Metro City 3

Lapsed

Gotal Panjari, Nagpur 441108 |Promoter: Alliance Infrastructure

8 Jul 2019Registered with MahaRERA
28 Feb 2025Promised completion
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Lapsed
Land area for this project
5,233 sq m (56,332 sq ft)
Permissible built-up area
9,209 sq m (99,127 sq ft)
Sanctioned built-up area
9,209 sq m (99,127 sq ft)
Recreational open space
1,047 sq m (11,266 sq ft)
Address
Survey No. 25, Gotal Panjri Patwari Halka No 38, Gram panchayat of Gotal PanjriPIN 441108
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 28 Feb 2025

The latest completion date on record passed 1 year and 8 months ago.

Registered
8 Jul 2019
Promised
28 Feb 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000215578 Jul 201928 Feb 2025—Alliance InfrastructureProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & FootpathsAs Per Norms100%
  • Water SupplyCOMPLETED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)PARTLY COMPLETED97%
  • Storm Water DrainsCOMPLETED100%
  • Landscaping & Tree PlantingCOMPLETED100%
  • Street LightingPARTLY COMPLETED90%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 24 filings listed on MahaRERA's project page

Title

Registration certificate

Form 5

Form 2s

Others

Form 1

Allotment letter

Document library

  • Copy of the legal title reportTitle Report.pdf · uploaded 6 May 2019View
  • Details of encumbrancesencumbrance Certificate.pdf · uploaded 6 May 2019Source
  • Proforma of Allotment letterSale deed Format.pdf · uploaded 6 May 2019View
  • Copy of Layout Approval (in case of layout)map.pdf · uploaded 6 May 2019Source
  • Building Plan Approval (IOD)K- PRAT.pdf · uploaded 6 May 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect certificate.pdf · uploaded 6 May 2019Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 6 May 2019Source
  • Commencement Certificates / NA Order for plotted developmentCommencement certificate_.pdf · uploaded 4 Jul 2019Source
  • Declaration in FORM BFormn B_.pdf · uploaded 4 Jul 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECH CERTIFICATE.pdf · uploaded 25 Sep 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5.pdf · uploaded 25 Sep 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Metro City 3 sep .pdf · uploaded 24 Nov 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate Metro City 3 Sep 23.pdf · uploaded 24 Nov 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)M-3 AC DEC-23.pdf · uploaded 27 Jan 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)M-3 EN DEC-23.pdf · uploaded 27 Jan 2024View
  • Disclosure of sold/ booked inventoryDecember disclosure of sold inventory.pdf · uploaded 22 Feb 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)M3A_rotated.pdf · uploaded 20 Feb 2025View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)M3E_rotated.pdf · uploaded 20 Feb 2025View
  • Disclosure of sold/ booked inventorydisclosure of sold inventory.pdf · uploaded 21 Feb 2025View

Promoter documents

  • Legal Title reportTitle Report.pdf · uploaded 6 May 2019View
  • Declaration Form BFormn B_.pdf · uploaded 4 Jul 2019Source

Technical documents

  • Layout Approvalmap.pdfSource
  • NA Order for Plotted DevelopmentK- PRAT.pdfSource

Proforma allotment letter

  • Proforma allotment letterSale deed Format.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Gotal Panjari, Nagpur (Rural) taluka

Survey, CTS, gat or plot numbers

25Survey No. 25

As published on MahaRERA's project page

Survey No. 25

Boundaries

North
Sanction Laout of KH No 27 2 Maouza Gotad Panjri
South
KH No 7 and 8 of Mouza Shankarpur and 18 M wide ap
East
Sanction Layout of KH No 24 Mouza Gotad Panjri
West
KH No 26 Mouza gotad panjri

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectUmesh Lamge—
OtherRajesh Murakh—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology