | not published |
| 4BHK | 157 m² (1,690 sq.ft) | 4 | not published |
| 4BHK | 157.5 m² (1,695 sq.ft) | 4 | not published |
| 4BHK | 159 m² (1,711 sq.ft) | 8 | not published |
| 4BHKDUP | 214.1 m² (2,305 sq.ft) | 2 | not published |
| 5BHK | 184.5 m² (1,986 sq.ft) | 4 | not published |
| 5BHK | 186.3 m² (2,005 sq.ft) | 4 | not published |
| Total | 384 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 267 |
| Open Space | 0 | 0 | 0 | 117 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)100%
- Plinth100%
- Stilt Floor100%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises100%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology