Shreeji Eternity Wing - A, Shreeji Eternity Wing - B, Shreeji Eternity Wing - C

Active

Valnai, Mumbai Suburban 400064 |Promoter: Shreeji Construction

15 Jan 2024Registered with MahaRERA
30 Jun 2027Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
3
Land area for this project
3,468 sq m (37,325 sq ft)
Permissible built-up area
13,645 sq m (1,46,869 sq ft)
Sanctioned built-up area
11,930 sq m (1,28,412 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
SLUM REHABILITATION AUTHORITY
Address
CTS No 307/8, Valnai, Malad WestPIN 400064
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Shreeji Eternity Wing - A, Shreeji Eternity Wing - B, Shreeji Eternity Wing - C is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2027

Registered
15 Jan 2024
Promised
30 Jun 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5180005431015 Jan 202430 Jun 2027—Shreeji ConstructionProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A wing17—
B Wing19—
C Wing19—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A wingClosed/Covered000041
A wingOpen Space00000
B WingClosed/Covered000051
B WingOpen Space00000
C WingClosed/Covered00001
C WingOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A wing

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure47%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks24%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

B Wing

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure13%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks24%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

C Wing

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure73%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks24%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supply0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)0%
  • Storm Water Drains0%
  • Landscaping & Tree Planting0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage Water0%
  • Solid Waste Management And Disposal0%
  • Water conservation /Rain water harvesting0%
  • Energy managemcnt0%
  • Fire protection and fire safety requirements0%
  • Electrical meter room, sub-station, receiving station0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

83 documents held by Deedo, 75 filings listed on MahaRERA's project page

Form 1 (6)

Title report

Encumbrance details (2)

Show all 158 documentsShow fewer documents

Encumbrance details (2)

Form B

Other (37)

Allotment letter (2)

Commencement certificate (4)

Form 2 (8)

Form 2A (2)

Form 5

Registration certificate

Layout plan (17)

