First City Project, Phase-1A

Completed

Khapri, Nagpur 441108 |Promoter: Nagpur Integrated Township Private Limited

24 Aug 2017Registered with MahaRERA
30 Dec 2022Promised completion
2Buildings
568Units registered
13MahaRERA listings and orders

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
2
Unit types
1BHK, 2.5BHK, 2BHK, 3BHK, 3BHKDUP, 4BHK, 4BHKDUP, 5BHK568 units in all
Land area for this project
50,349 sq m (5,41,952 sq ft)
Permissible built-up area
2,45,113 sq m (26,38,372 sq ft)
Sanctioned built-up area
65,522 sq m (7,05,272 sq ft)
Recreational open space
10,919 sq m (1,17,531 sq ft)
Address
Gat Nos 12, 20(Part), 21(Part), 22(Part), Plot No.2, Sector 21, MIHAN, NON-SEZ AREAPIN 441108
Designated bank account
Standard Chartered Bank
Litigation declared by promoter
Yes
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.04548, 79.03971
First City Project, Phase-1A is at latitude 21.04548, longitude 79.03971.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
24 Aug 2017
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5050001039824 Aug 201730 Dec 2022—Nagpur Integrated Township Private LimitedProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Symphony-1 and 215384
Symphony-315184

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

568 units registered

1BHK · 48 units2.5BHK · 10 units2BHK · 393 units3BHK · 63 units3BHKDUP · 21 units4BHK · 20 units4BHKDUP · 3 units5BHK · 10 units
BuildingTypeCarpet areaUnits
Symphony-1 and 21BHK62.7 sq m · 675 sq ft32
Symphony-1 and 22.5BHK109.62 sq m · 1,180 sq ft8
Symphony-1 and 22BHK82.68 sq m · 890 sq ft20
Symphony-1 and 22BHK82.87 sq m · 892 sq ft22
Symphony-1 and 22BHK83.47 sq m · 898 sq ft42
Symphony-1 and 22BHK84.44 sq m · 909 sq ft20
Symphony-1 and 22BHK84.73 sq m · 912 sq ft22
Symphony-1 and 22BHK85.38 sq m · 919 sq ft42
Symphony-1 and 22BHK85.61 sq m · 921 sq ft52
Symphony-1 and 22BHK85.93 sq m · 925 sq ft20
Symphony-1 and 22BHK88.54 sq m · 953 sq ft22
Symphony-1 and 23BHK114.64 sq m · 1,234 sq ft20
Symphony-1 and 23BHK114.92 sq m · 1,237 sq ft22
Symphony-1 and 23BHKDUP149.01 sq m · 1,604 sq ft2
Symphony-1 and 23BHKDUP150.03 sq m · 1,615 sq ft2
Symphony-1 and 23BHKDUP152.36 sq m · 1,640 sq ft2
Symphony-1 and 23BHKDUP153.85 sq m · 1,656 sq ft2
Symphony-1 and 23BHKDUP154.03 sq m · 1,658 sq ft4
Symphony-1 and 23BHKDUP155.42 sq m · 1,673 sq ft2
Symphony-1 and 24BHK157 sq m · 1,690 sq ft4
Symphony-1 and 24BHK157.47 sq m · 1,695 sq ft4
Symphony-1 and 24BHK158.96 sq m · 1,711 sq ft8
Symphony-1 and 24BHKDUP214.14 sq m · 2,305 sq ft2
Symphony-1 and 25BHK184.5 sq m · 1,986 sq ft4
Symphony-1 and 25BHK186.27 sq m · 2,005 sq ft4
Symphony-31BHK62.7 sq m · 675 sq ft16
Symphony-32.5BHK109.62 sq m · 1,180 sq ft2
Symphony-32BHK82.68 sq m · 890 sq ft10
Symphony-32BHK82.87 sq m · 892 sq ft11
Symphony-32BHK83.47 sq m · 898 sq ft21
Symphony-32BHK84.45 sq m · 909 sq ft10
Symphony-32BHK84.72 sq m · 912 sq ft11
Symphony-32BHK85.38 sq m · 919 sq ft21
Symphony-32BHK85.61 sq m · 921 sq ft26
Symphony-32BHK85.93 sq m · 925 sq ft10
Symphony-32BHK88.54 sq m · 953 sq ft11
Symphony-33BHK114.64 sq m · 1,234 sq ft10
Symphony-33BHK114.92 sq m · 1,237 sq ft11
Symphony-33BHKDUP149.01 sq m · 1,604 sq ft1
Symphony-33BHKDUP150.04 sq m · 1,615 sq ft1
Symphony-33BHKDUP152.36 sq m · 1,640 sq ft1
Symphony-33BHKDUP153.85 sq m · 1,656 sq ft1
Symphony-33BHKDUP154.03 sq m · 1,658 sq ft2
Symphony-33BHKDUP155.42 sq m · 1,673 sq ft1
Symphony-34BHK157 sq m · 1,690 sq ft1
Symphony-34BHK157.47 sq m · 1,695 sq ft1
Symphony-34BHK158.96 sq m · 1,711 sq ft2
Symphony-34BHKDUP214.14 sq m · 2,305 sq ft1
Symphony-35BHK184.5 sq m · 1,986 sq ft1
Symphony-35BHK186.27 sq m · 2,005 sq ft1

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Symphony-1 and 2Closed/Covered0000267
Symphony-1 and 2Open Space0000117
Symphony-3Closed/Covered0000126
Symphony-3Open Space000058

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Symphony-1 and 2

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Symphony-3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsCompleted100%
  • Water SupplyCompleted100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)No Septic Tank & STP100%
  • Storm Water DrainsCompleted100%
  • Landscaping & Tree PlantingCompleted100%
  • Street LightingCompleted100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterConnected to MADC Central STP0%
  • Solid Waste Management And DisposalCompleted100%
  • Water conservation /Rain water harvestingCompleted100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCompleted100%
  • Electrical meter room, sub-station, receiving stationCompleted100%
  • Aggregate area of recreational Open SpaceShall be provided on approval0%
  • Open ParkingDisclosure enclosed100%
  • Club houseThis is a clubhouse amenity for entire layout100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

54 documents held by Deedo, 113 filings listed on MahaRERA's project page

Commencement certificate

Form b

Form 4s

Form 1s

Form 2s

Others

Registration certificate

Form 2as

Form 5

Title

Layout plans

Building plans

Document library

  • Copy of Layout Approval (in case of layout)FCP Layout approval 24112010.pdf · uploaded 29 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentFCP Commencement Certificate-24112010.pdf · uploaded 29 Jul 2017View
  • Building Plan Approval (IOD)05-Building Plan.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)08-Building Plan.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)09-Building Plan.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)Disclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesDisclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentDisclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • Copy of the legal title reportDisclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Disclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Disclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • Certificates of CA (Form 5)Disclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterDisclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)Disclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • OtherSA-Part1.pdf · uploaded 31 Jul 2017View
  • OtherSA-Part2.pdf · uploaded 31 Jul 2017View
  • OtherSA-Part3.pdf · uploaded 31 Jul 2017View
  • OtherSA-Part4.pdf · uploaded 31 Jul 2017View
  • OtherSA-Part5.pdf · uploaded 31 Jul 2017View
  • OtherSA-Part6.pdf · uploaded 31 Jul 2017View
  • OtherSA-Part7.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BDisclosure FCP for Form-B.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterAGREEMENT FOR LEASE FCP-Phase1A.pdf · uploaded 21 Feb 2018Source
  • OtherRegistered NDA - 31 Acres-Part1.pdf · uploaded 9 Apr 2018View
  • OtherRegistered NDA - 31 Acres-Part2.pdf · uploaded 9 Apr 2018View
  • OtherRegistered NDA - 31 Acres-Part3.pdf · uploaded 9 Apr 2018View
  • OtherRegistered POA - 31 Acres.pdf · uploaded 9 Apr 2018View
  • Commencement Certificates / NA Order for plotted developmentRevalidation dtd 27Mar18.pdf · uploaded 9 Apr 2018View
  • Building Plan Approval (IOD)Revalidation dtd 27Mar18.pdf · uploaded 9 Apr 2018View
  • Proforma of Allotment letter23-02-2018Draft AGREEMENT FOR LEASE-FCP Phase1A.pdf · uploaded 13 Jun 2018Source
  • OtherAAI Approvals -First City Project-1.pdf · uploaded 13 Jun 2018View
  • Proforma of Allotment letterDraft of AGREEMENT FOR LEASE FCP-Phase1A.pdf · uploaded 22 Aug 2018Source
  • Proforma of Allotment letterDraft Agreement for Lease FCP-S1 and S2.pdf · uploaded 29 Jan 2019Source
  • Proforma of Allotment letterDraft Agreement for Lease FCP-S3.pdf · uploaded 29 Jan 2019Source
  • Proforma of Allotment letterAllotment Letter for Old Bookings.pdf · uploaded 29 Jan 2019Source
  • Proforma of Allotment letterAllotment Letter for New Bookings.pdf · uploaded 29 Jan 2019Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy certificate S1 S2 Clubhouse.pdf · uploaded 26 Dec 2019Source
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 (Architect Certificate) Completion Certificate.pdf · uploaded 26 Dec 2019View
