B M Raval Plaza

Lapsed

Pachora (M Cl), Jalgaon 424201 |Promoter: Dushyant Pravinsagar Raval

31 Aug 2017Registered with MahaRERA
30 Jun 2026Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Lapsed
Buildings
3
Land area for this project
2,510 sq m (27,020 sq ft)
Permissible built-up area
2,264 sq m (24,371 sq ft)
Sanctioned built-up area
2,264 sq m (24,371 sq ft)
Planning authority
PACHORA NAGARPARISHAD, PACHORA
Address
Cts 2669 To 2672and 2679 To 2687 And 2687a And 1 Of 2088 And 2689 To 2693, V P Road, Raval Ginning FactoryPIN 424201
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.18723, 72.84075
B M Raval Plaza is at latitude 19.18723, longitude 72.84075.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2026

The latest completion date on record passed 4 months ago.

Registered
31 Aug 2017
Promised
30 Jun 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990001171931 Aug 201730 Jun 2026—Dushyant Pravinsagar RavalProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
B M Raval Plaza6—
Building (P49900011719)——
Room——

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000050

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

B M Raval Plaza

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsCement Concrete Road100%
  • Water SupplyNagarparishad Water supply100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Architect Drawing100%
  • Storm Water DrainsAs per Architect Drawing100%
  • Landscaping & Tree PlantingAs per Architect Drawing100%
  • Street LightingAs per Architect Drawing100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterAS PER CONSULTANT DRAWING100%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per Architect Drawing100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAs per Architect Drawing100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAs per Architect Drawing100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

80 documents held by Deedo, 161 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Form 1 (37)

Show all 241 documentsShow fewer documents

Form 1 (37)

Form 2 (9)

Commencement certificate (2)

Form 5 (8)

Form 2A (6)

Registration certificate

Occupancy / completion certificate

  • Occupancy / completion certificate20 Feb 2025ViewSource

Other (8)

Layout plan

Building plan (3)

