Navkar Residency

Active

Takali Pra.Cha, Jalgaon 424101 |Promoter: Global Builders

Residential / Group HousingRERAP49900030637
8 Sep 2021Registered with MahaRERA
13 Aug 2026Promised completion
6Buildings
46Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
6
Unit types
1BHK, 2BHK, Bungalow46 units in all
Land area for this project
2,374 sq m (25,550 sq ft)
Permissible built-up area
3,122 sq m (33,600 sq ft)
Sanctioned built-up area
3,122 sq m (33,600 sq ft)
Address
44, 49, 65, 66, 67, 68, 69, Kharjai Road, Karjai RoadPIN 424101
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.47451, 75.02255
Navkar Residency is at latitude 20.47451, longitude 75.02255.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 13 Aug 2026

The latest completion date on record passed 2 months ago.

Registered
8 Sep 2021
Promised
13 Aug 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000306378 Sep 202113 Aug 2026—Global BuildersProject page

6 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A1716
Wing B124
Wing C155
Wing D155
Wing E217
Wing F279

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

46 units registered

1BHK · 8 units2BHK · 4 unitsBungalow · 34 units
BuildingTypeCarpet areaUnits
Wing A1BHK352.52 sq m · 3,794 sq ft8
Wing A2BHK215.34 sq m · 2,318 sq ft4
Wing ABungalow362.68 sq m · 3,904 sq ft4
Wing BBungalow326.33 sq m · 3,513 sq ft4
Wing CBungalow355.62 sq m · 3,828 sq ft5
Wing DBungalow363.06 sq m · 3,908 sq ft5
Wing EBungalow574.16 sq m · 6,180 sq ft7
Wing FBungalow563.85 sq m · 6,069 sq ft9

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered00000
Wing AOpen Space00000
Wing BClosed/Covered00000
Wing BOpen Space00000
Wing CClosed/Covered00000
Wing COpen Space00000
Wing DClosed/Covered00000
Wing DOpen Space00000
Wing EClosed/Covered00000
Wing EOpen Space00000
Wing FClosed/Covered00000
Wing FOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A

  • Excavation70%
  • Basement (if any)70%
  • Podiums (if any)0%
  • Plinth70%
  • Stilt Floor60%
  • Slabs of Super Structure60%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing B

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing C

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing D

  • Excavation70%
  • Basement (if any)70%
  • Podiums (if any)0%
  • Plinth70%
  • Stilt Floor60%
  • Slabs of Super Structure60%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing E

  • Excavation70%
  • Basement (if any)70%
  • Podiums (if any)0%
  • Plinth70%
  • Stilt Floor60%
  • Slabs of Super Structure60%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing F

  • Excavation70%
  • Basement (if any)70%
  • Podiums (if any)70%
  • Plinth70%
  • Stilt Floor60%
  • Slabs of Super Structure60%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsProvided0%
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingProvided0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 24 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificates

Form b

Form 1s

Registration certificate

Form 2s

Other

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 25 Aug 2021View
  • Details of encumbrancesDetails of Encumbrances_compressed.pdf · uploaded 25 Aug 2021View
  • Commencement Certificates / NA Order for plotted developmentNavkar Residency commencement certificates.pdf · uploaded 25 Aug 2021View
  • Declaration in FORM Bform B_compressed.pdf · uploaded 25 Aug 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architects certificates _compressed.pdf · uploaded 25 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer certificate.pdf · uploaded 25 Aug 2021Source
  • Proforma of Allotment letterAllotment Letter_compressed.pdf · uploaded 25 Aug 2021View
  • Declaration about Commencement Certificatenew commencement certificate in foramat D.pdf · uploaded 4 Sep 2021View
  • Copy of Layout Approval (in case of layout)Copy of layout Approval_compressed_compressed.pdf · uploaded 4 Sep 2021View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval NA Order for plotted developement.pdf · uploaded 4 Sep 2021View
  • Copy of Layout Approval (in case of layout)Copy of layout Approval_compressed_compressed.pdf · uploaded 4 Sep 2021View
  • Declaration about Commencement Certificatenew commencement certificate in foramat D.pdf · uploaded 4 Sep 2021View
  • Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval NA Order for plotted developement.pdf · uploaded 4 Sep 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 18 Feb 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Certificate.pdf · uploaded 18 Feb 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Architect Certificate.pdf · uploaded 12 Feb 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2-Engineers Certificate.pdf · uploaded 12 Feb 2025View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 25 Aug 2021View
  • Declaration Form Bform B_compressed.pdf · uploaded 25 Aug 2021View

Technical documents

  • Layout ApprovalCopy of layout Approval_compressed_compressed.pdfView
  • Building Plan ApprovalBuilding Plan Approval NA Order for plotted developement.pdfView
  • Layout ApprovalCopy of layout Approval_compressed_compressed.pdfView
  • Building Plan ApprovalBuilding Plan Approval NA Order for plotted developement.pdfView

Proforma allotment letter

  • Proforma allotment letterAllotment Letter_compressed.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Takali Pra.Cha, Chalisgaon taluka

Survey, CTS, gat or plot numbers

44496566676869

As published on MahaRERA's project page

44,49,65,66,67,68,69

Boundaries

North
30 m road
South
6 m road
East
Gat No 10
West
Plot No 61 to 64

Source: registration certificates and MahaRERA's project page, as stated there.