Bafna Avenue
Certificate SignedWard Abcd, Maharashtra 400004 |Promoter: Bafna Metstrips Private Limited
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK, Multipurpose hall, Shop9 units in all
- Address
- C.S NO 2/1103, Bafna Avenue, 12th Khetwadi Main Road, Padamji Road, Girgaon, Mumbai 400004., KHETWADIPIN 400004
- Designated bank account
- 76
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 11 Oct 2021
- Promised
- 31 Dec 2027
- Revised
- 30 Apr 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51900031232 | 11 Oct 2021 | 31 Dec 2027 | 30 Apr 2028 | Bafna Metstrips Private Limited | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Bafna Avenue | 14 | 9 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
8 of 9 units booked (89%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 75.13 sq m · 809 sq ft | 4 | 4 |
| Multipurpose hall | 34.13 sq m · 367 sq ft | 1 | 1 |
| Shop | 12.11 sq m · 130 sq ft | 1 | 1 |
| Shop | 16.95 sq m · 182 sq ft | 1 | 1 |
| Shop | 17.81 sq m · 192 sq ft | 1 | 0 |
| Shop | 29.16 sq m · 314 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 133 filings listed on MahaRERA's project page
Finance
- PAN CardBAFNA METSTRIPS PVT LTD (PAN CARD ).pdf · uploaded 4 Feb 2021Source
Legal
Show all 134 documentsShow fewer documents
Migrated
- 1 Declaration in FORM BFORM B.pdf · uploaded 4 Feb 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 8 Mar 2021Source
- 1 Proforma of Allotment letterRERA allotment letter.pdf · uploaded 14 Mar 2021Source
- 1 Copy of the legal title reportLegal title report 2.pdf · uploaded 23 Sep 2021Source
- 2 Copy of the legal title reportTitle Certificate (1)-1-6.pdf · uploaded 23 Sep 2021Source
- 3 Copy of the legal title reportTitle Certificate (1)-7-12.pdf · uploaded 23 Sep 2021Source
- 1 Declaration about Commencement CertificateDecleration About Commencement Certificate.pdf · uploaded 24 Sep 2021Source
- 1 Commencement Certificates / NA Order for plotted development2281348_FurtherCC_signed.pdf · uploaded 29 Sep 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENG NEW.pdf · uploaded 29 Sep 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA NEW.pdf · uploaded 29 Sep 2021Source
- 1 Copy of Layout Approval (in case of layout)APPROVED LAYOUT PLAN.pdf · uploaded 4 Oct 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 01.pdf · uploaded 4 Oct 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentBUILDING PLAN 02.pdf · uploaded 4 Oct 2021Source
- 2 Proforma of Allotment letterAGREEMENT.pdf · uploaded 4 Oct 2021Source
- 2 Declaration about Commencement CertificateDECL CC.pdf · uploaded 21 Jan 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect upload.pdf · uploaded 21 Jan 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENG 2.pdf · uploaded 21 Jan 2022Source
- 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD AND UNSOLD.pdf · uploaded 21 Jan 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA FORM 3.pdf · uploaded 21 Jan 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5.pdf · uploaded 21 Jan 2022Source
- 3 Building Plan Approval / NA Order for plotted developmentApproval of final Amendment_signed.pdf · uploaded 22 Apr 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentFull CC_signed.pdf · uploaded 22 Apr 2022Source
- 3 Declaration about Commencement CertificateDeclaration of cc.pdf · uploaded 22 Apr 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 (1).pdf · uploaded 22 Apr 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 22 Apr 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 22 Apr 2022Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 22 Apr 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 22 Apr 2022Source
- 4 Declaration about Commencement CertificateCC DISCLOSURE.pdf · uploaded 8 Jul 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect qtr 1 22-23_compressed.pdf · uploaded 8 Jul 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer certificate qtr 1 22-23.pdf · uploaded 8 Jul 2022Source
- 3 Disclosure of sold/ booked inventorysold unsold data qtr 1 22-23-2.pdf · uploaded 8 Jul 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA qtr 1 22-23_compressed.pdf · uploaded 8 Jul 2022Source