Building plan

Document library

  • Building Plan Approval / NA Order for plotted developmentIOA.pdf · uploaded 5 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Shreeji Eternity Wing A B C 29-Sep-2023 20-10-44.pdf · uploaded 5 Oct 2023View
  • a Details of encumbrances concerned to FinanceNo Encumbrance Self-Declaration Shreeji Eternity A,B, C Wing.pdf · uploaded 21 Nov 2023View
  • b Details of encumbrances concerned to LegalNo Encumbrance Self-Declaration Shreeji Eternity A,B, C Wing.pdf · uploaded 21 Nov 2023View
  • CERSAI detailsCersai Declaration Shreeji Eternity A,B,C Wing.pdf · uploaded 21 Nov 2023View
  • Deviation Report with respect to Allotment letterDeviation Report Shreeji Eternity A,B,C Wing.pdf · uploaded 21 Nov 2023View
  • Declaration in FORM BForm B (A,B, C Wing).pdf · uploaded 21 Nov 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameEternity bank declaration ABC wing.pdf · uploaded 21 Nov 2023View
  • Copy of the legal title reportmalad ganga Title Report (1).pdf · uploaded 21 Nov 2023View
  • Proforma of Agreement for saleRERA AGREEMENT ABC wing.pdf · uploaded 22 Nov 2023View
  • Proforma of Allotment letterALLOTMENT LETTER FINAL-ABC wing.pdf · uploaded 22 Nov 2023View
  • Deviation Report with respect to model copy of AgreementDeviation Report AFS Shreeji Eternity A,B and C Wing (1).pdf · uploaded 22 Nov 2023View
  • Copy of Layout Approval (in case of layout)1_compressed.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)2_compressed.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)3_compressed.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)4_compressed.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)5_compressed.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)6_compressed.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)7_compressed a.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)8_compressed a.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)9_compressed b.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)10_compressed b.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)11_compressed c.pdf · uploaded 25 Nov 2023View
  • Copy of Layout Approval (in case of layout)12_compressed c.pdf · uploaded 25 Nov 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure A DOI.pdf · uploaded 27 Nov 2023View
  • Declaration about Commencement Certificatecc declaration Eternity ABC Wing.pdf · uploaded 11 Dec 2023View
  • Commencement Certificates / NA Order for plotted developmentmalad ganga chs Plinth CC.pdf · uploaded 9 Jan 2024View
  • Commencement Certificates / NA Order for plotted developmentShreeji Eternity Malad Ganga CHS Plinth CC.pdf · uploaded 19 Mar 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed architect certificate ( shreeji eternity wing A B C ).pdf · uploaded 17 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 25 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 11 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 10 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 22 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A 23-24.pdf · uploaded 6 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 11 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 21 Jan 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 23-24.pdf · uploaded 11 Feb 2025View
  • Proforma of Agreement for saleAFS A B C (1).pdf · uploaded 5 Mar 2025View
  • Commencement Certificates / NA Order for plotted developmentMALAD GANGA FURTHER CC ABC wing.pdf · uploaded 13 Mar 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 11 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Enginner -Eternity ABC wing.pdf · uploaded 15 Apr 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed Engineer certificate-Eternity ABC.pdf · uploaded 18 Apr 2025View
  • Withdrawal Update Form 1form 1.pdf · uploaded 3 Jan 2026View
  • Withdrawal Update Form 2Signed Engineer cer- ETERNITY ABC.pdf · uploaded 3 Jan 2026View
  • Withdrawal Update Form 1form 1.pdf · uploaded 28 Jan 2026View
  • Withdrawal Update Form 2Signed Eternity ABC Enginner cer-sep 25.pdf · uploaded 28 Jan 2026View
  • Withdrawal Update Form 1Signed Architect Shreeji Eternity A B C.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 2FORM 2 ENGINEER ABC WING.pdf · uploaded 20 Feb 2026View
  • Withdrawal Update Form 1Signed Shreeji Eternity A B and C Wing.pdf · uploaded 1 Jun 2026View
  • Withdrawal Update Form 2Signed Eternity ABC Wing.pdf · uploaded 1 Jun 2026View
  • Withdrawal Update Form 1Eternity ABC.pdf · uploaded 22 Aug 2026View
  • Withdrawal Update Form 2Signed Engineer Certificate Shreeji Eternity ABC KP June 26.pdf · uploaded 22 Aug 2026View
  • Form 2A (FY 2025-2026)Signed form 2A (engineer certificate)-Eternity ABC KP.pdf · uploaded 12 Sep 2026View

Promoter documents

  • Declaration Form BForm B (A,B, C Wing).pdf · uploaded 21 Nov 2023View
  • Legal Title reportmalad ganga Title Report (1).pdf · uploaded 21 Nov 2023View

Technical documents

  • Building Plan ApprovalIOA.pdfView
  • Layout Approval1_compressed.pdfView
  • Layout Approval2_compressed.pdfView
  • Layout Approval3_compressed.pdfView
  • Layout Approval4_compressed.pdfView
  • Layout Approval5_compressed.pdfView
  • Layout Approval6_compressed.pdfView
  • Layout Approval7_compressed a.pdfView
  • Layout Approval8_compressed a.pdfView
  • Layout Approval9_compressed b.pdfView
  • Layout Approval10_compressed b.pdfView
  • Layout Approval11_compressed c.pdfView
  • Layout Approval12_compressed c.pdfView
  • Layout Approvalall plans gray_1-3.pdfView
  • Layout Approvalall plans gray_4-6.pdfView
  • Layout Approvalall plans gray_7-9.pdfView
  • Layout Approvalall plans gray_10-12.pdfView
  • Layout Approvalall plans gray_13-end.pdfView

Commencement certificates and NA orders

  • Commencement certificate / NA orderSource

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER FINAL-ABC wing.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Valnai, Borivali taluka

Survey, CTS, gat or plot numbers

307/8CTS No 307/8

As published on MahaRERA's project page

CTS No 307/8

Boundaries

North
By Parth Business Plaza
South
By Sunder Lane
East
By Father Justine Dsouza Ground
West
By Link Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectUrbdes—
Chartered accountantNehali Dhaval Doshi—
EngineerKrishna Pandey—

Source: MahaRERA project page. Contact details are not shown.

Data through12 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology