BLD_006769Completed5 floors

Sai Karushanasha Height · Sai Krushanasha Height

Savkhede Bk. · RERA P49900049006

5Sanctioned habitable floorsregistration certificate
31 Mar 2025Promised completion

Floors

5 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P49900049006 · registered 24 Jan 2023
Promised completion
31 Mar 2025
Sanctioned habitable floors
5

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
1BHK36.4 m² (392 sq.ft)8not published
2BHK46.2 m² (497 sq.ft)4not published
2BHK48.9 m² (526 sq.ft)4not published
2BHK50.3 m² (541 sq.ft)4not published
2BHK50.4 m² (543 sq.ft)4not published
2BHK59.5 m² (640 sq.ft)4not published
Community Hall68.6 m² (738 sq.ft)1not published
Shop9.2 m² (99 sq.ft)2not published
Shop9.6 m² (103 sq.ft)1not published
Shop10.2 m² (109 sq.ft)1not published
Shop11.1 m² (119 sq.ft)2not published
Shop11.5 m² (124 sq.ft)2not published
Shop12.2 m² (131 sq.ft)1not published
Shop12.9 m² (139 sq.ft)1not published
Shop13 m² (140 sq.ft)2not published
Shop14.1 m² (152 sq.ft)2not published
Shop14.5 m² (156 sq.ft)1not published
Shop14.5 m² (156 sq.ft)1not published
Shop15.1 m² (163 sq.ft)4not published
Shop16 m² (172 sq.ft)2not published
Total51

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space00067

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%