Marathon Neopark Ashoka Wing C
Certificate SignedBhandup, Mumbai Suburban 400078 |Promoter: Marathon Nextgen Realty Ltd
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, Studio151 units in all
- Address
- Cts No 87/D Part, Lake Road Tulshetpada, Bhandup WestPIN 400078
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 13 Sep 2021
- Promised
- 30 Jun 2028
- Revised
- 30 Oct 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51800030752 | 13 Sep 2021 | 30 Jun 2028 | 30 Oct 2028 | Marathon Nextgen Realty Ltd | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Wing C | 22 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 151 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 26.44 sq m · 285 sq ft | 64 | 0 |
| Studio | 16.07 sq m · 173 sq ft | 87 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 200 filings listed on MahaRERA's project page
Finance
- PAN CardSHREEGANESH PAN 1.pdf · uploaded 11 Aug 2021Source
Legal
Migrated
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's Certificate- ( NEOPARK-C wing )-feb21_compressed.pdf · uploaded 22 Mar 2021Source
Show all 202 documentsShow fewer documents
Migrated
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA NEOPARK ASHOKA WING C_compressed.pdf · uploaded 22 Mar 2021Source
- 1 Declaration in FORM BForm B Neopark Ashoka.pdf · uploaded 20 Jul 2021Source
- 1 Proforma of Allotment letterDecl_AFS_Neopark Ashoka Wing ABC.pdf · uploaded 20 Jul 2021Source
- 1 PAN CardSHREEGANESH PAN 1.pdf · uploaded 11 Aug 2021Source
- 1 Copy of Layout Approval (in case of layout)SHREEGANES LAYOUT_compressed.pdf · uploaded 11 Aug 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN 1.pdf · uploaded 11 Aug 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentSHREEGANESH CC.pdf · uploaded 11 Aug 2021Source
- 1 Declaration about Commencement CertificateSHREE GANESH DECLARATION OF COMMENCEMENT CERTIFICATE.pdf · uploaded 11 Aug 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH NEOPARK WING C.pdf · uploaded 11 Aug 2021Source
- 1 Copy of the legal title reportNEOPARK REVISED TITEL.pdf · uploaded 12 Aug 2021Source
- 1 Details of encumbrancesNo Encumbrance Certificate Shree Ganesh Dt 11 Aug 2021.pdf · uploaded 12 Aug 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentSHREEGANESH APP PLAN-2.pdf · uploaded 19 Aug 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentSHREEGANESH APP PLAN-3.pdf · uploaded 19 Aug 2021Source
- 4 Building Plan Approval / NA Order for plotted developmentSHREEGANESH APP PLAN-4.pdf · uploaded 19 Aug 2021Source
- 1 OtherNEOPARK CONVINECE.pdf · uploaded 9 Sep 2021Source
- 2 OtherNEOPARK ANN A.pdf · uploaded 9 Sep 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)ASHOKA C.pdf · uploaded 5 Mar 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ASHOKA C.pdf · uploaded 22 Apr 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Neopark Ashoka C - March 2022.pdf · uploaded 25 Apr 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1_ Neopark Ashoka Wing C.pdf · uploaded 4 Jul 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Neopark C Wing RERA Engg Certificate June 2022_compressed.pdf · uploaded 7 Jul 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)ASHOK C WING.pdf · uploaded 8 Jul 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)ASHOK C WING.pdf · uploaded 9 Jul 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_Form 1 Ashoka Wing C 2022.pdf · uploaded 15 Oct 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Neopark Ashoka C RERA Eng Cert Sep 22.pdf · uploaded 15 Oct 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Neo Park Asoka C- Wing Sep 22.pdf · uploaded 28 Oct 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)MARATHON NEOPARK ASHOKA C WING.pdf · uploaded 7 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)MNRL Form 5 M22 pdf neo park C.pdf · uploaded 2 Dec 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_Form-1_Neopark Ashoka C-Wing_2022.pdf · uploaded 6 Jan 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Neopark Ashoka C RERA