Pachora (M Cl), Jalgaon 424201 |Promoter: M/S. Shreyash Realties

Residential / Group HousingRERAP49900017985
3 Oct 2018Registered with MahaRERA
30 Dec 2026Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Land area for this project
12,400 sq m (1,33,472 sq ft)
Permissible built-up area
7,953 sq m (85,607 sq ft)
Sanctioned built-up area
7,953 sq m (85,607 sq ft)
Recreational open space
1,247 sq m (13,428 sq ft)
Address
Amalgamated Plot No 1 To 38, S. No. 104/1, Krushnapuri, Pachora Jamner Road, KrushnapuriPIN 424201
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Ramanand Nagar is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2026

Registered
3 Oct 2018
Promised
30 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P499000179853 Oct 201830 Dec 2026—M/S. Shreyash RealtiesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Row House2—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Closed/Covered00000
Open Space00001
Open Space00001
Open Space00001
Open Space00001
Open Space00001
Open Space00001
Open Space00001
Open Space00001
Open Space00001
Open Space00001
Open Space00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Row House

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsAS PER CONSULTANT DRAWING90%
  • Water SupplyAS PER CONSULTANT DRAWING90%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER CONSULTANT DRAWING90%
  • Storm Water DrainsAS PER CONSULTANT DRAWING90%
  • Landscaping & Tree PlantingAS PER CONSULTANT DRAWING90%
  • Street LightingAS PER CONSULTANT DRAWING90%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAS PER CONSULTANT DRAWING90%
  • Solid Waste Management And DisposalAS PER CONSULTANT DRAWING90%
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER CONSULTANT DRAWING90%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

33 documents held by Deedo, 55 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Commencement certificates

Form 1

Form 5s

Registration certificate

Completion

Others

Layout plan

Building plans

Allotment letter

Document library

  • Details of encumbrancesENCUMBRANCE.pdf · uploaded 17 Sep 2018View
  • Copy of the legal title reportSearch Report_1.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)1 1.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)1 2.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)2.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)3 4.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)5 6 7.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)8 9 10.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)11 12.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)13 14 15.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)16 17 18.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)19 20 21.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)22 23 24.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)25 26 27.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)28 29 30.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)31 38.pdf · uploaded 17 Sep 2018View
  • Building Plan Approval (IOD)31 38_2.pdf · uploaded 17 Sep 2018View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 17 Sep 2018View
  • Declaration in FORM BDECLARATION IN FORM B.pdf · uploaded 19 Sep 2018View
  • Commencement Certificates / NA Order for plotted developmentPERMISSION LETTER_1.pdf · uploaded 21 Sep 2018View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 22 Sep 2018View
  • Declaration about Commencement CertificateFORM D.pdf · uploaded 14 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Assurance Certificate - Ramanand Nagar 19-20.pdf · uploaded 14 Aug 2021Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Assurance Certificate - Ramanand Nagar 20-21.pdf · uploaded 14 Aug 2021Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - Architect's Certificate-02 (12-08-2021).pdf · uploaded 14 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Shreyash- Rera Certificate 2018-19.pdf · uploaded 14 Aug 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Shreyash- Rera Certificate 2019-20.pdf · uploaded 14 Aug 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Shreyash- Rera Certificate 2020-21.pdf · uploaded 14 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)RAMANAND NAGAR - RERA-150821.pdf · uploaded 15 Aug 2021Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentरामानंद नगर भोगवटा प्रमाणपत्र_0001_compressed.pdf · uploaded 17 Feb 2025Source
  • Other – LegalLETTER TO RERA.pdf · uploaded 19 Feb 2025View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentRERA CERTIFICATE-RAMAMNAD NAGAR_signed.pdf · uploaded 19 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Ramanandnagar form 5-2021-22.pdf · uploaded 20 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Ramanand Nagar Form 5-2022-23.pdf · uploaded 20 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Ramanand Nagar Form 5-2023-24.pdf · uploaded 20 Feb 2025View

Promoter documents

  • Legal Title reportSearch Report_1.pdf · uploaded 17 Sep 2018View
  • Declaration Form BDECLARATION IN FORM B.pdf · uploaded 19 Sep 2018View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan Approval1 1.pdfView
  • Building Plan Approval1 2.pdfView
  • Building Plan Approval2.pdfView
  • Building Plan Approval3 4.pdfView
  • Building Plan Approval5 6 7.pdfView
  • Building Plan Approval8 9 10.pdfView
  • Building Plan Approval11 12.pdfView
  • Building Plan Approval13 14 15.pdfView
  • Building Plan Approval16 17 18.pdfView
  • Building Plan Approval19 20 21.pdfView
  • Building Plan Approval22 23 24.pdfView
  • Building Plan Approval25 26 27.pdfView
  • Building Plan Approval28 29 30.pdfView
  • Building Plan Approval31 38.pdfView
  • Building Plan Approval31 38_2.pdfView

Other legal documents

  • Other – LegalLETTER TO RERA.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pachora (M Cl), Pachora taluka

Survey, CTS, gat or plot numbers

104/1AMALGAMATED PLOT NO 1 TO 38S. NO. 104/1

As published on MahaRERA's project page

AMALGAMATED PLOT NO 1 TO 38, S. NO. 104/1, KRUSHNAPURI

Boundaries

North
Adjacent S No 102
South
Adjacent S No 99
East
Adjacent S No 105
West
Adjacent S No 104 2

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSanjay Mhalas—
Chartered accountantS S Dhamne & Co—
EngineerMilind Rathi—

Source: MahaRERA project page. Contact details are not shown.