- 5 Declaration about Commencement CertificateDecleration About Commenment Certificate From-D.pdf · uploaded 13 Oct 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate form 1.pdf · uploaded 13 Oct 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 Annexure B.pdf · uploaded 13 Oct 2022Source
- 4 Disclosure of sold/ booked inventoryDisclosure of sold book Inventory.pdf · uploaded 13 Oct 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)AnnexureD FORM3.pdf · uploaded 13 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Annexure F FORM5 Scan Doc.pdf · uploaded 13 Oct 2022Source
- 6 Declaration about Commencement CertificateDecleration About Commenment Certificate From-D.pdf · uploaded 16 Jan 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 16 Jan 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg certficate (1).pdf · uploaded 16 Jan 2023Source
- 5 Disclosure of sold/ booked inventoryDisclosure of sold unsold inventory qtr 3 22-23.pdf · uploaded 16 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of bank account.pdf · uploaded 16 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 24 Jan 2023Source
- 6 Disclosure of sold/ booked inventoryDisclosure of sold unsold inventory.pdf · uploaded 25 Jan 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate.pdf · uploaded 25 Jan 2023Source
- 7 Declaration about Commencement CertificateFormat D - CC declaration (1).pdf · uploaded 13 Apr 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect cert Bafna stamped Qtr 4 22-23 copy_compressed.pdf · uploaded 13 Apr 2023Source
- 7 Disclosure of sold/ booked inventoryDisclosure of Sold unsold inventory Qtr 4 22-23 (1).pdf · uploaded 13 Apr 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A1 JMB_merged_compressed (1).pdf · uploaded 13 Apr 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)For 2 Engg cert Qtr 4 22-23_compressed.pdf · uploaded 14 Apr 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Bafna CA.pdf · uploaded 14 Apr 2023Source
- 8 Disclosure of sold/ booked inventorySold unsold inventory.pdf · uploaded 21 Jul 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate.pdf · uploaded 21 Jul 2023Source
- 8 Declaration about Commencement CertificateFormat D - CC declaration.pdf · uploaded 28 Jul 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate.pdf · uploaded 28 Jul 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Certificate.pdf · uploaded 28 Jul 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 28 Jul 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Shankey Bafna (Civil Engineer).pdf · uploaded 20 Oct 2023Source
- 9 Disclosure of sold/ booked inventoryDisclosure of sold and Booked Inventory.pdf · uploaded 20 Oct 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)chartered account's Certificate.pdf · uploaded 20 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)ANNEXURE F For chartered account's Certificate.pdf · uploaded 20 Oct 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 12 Jan 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate- Qtr1-2024-25.pdf · uploaded 22 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-Qtr2-2024-25.pdf · uploaded 22 Feb 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-Qtr3-2024-25.pdf · uploaded 22 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate-Qtr3-2023-24.pdf · uploaded 22 Feb 2025Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate-Qtr3-2024-25.pdf · uploaded 22 Feb 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate-Qtr2-2024-25.pdf · uploaded 22 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate-Qtr1-2024-25.pdf · uploaded 22 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate-Qtr4-2023-24.pdf · uploaded 22 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate-Qtr3-2023-24.pdf · uploaded 22 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 - 2023-24.pdf · uploaded 22 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE DEC 2023.pdf · uploaded 24 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE MARCH 2024.pdf · uploaded 24 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE JUNE 2024.pdf · uploaded 24 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE SEPT 2024.pdf · uploaded 24 Feb 2025Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENIGINEER CERTIFICATE DEC 2024.pdf · uploaded 24 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A - 2021-22.pdf · uploaded 24 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A - 2023-24.pdf · uploaded 24 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Architect Certificate.pdf · uploaded 16 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - CA Certificate.pdf · uploaded 16 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Engineer's Certificate.pdf · uploaded 16 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold unsold inventory 2024-25.pdf · uploaded 16 Apr 2025Source
- Form 1FORM - 1.pdf · uploaded 19 Jul 2025Source
- Form 2FORM - 2.pdf · uploaded 19 Jul 2025Source
- Form 3FORM - 3.pdf · uploaded 19 Jul 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold & Unsold Inventory.pdf · uploaded 19 Jul 2025Source
- Form 1Form 1 Architect Certificate - Bafna Metstrips Pvt Ltd.pdf · uploaded 15 Oct 2025Source
- Form 2Form 2- Engineer's Certificate Certificate - Bafna Metstrips Pvt ltd.pdf · uploaded 15 Oct 2025Source
- Form 3Form 3 - Chartered Accountant Certificate - Bafna Metstrips Pvt ltd.pdf · uploaded 15 Oct 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold and Booked Inventory.pdf · uploaded 15 Oct 2025Source
- Form 1FORM 1 - 31-12-2025.pdf · uploaded 21 Jan 2026Source
- Form 2FORM 2 - 31-12-2025.pdf · uploaded 21 Jan 2026Source
- Form 3FORM 3 - 31-12-2025.pdf · uploaded 21 Jan 2026Source
- Disclosure of Sold and Booked InventoryDiscloure of Sold Unsold Inventory - 31-12-2025.pdf · uploaded 21 Jan 2026Source
- Form 1FORM 1 - 31-03-2026.pdf · uploaded 18 Apr 2026Source
- Form 2FORM 2 - 31-03-2026.pdf · uploaded 18 Apr 2026Source
- Form 3FORM 3 - 31-03-2026.pdf · uploaded 18 Apr 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory - 31-03-2026.pdf · uploaded 18 Apr 2026Source
- Form 1FORM 1.pdf · uploaded 18 Jul 2026Source
- Form 2FORM 2.pdf · uploaded 18 Jul 2026Source
- Form 3FORM 3.pdf · uploaded 18 Jul 2026Source
- Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD AND UNSOLD.pdf · uploaded 18 Jul 2026Source
- Form 2A (FY 2021-2022)FORM 2A - 2021-22.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2022-2023)FORM 2A - 2022-23.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2023-2024)FORM 2A - 2023-24.pdf · uploaded 1 Oct 2026Source
- Form 2A (FY 2024-2025)FORM 2A - 2024-25.pdf · uploaded 1 Oct 2026Source
Technical
Technical (Architect)
- DocumentArchitect Certificate.pdf · uploaded 12 Jan 2024Source
- DocumentArchitect Certificate-Qtr3-2023-24.pdf · uploaded 22 Feb 2025Source
- DocumentArchitect Certificate- Qtr1-2024-25.pdf · uploaded 22 Feb 2025Source
- DocumentArchitect Certificate-Qtr2-2024-25.pdf · uploaded 22 Feb 2025Source
- DocumentArchitect Certificate-Qtr3-2024-25.pdf · uploaded 22 Feb 2025Source
- DocumentForm 1- Architect Certificate.pdf · uploaded 16 Apr 2025Source
Technical (Engineer)
- DocumentShankey Bafna (Civil Engineer).pdf · uploaded 20 Oct 2023Source
- DocumentENGINEER CERTIFICATE DEC 2023.pdf · uploaded 24 Feb 2025Source
- DocumentENGINEER CERTIFICATE MARCH 2024.pdf · uploaded 24 Feb 2025Source
- DocumentENGINEER CERTIFICATE JUNE 2024.pdf · uploaded 24 Feb 2025Source
- DocumentENGINEER CERTIFICATE SEPT 2024.pdf · uploaded 24 Feb 2025Source
- DocumentENIGINEER CERTIFICATE DEC 2024.pdf · uploaded 24 Feb 2025Source
- DocumentForm 2- Engineer's Certificate.pdf · uploaded 16 Apr 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
Survey, CTS, gat or plot numbers
Boundaries
- North
- New Mahimwala Building
- South
- Padamji Road
- East
- Khetwadi 12th Lane
- West
- Edul-Aie Society
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Kaushal Chouhan | — |
| Chartered accountant | Ca Ritesh Bafna | — |
| Engineer | Ravikumar Dhonipala | — |
| Engineer | Shankey Kantilal Bafna | — |
Source: MahaRERA project page. Contact details are not shown.