Eng Cert Dec 2022.pdf · uploaded 11 Jan 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_Form-1_Neopark Ashoka C-Wing_2023.pdf · uploaded 10 Apr 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certificate for Neo Park C wing_Mar 2023.pdf · uploaded 20 Apr 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Neopark Ashoka C RERA Eng Cert MAR 2023.pdf · uploaded 4 May 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_Form-1_Ashoka Wing C_2023.pdf · uploaded 12 Jul 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ashoka C Wing RERA Eng Cert Jun 2023.pdf · uploaded 24 Jul 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Ashoka C Wing RERA Eng Cert Jun 2023.pdf · uploaded 3 Aug 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)AC_Form-1_Ashoka Wing C_2023.pdf · uploaded 12 Oct 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Microsoft Word - Form 2_Engineer's Certificate- ( NEOPARK-C wing )-Sep 2023.pdf · uploaded 30 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)MNRL form 5 for FY 2022-23 ( Neo Park,C WING_compressed (1).pdf · uploaded 15 Jan 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3_AC_Form-1_Ashoka Wing C_2023.pdf · uploaded 24 Jan 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineer's Certificate- ( NEOPARK-C wing )-Dec-2023.pdf · uploaded 24 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)c wing.pdf · uploaded 1 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certificate for Neo Park C wing_Dec 2023.pdf · uploaded 20 Feb 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 17 Apr 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)signedForm 2_Engineer's Certificate- ( NEOPARK-C wing )-Mar 2024.pdf · uploaded 17 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certificate for Neo Park C wing_March 2024.pdf · uploaded 17 Apr 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certificate for Neo Park C wing_March 2024.pdf · uploaded 24 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM-2A NEOPARK 1 ASHOKA-C_ MAR-2024.pdf · uploaded 27 May 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)signedQ1_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 24 Jul 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)signedForm 2_Engineer's Certificate- ( NEOPARK-C wing )-June 2024.pdf · uploaded 24 Jul 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Ca Cert Ashoka c Wing June 24.pdf · uploaded 24 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 14 Oct 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Neo Park C wing Sep 2024.pdf · uploaded 23 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineer's Certificate- Ashoka-C wing Sep 2024.pdf · uploaded 23 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 NEOPARK ASHOKA WING C.pdf · uploaded 27 Nov 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Ashoka C Wing.pdf · uploaded 29 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rera Certi Neo Park C- Wing As On Sep 2021.pdf · uploaded 10 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rera Certi Neo Park C- Wing As On Dec 2021.pdf · uploaded 10 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certificate for Neo Park C wing_Mar 2023.pdf · uploaded 10 Jan 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certificate for Neo Park C wing_June 2023.pdf · uploaded 10 Jan 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certificate for Neo Park C wing_Sep 2023.pdf · uploaded 10 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 13 Jan 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certificate for Neo Park C wing_Dec 2024.pdf · uploaded 29 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineer's Certificate- ( NEOPARK-C wing )-Dec 2024.pdf · uploaded 29 Jan 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Ashoka C Wing Sep 2021.pdf · uploaded 5 Feb 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Ashoka C Wing Dec 2021.pdf · uploaded 5 Feb 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Ashoka c Wing Mar 2022.pdf · uploaded 5 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Ashoka C Wing Jun 2021.pdf · uploaded 6 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Arc Cert Ashoka C wing Mar 2023.pdf · uploaded 15 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Arc Cert Ashoka C wing Jun 2023.pdf · uploaded 15 Apr 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Arc Cert Ashoka C Wing Sep 2023.pdf · uploaded 15 Apr 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Arc Cert Ashoka C Wing Dec 2023.pdf · uploaded 15 Apr 2025Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Arc Cert Ashoka C Wing Mar 2024.pdf · uploaded 15 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDislosure Sold unsold inventory.pdf · uploaded 17 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Ashoka C wing 2022-23.pdf · uploaded 17 Apr 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Ashoka C wing 2022-23.pdf · uploaded 17 Apr 2025Source
- 1 Declaration about Commencement Certificate21032025 Full C C of sale A B C.pdf · uploaded 21 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4_AC_Form-1_Ashoka Wing C_2025.pdf · uploaded 28 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certificate for Neo Park C wing_Mar 2025.pdf · uploaded 28 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)signedForm 2_Engineer's Certificate- ( NEOPARK-C wing )-Mar 2025.pdf · uploaded 28 Apr 2025Source
- Form 5 (FY 2021-2022)MNRL - Form 5 - Ashoka C wing.pdf · uploaded 16 Sep 2025Source
- Form 5 (FY 2022-2023)MNRL form 5 for FY 2022-23 Ashoka C Wing.pdf · uploaded 16 Sep 2025Source
- Form 5 (FY 2023-2024)Form 5 NEOPARK ASHOKA WING C Mar-24.pdf · uploaded 16 Sep 2025Source
- Form 1Q4_AC_Form-1_Ashoka Wing C_2025.pdf · uploaded 26 Sep 2025Source
- Form 2signedForm 2_Engineer's Certificate- ( NEOPARK-C wing )-Mar 2025.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_Mar 2025.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_Mar 2025.pdf · uploaded 26 Sep 2025Source
- Form 1Q3_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 26 Sep 2025Source
- Form 2Form 2_Engineer's Certificate- ( NEOPARK-C wing )-Dec 2024.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_Dec 2024.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_Dec 2024.pdf · uploaded 26 Sep 2025Source
- Form 1Q2_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 26 Sep 2025Source
- Form 2signedForm 2_Engineer's Certificate- ( NEOPARK-C wing )-Sep 2024.pdf · uploaded 26 Sep 2025Source
- Form 3Neo Park C wing Sep 2024.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing Sep 2024.pdf · uploaded 26 Sep 2025Source
- Form 1Q1_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 26 Sep 2025Source
- Form 2signedForm 2_Engineer's Certificate- ( NEOPARK-C wing )-June 2024.pdf · uploaded 26 Sep 2025Source
- Form 3Form 3 Ca Cert Ashoka c Wing June 24.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka c Wing June 24.pdf · uploaded 26 Sep 2025Source
- Form 1Q1_AC_Form-1_Ashoka Wing C_2023.pdf · uploaded 26 Sep 2025Source
- Form 2Ashoka C Wing RERA Eng Cert Jun 2023.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_June 2023.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_June 2023.pdf · uploaded 26 Sep 2025Source
- Form 1Q2_AC_Form-1_Ashoka Wing C_2023.pdf · uploaded 26 Sep 2025Source
- Form 2Microsoft Word - Form 2_Engineer's Certificate- ( NEOPARK-C wing )-Sep 2023.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_Sep 2023.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_Sep 2023.pdf · uploaded 26 Sep 2025Source
- Form 1Q3_AC_Form-1_Ashoka Wing C_2023.pdf · uploaded 26 Sep 2025Source
- Form 2Form 2_Engineer's Certificate- ( NEOPARK-C wing )-Dec-2023.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_Dec 2023.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_Dec 2023.pdf · uploaded 26 Sep 2025Source
- Form 1Q4_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 26 Sep 2025Source