  • Copy of Layout Approval (in case of layout)Site Layout of Phase-1A.pdf · uploaded 12 Feb 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Sym2 12 and 13 MPH.pdf · uploaded 27 Apr 2020Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Dec2019.pdf · uploaded 22 Jul 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Mar2020_compressed.pdf · uploaded 22 Jul 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Jun2020_compressed.pdf · uploaded 22 Jul 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Sep2020_compressed.pdf · uploaded 22 Jul 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Dec2020_compressed.pdf · uploaded 22 Jul 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Dec2020_compressed.pdf · uploaded 22 Jul 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Mar2021_compressed.pdf · uploaded 22 Jul 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form1 Jun2021_compressed.pdf · uploaded 22 Jul 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Mar2021_compressed (1).pdf · uploaded 22 Jul 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Dec20_compressed.pdf · uploaded 22 Jul 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)NITPL_RERA Form 5-2019-20_31-03-2020.pdf · uploaded 31 Jul 2021Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form-2 ENGINEER'S CERTIFICATE Jun21.pdf · uploaded 31 Jul 2021View
  • Disclosure of sold/ booked inventoryDisclosure of Sold and Unsold 31032021 Building1.pdf · uploaded 5 Aug 2021View
  • Disclosure of sold/ booked inventoryDisclosure of Sold and Unsold 31032021 Building2.pdf · uploaded 5 Aug 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 Architect Certificate_Sep21_compressed.pdf · uploaded 12 Oct 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)RERA Form 1 Architect Certificate_Sep21_compressed.pdf · uploaded 12 Oct 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RERA Form 2 Engineer Certificate_Sep21_compressed.pdf · uploaded 12 Oct 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 Statutory Auditor Certificate 31-03-2021.pdf · uploaded 12 Oct 2021Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1_NITPL Architech Certificate.pdf · uploaded 21 Jan 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2_Engineer's Certificate_Dec21.pdf · uploaded 29 Jan 2022View
  • Disclosure of sold/ booked inventoryDisclosure of Sold and Unsold S1 and S2.pdf · uploaded 11 Feb 2022View
  • Disclosure of sold/ booked inventoryDisclosure of Sold and Unsold S3.pdf · uploaded 11 Feb 2022View
  • Disclosure of sold/ booked inventoryDisclosure of Sold and Booked S1 and S2 Dec21.pdf · uploaded 22 Mar 2022View
  • Disclosure of sold/ booked inventoryDisclosure of Sold and Booked S3 Dec21.pdf · uploaded 22 Mar 2022View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)MAHARERA Form-1 - Architect Certificate NITPL Ph1A Mar'22.pdf · uploaded 15 Apr 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)MAHARERA Fomr-2 -Engineers Certificate NITPL Ph1A Mar'22.pdf · uploaded 15 Apr 2022View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate - Symphony 3.pdf · uploaded 13 May 2022Source
  • Disclosure of sold/ booked inventoryDisclosure of sold - unsold-Mar22-1_Ph1A.pdf · uploaded 20 Jul 2022Source
  • Disclosure of sold/ booked inventoryDisclosure of sold - unsold-Jun22-1_Ph1A.pdf · uploaded 20 Jul 2022Source
  • Disclosure of sold/ booked inventorySep22 .pdf · uploaded 17 Oct 2022Source
  • Architect’s Certificate on Completion of Project (Form 4)Form-4 with OCs.pdf · uploaded 17 Oct 2022View
  • Architect’s Certificate on Completion of Project (Form 4)Form4-with Symphony OC RevC.pdf · uploaded 21 Oct 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 First Phase 1A_31032022 - Signed.pdf · uploaded 31 Oct 2022Source
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A Disclosure and Self Declaration by Directors.pdf · uploaded 19 Apr 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form2a-Ph1a-2021-22.pdf · uploaded 20 Apr 2023View
  • Disclosure of sold/ booked inventoryDec22.pdf · uploaded 27 Apr 2023Source
  • Disclosure of sold/ booked inventoryMar23.pdf · uploaded 27 Apr 2023Source
  • Status of Formation of Legal Entity (Society/Co Op etc.)Certificate of Co-Operative Registration - Ph1a.pdf · uploaded 23 May 2023View
  • Disclosure of sold/ booked inventoryQEJun23_Ph1A.pdf · uploaded 20 Jul 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form2a-Ph1a-2022-23.pdf · uploaded 20 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form-5(Symphony)-signed-r.pdf · uploaded 21 Jul 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form5_202223_CS1.pdf · uploaded 24 Jul 2023Source
  • Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Sep23-1.pdf · uploaded 16 Oct 2023Source
  • Disclosure of sold/ booked inventoryDisclosure of Sold Unsold Sep23-2.pdf · uploaded 16 Oct 2023Source
  • Disclosure of sold/ booked inventoryDisclosure_Sold and Unsold_Symphony_Dec23.pdf · uploaded 22 Jan 2024Source
  • Disclosure of sold/ booked inventoryDisclosure of Inventory_Harmony1and6_Mar24.pdf · uploaded 20 Apr 2024Source
  • Disclosure of sold/ booked inventoryDisclosure of Inventory_Symphony_Mar24.pdf · uploaded 20 Apr 2024Source
  • Disclosure of sold/ booked inventoryDisclosure of Inventory_Symphony_Jun24.pdf · uploaded 22 Jul 2024Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Annexure C - Form-2A - QA Certi - Symphony.pdf · uploaded 22 Jul 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form-5_2023-24_Symphony.pdf · uploaded 24 Oct 2024View