- Form 2signedForm 2_Engineer's Certificate- ( NEOPARK-C wing )-Mar 2024.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_March 2024.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_March 2024.pdf · uploaded 26 Sep 2025Source
- Form 1Q4_AC_Form-1_ Ashoka Wing C_2023.pdf · uploaded 26 Sep 2025Source
- Form 2Neopark Ashoka C RERA Eng Cert MAR 2023.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_Mar 2023.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_Mar 2023.pdf · uploaded 26 Sep 2025Source
- Form 1Q3_AC_Form-1_ Ashoka Wing C_2022 (2).pdf · uploaded 26 Sep 2025Source
- Form 2Neopark Ashoka C RERA Eng Cert Dec 2022.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_Dec 2022.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_Dec 2022.pdf · uploaded 26 Sep 2025Source
- Form 1Q2_AC_Form-1_Ashoka Wing C_2022.pdf · uploaded 26 Sep 2025Source
- Form 2Neopark Ashoka C RERA Eng Cert Sep 22.pdf · uploaded 26 Sep 2025Source
- Form 3Neo Park Asoka C- Wing Sep 22.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C- Wing Sep 22.pdf · uploaded 26 Sep 2025Source
- Form 1Q1_AC_Form-1_Ashoka Wing C_2022.pdf · uploaded 26 Sep 2025Source
- Form 2Neopark_C Wing_RERA Engg Certificate_June 2022.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_June 2022.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_June 2022.pdf · uploaded 26 Sep 2025Source
- Form 1Form 1 Arc Cert Ashoka C Wing Mar 2022.pdf · uploaded 26 Sep 2025Source
- Form 2Form 2 Engg Cert Ashoka C Wing Mar 2022.pdf · uploaded 26 Sep 2025Source
- Form 3RERA Certificate for Neo Park C wing_Mar 2022.pdf · uploaded 26 Sep 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C wing_Mar 2022.pdf · uploaded 26 Sep 2025Source
- Withdrawal Update Form 1Q4_AC_Form-1_Ashoka Wing C_2025.pdf · uploaded 26 Sep 2025Source
- Withdrawal Update Form 2signedForm 2_Engineeru0027s Certificate- ( NEOPARK-C wing )-Mar 2025.pdf · uploaded 26 Sep 2025Source
- Withdrawal Update Form 3RERA Certificate for Neo Park C wing_Mar 2025.pdf · uploaded 26 Sep 2025Source
- Form 2A (FY 2021-2022)Form 2A Ashoka c Wing Mar 2022.pdf · uploaded 26 Sep 2025Source
- Form 2A (FY 2022-2023)Form 2A Ashoka C wing 2022-23.pdf · uploaded 26 Sep 2025Source
- Form 2A (FY 2023-2024)FORM-2A NEOPARK 1 ASHOKA-C_ MAR-2024.pdf · uploaded 26 Sep 2025Source
- Form 2A (FY 2024-2025)Form 2A Ashoka C Wing Mar 2025.pdf · uploaded 26 Sep 2025Source
- Form 1Form 1 Arc Cert Ashoka C Wing Sep 2021.pdf · uploaded 1 Oct 2025Source
- Form 2Form 2 Engg Cert Ashoka C Wing Sep 2021.pdf · uploaded 1 Oct 2025Source
- Form 3Form 3 Ca Cert Ashoka C Wing Sep 2021.pdf · uploaded 1 Oct 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C Wing Sep 2021.pdf · uploaded 1 Oct 2025Source
- Form 1Form 1 Arc Cert Ashoka C Wing Dec 2021.pdf · uploaded 3 Oct 2025Source
- Form 2Form 2 Engg Cert Ashoka C Wing Dec 2021pdf.pdf · uploaded 3 Oct 2025Source
- Form 3Rera Certi Neo Park C- Wing As On Dec 2021.pdf · uploaded 3 Oct 2025Source
- Disclosure of Sold and Booked InventoryDSUI Ashoka C- Wing Dec 2021.pdf · uploaded 3 Oct 2025Source
- Withdrawal Update Form 1Q1_AC_Form-1_Ashoka Wing C_2025.pdf · uploaded 3 Oct 2025Source
- Withdrawal Update Form 2signed-Form 2_Engineeru0027s Certificate- ( NEOPARK-C wing )-Jun 2025.pdf · uploaded 3 Oct 2025Source
- Withdrawal Update Form 3RERA Certificate for Neo Park C wing_June 2025.pdf · uploaded 3 Oct 2025Source
- Withdrawal Update Form 1Q2_AC_Form-1_Ashoka Wing C_2025.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 2Form 2_Engineeru0027s Certificate- ( NEOPARK-C wing ) - Sep 2025.pdf · uploaded 24 Nov 2025Source
- Withdrawal Update Form 3RERA Certificate for Neo Park C wing_Sep 2025.pdf · uploaded 24 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5 Ashoka C Wing 2024-25.pdf · uploaded 15 Dec 2025Source
- Withdrawal Update Form 1Q3_AC_Form-1_Ashoka Wing C_2025.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 2Form 2 Engg Cert Ashoka C Wing Dec 2025.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 3RERA Certificate for Neo Park C wing_Dec 2025.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 1Q4_AC_Form-1_Ashoka Wing C_2026.pdf · uploaded 10 Apr 2026Source
- Withdrawal Update Form 2updated Form 2 Engg Cert Ashoka C Wing Mar 2026 (1).pdf · uploaded 10 Apr 2026Source
- Withdrawal Update Form 3RERA Certificate for Neo Park C wing _ Mar 2026.pdf · uploaded 10 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A Ashoka C wing Mar 2026.pdf · uploaded 21 Apr 2026Source
- Withdrawal Update Form 1Q1_AC_Form-1_Ashoka Wing C_2026.pdf · uploaded 15 Jul 2026Source
- Withdrawal Update Form 2SignedAshoka C Wing Withdrawal Application Form2 June 2026.pdf · uploaded 15 Jul 2026Source
- Withdrawal Update Form 3RERA Certificate for Neo Park C wing_June 2026.pdf · uploaded 15 Jul 2026Source
Technical
- DocumentSHREEGANES LAYOUT_compressed.pdf · uploaded 11 Aug 2021Source
- DocumentPLAN 1.pdf · uploaded 11 Aug 2021Source
- DocumentSHREEGANESH APP PLAN-2.pdf · uploaded 19 Aug 2021Source
- DocumentSHREEGANESH APP PLAN-3.pdf · uploaded 19 Aug 2021Source
- DocumentSHREEGANESH APP PLAN-4.pdf · uploaded 19 Aug 2021Source
- Document240429_ Amended IOA-1-4.pdf · uploaded 29 Oct 2025Source
- Document240429_ Amended IOA-5-8.pdf · uploaded 29 Oct 2025Source
- Document240429_ Amended IOA-9-12.pdf · uploaded 29 Oct 2025Source
- Documentlayout.pdf · uploaded 25 Nov 2025Source
- Documentplan 1.pdf · uploaded 25 Nov 2025Source
- Documentplan 2.pdf · uploaded 25 Nov 2025Source
- Othersletter.pdf · uploaded 25 Nov 2025Source
- DocumentShree Ganesh N A order 15-02-2023.pdf · uploaded 26 Nov 2025Source
- Document20251126032723.pdf · uploaded 26 Nov 2025Source
Technical (Architect)
- DocumentQ2_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 14 Oct 2024Source
- DocumentQ3_AC_Form-1_Ashoka Wing C_2024.pdf · uploaded 13 Jan 2025Source
- DocumentForm 1 Arc Cert Ashoka C wing Mar 2023.pdf · uploaded 15 Apr 2025Source
- DocumentForm 1 Arc Cert Ashoka C wing Jun 2023.pdf · uploaded 15 Apr 2025Source
- DocumentForm 1 Arc Cert Ashoka C Wing Sep 2023.pdf · uploaded 15 Apr 2025Source
- DocumentForm 1 Arc Cert Ashoka C Wing Dec 2023.pdf · uploaded 15 Apr 2025Source
- DocumentForm 1 Arc Cert Ashoka C Wing Mar 2024.pdf · uploaded 15 Apr 2025Source
- DocumentQ4_AC_Form-1_Ashoka Wing C_2025.pdf · uploaded 28 Apr 2025Source
- DocumentQ1_AC_Form-1_Ashoka Wing C_2026.pdf · uploaded 15 Jul 2026Source
Technical (Engineer)
- DocumentForm 2_Engineer's Certificate- Ashoka-C wing Sep 2024.pdf · uploaded 23 Oct 2024Source
- DocumentForm 2_Engineer's Certificate- ( NEOPARK-C wing )-Dec 2024.pdf · uploaded 29 Jan 2025Source
- DocumentsignedForm 2_Engineer's Certificate- ( NEOPARK-C wing )-Mar 2025.pdf · uploaded 28 Apr 2025Source
- DocumentSignedAshoka C Wing Withdrawal Application Form2 June 2026.pdf · uploaded 15 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Bhandup, Kurla taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Cts No 87 And Mahakaleswar Chs Ltd
- South
- Cts No 87 And Cts 100a3 100a4
- East
- Cts No 98
- West
- 36 Mt Wide Dp Road And Tansa Pipe Line
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Santosh Kumar Premchandra Dubey | — |
| Chartered accountant | Akshay Shah | — |
| Chartered accountant | Apurva Shah | — |
| Chartered accountant | Dinesh Ganpat Pai | — |
| Engineer | Gurrunath Dhavann | — |
| Engineer | Urvesh Virendra Mehta | — |
| Registered real estate agent | Ankit Bhim Ghosh | — |
| Registered real estate agent | Bhavesh Dattatray Kaware | — |
Show all 17 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | Kartik Bhavesh Dawda | — |
| Registered real estate agent | Kartik Dilip Mashru | — |
| Registered real estate agent | Mangesh Tawade | — |
| Registered real estate agent | Mayuri Shubham Dhokare | — |
| Registered real estate agent | Nagesh Rajendra Gosavi | — |
| Registered real estate agent | Pranjal Eknath Patil | — |
| Registered real estate agent | Rajesh Gangaram Humbe | — |
| Registered real estate agent | Ravi Shubhashchandra Dwivedi | — |
| Registered real estate agent | Sameer Treekamji Raykongar | — |
Source: MahaRERA project page. Contact details are not shown.