Promoter documents

  • Legal Title reportDisclosure-310717-(Final).pdf · uploaded 31 Jul 2017View
  • Declaration Form BDisclosure FCP for Form-B.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalSite Layout of Phase-1A.pdfView
  • Layout ApprovalFCP Layout approval 24112010.pdfView
  • Building Plan Approval05-Building Plan.pdfView
  • Building Plan Approval08-Building Plan.pdfView
  • Building Plan Approval09-Building Plan.pdfView
  • Layout ApprovalDisclosure-310717-(Final).pdfView
  • Building Plan ApprovalDisclosure-310717-(Final).pdfView
  • Building Plan ApprovalRevalidation dtd 27Mar18.pdfView

Other legal documents

  • OtherRegistered NDA - 31 Acres-Part1.pdfView
  • OtherRegistered NDA - 31 Acres-Part2.pdfView
  • OtherRegistered NDA - 31 Acres-Part3.pdfView
  • OtherRegistered POA - 31 Acres.pdfView
  • OtherAAI Approvals -First City Project-1.pdfView
  • OtherSA-Part1.pdfView
  • OtherSA-Part2.pdfView
  • OtherSA-Part3.pdfView
  • OtherSA-Part4.pdfView
  • OtherSA-Part5.pdfView
  • OtherSA-Part6.pdfView
  • OtherSA-Part7.pdfView

Proforma allotment letter

  • Proforma allotment letterDraft of AGREEMENT FOR LEASE FCP-Phase1A.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Khapri, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

20(Part)21(Part)22(Part)Gat Nos 12

As published on MahaRERA's project page

Gat Nos 12, 20(Part), 21(Part), 22(Part)

Boundaries

North
Two Lane road or Commercial Area
South
Two Lane Road or International School
East
Residential Area
West
Four Lane Road or SEZ Boundary Wall

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMahesh Khanolkar—
Chartered accountantRamasamy Koteswara Rao And Co LLP—
EngineerTanmay Raje—
OtherIJM India Infrastructure Limited—
Real Estate AgentSachin Sumatkumar Jejani—
Registered real estate agentSachinSumatkumar JejaniA50500000850

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Methodology