Allotment letter

Document library

  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 27 Aug 2017View
  • Copy of Layout Approval (in case of layout)PLOT LAYOUT.pdf · uploaded 27 Aug 2017View
  • Proforma of Allotment letterAGREEMENT TO SALE.pdf · uploaded 27 Aug 2017View
  • Building Plan Approval (IOD)BASEMENT PLAN.pdf · uploaded 27 Aug 2017View
  • Building Plan Approval (IOD)FIRST AND SECOND FLOOR PLAN.pdf · uploaded 27 Aug 2017View
  • Building Plan Approval (IOD)THIRD FLOOR PLAN.pdf · uploaded 27 Aug 2017View
  • Details of encumbrancesENCUMBRANCE CERTIFICATE.pdf · uploaded 29 Aug 2017View
  • Declaration in FORM BAFFIDAVIT.pdf · uploaded 29 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 29 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE.pdf · uploaded 29 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentPERMISSION LETTER_1.pdf · uploaded 29 Nov 2017View
  • Certificates of CA (Form 5)Form 5_CA Certificate.pdf · uploaded 15 Oct 2018View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Assurance Certificate - Rawal Plaza - 2019-2020.pdf · uploaded 14 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Assurance Certificate - Rawal Plaza - 2020-2021.pdf · uploaded 14 Aug 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)RAVAL PLAZA Architect's Certificate-02 (12-08-21).pdf · uploaded 14 Aug 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate- form 2.pdf · uploaded 14 Aug 2021View
  • Declaration about Commencement CertificateFORM D.pdf · uploaded 14 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Rawal - Form 5 FY 2018-19.pdf · uploaded 14 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Rawal- Form 5 FY 2019-20.pdf · uploaded 14 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Rawal - Form 5 FY 2018-19.pdf · uploaded 14 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Rawal - form 5 FY 2020-21.pdf · uploaded 14 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality_Assurance_Certificate_-_1_Rawal_Plaza_-_21-22.pdf · uploaded 19 Feb 2025View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality_Assurance_Certificate_-_2_Rawal_Plaza_-_2022-23.pdf · uploaded 19 Feb 2025Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality_Assurance_Certificate_-_3_Rawal_Plaza_-_2023-24.pdf · uploaded 19 Feb 2025View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf · uploaded 20 Feb 2025Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf · uploaded 20 Feb 2025View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate.pdf · uploaded 20 Feb 2025View
  • Other – FinanceCompletion Certificate.pdf · uploaded 20 Feb 2025View
  • Other – FinanceClarification Letter.pdf · uploaded 20 Feb 2025View
  • Form 2A (FY 2024-2025)Quality_Assurance_Certificate_-_4_Rawal_Plaza_-_2024-25.pdf · uploaded 19 Jul 2025View
  • Form 2A (FY 2023-2024)Quality_Assurance_Certificate_-_3_Rawal_Plaza_-_2023-24.pdf · uploaded 19 Jul 2025View
  • Form 5 (FY 2024-2025)Form 5 FY 2024-25.pdf · uploaded 22 Jun 2026View
  • Form 5 (FY 2023-2024)Form 5 FY 2023-24.pdf · uploaded 24 Jun 2026View
  • Self-declaration of Quarterly Progress1July 2017 to Sept 2017.pdf · uploaded 29 Jun 2026View
  • Form 11July 2017 to Sept 2017.pdf · uploaded 29 Jun 2026View
  • Form 21July 2017 to Sept 2017.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked Inventory1July 2017 to Sept 2017.pdf · uploaded 29 Jun 2026View
  • Form 1October 2017 to December 2017.pdf · uploaded 29 Jun 2026View
  • Form 2October 2017 to December 2017.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryOctober 2017 to December 2017.pdf · uploaded 29 Jun 2026View
  • Form 1January 2018 to March 2018.pdf · uploaded 29 Jun 2026View
  • Form 2January 2018 to March 2018.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJanuary 2018 to March 2018.pdf · uploaded 29 Jun 2026View
  • Form 1April 2018 to June 2018.pdf · uploaded 29 Jun 2026View
  • Form 2April 2018 to June 2018.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryApril 2018 to June 2018.pdf · uploaded 29 Jun 2026View
  • Form 1July 2018 to Sept 2018.pdf · uploaded 29 Jun 2026View
  • Form 2July 2018 to Sept 2018.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJuly 2018 to Sept 2018.pdf · uploaded 29 Jun 2026View
  • Form 1October 2018 to December 2018.pdf · uploaded 29 Jun 2026View
  • Form 2October 2018 to December 2018.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryOctober 2018 to December 2018.pdf · uploaded 29 Jun 2026View
  • Self-declaration of Quarterly ProgressOctober 2018 to December 2018.pdf · uploaded 29 Jun 2026View
  • Form 1January 2019 to March 2019.pdf · uploaded 29 Jun 2026View
  • Form 2January 2019 to March 2019.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJanuary 2019 to March 2019.pdf · uploaded 29 Jun 2026View
  • Self-declaration of Quarterly ProgressJanuary 2019 to March 2019.pdf · uploaded 29 Jun 2026View
  • Form 1April 2019 to June 2019.pdf · uploaded 29 Jun 2026View
  • Form 2April 2019 to June 2019.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryApril 2019 to June 2019.pdf · uploaded 29 Jun 2026View
  • Self-declaration of Quarterly ProgressApril 2019 to June 2019.pdf · uploaded 29 Jun 2026View
  • Form 1July 2019 to Sept 2019.pdf · uploaded 29 Jun 2026View
  • Form 2July 2019 to Sept 2019.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJuly 2019 to Sept 2019.pdf · uploaded 29 Jun 2026View
  • Self-declaration of Quarterly ProgressJuly 2019 to Sept 2019.pdf · uploaded 29 Jun 2026View
  • Form 1October 2019 to December 2019.pdf · uploaded 29 Jun 2026View
  • Form 2October 2019 to December 2019.pdf · uploaded 29 Jun 2026View
  • Self-declaration of Quarterly ProgressOctober 2019 to December 2019.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryOctober 2019 to December 2019.pdf · uploaded 29 Jun 2026View
  • Form 1January 2020 to March 2020.pdf · uploaded 29 Jun 2026View
  • Form 2January 2020 to March 2020.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJanuary 2020 to March 2020.pdf · uploaded 29 Jun 2026View
  • Self-declaration of Quarterly ProgressJanuary 2020 to March 2020.pdf · uploaded 29 Jun 2026View
  • Form 1April 2020 to June 2020.pdf · uploaded 29 Jun 2026View
  • Form 2April 2020 to June 2020.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryApril 2020 to June 2020.pdf · uploaded 29 Jun 2026View
  • Self-declaration of Quarterly ProgressApril 2020 to June 2020.pdf · uploaded 29 Jun 2026View
  • Form 1July 2020 to Sept 2020.pdf · uploaded 29 Jun 2026View
  • Form 2July 2020 to Sept 2020.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJuly 2020 to Sept 2020.pdf · uploaded 29 Jun 2026View
  • Self-declaration of Quarterly ProgressJuly 2020 to Sept 2020.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked Inventorydec 20.pdf · uploaded 29 Jun 2026View
  • Form 1Dec2020.pdf · uploaded 29 Jun 2026View
  • Form 2Q3Dec 2020 Form 2.pdf · uploaded 29 Jun 2026View
  • Form 1January 2021 to March 2021.pdf · uploaded 29 Jun 2026View
  • Form 2January 2021 to March 2021.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJanuary 2021 to March 2021.pdf · uploaded 29 Jun 2026View
  • Self-declaration of Quarterly ProgressJanuary 2021 to March 2021.pdf · uploaded 29 Jun 2026View
  • Form 1april 2021 to June 2021.pdf · uploaded 29 Jun 2026View
  • Form 2april 2021 to June 2021.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked Inventoryapril 2021 to June 2021.pdf · uploaded 29 Jun 2026View
  • Form 1July 2021 to sept 2021.pdf · uploaded 29 Jun 2026View
  • Form 2July 2021 to sept 2021.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJuly 2021 to sept 2021.pdf · uploaded 29 Jun 2026View
  • Form 1October 2021 to December 2021.pdf · uploaded 29 Jun 2026View
  • Form 2October 2021 to December 2021.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryOctober 2021 to December 2021.pdf · uploaded 29 Jun 2026View
  • Form 1January 2022 to March 2022.pdf · uploaded 29 Jun 2026View
  • Form 2January 2022 to March 2022.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJanuary 2022 to March 2022.pdf · uploaded 29 Jun 2026View
  • Form 1April 2022 to June 2022.pdf · uploaded 29 Jun 2026View
  • Form 2April 2022 to June 2022.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryApril 2022 to June 2022.pdf · uploaded 29 Jun 2026View
  • Form 1July 2022 to Sept 2022.pdf · uploaded 29 Jun 2026View
  • Form 2July 2022 to Sept 2022.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJuly 2022 to Sept 2022.pdf · uploaded 29 Jun 2026View
  • Form 1October 2022 to December 2022.pdf · uploaded 29 Jun 2026View
  • Form 2October 2022 to December 2022.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryOctober 2022 to December 2022.pdf · uploaded 29 Jun 2026View
  • Form 1January 2023 to March 2023.pdf · uploaded 29 Jun 2026View
  • Form 2January 2023 to March 2023.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJanuary 2023 to March 2023.pdf · uploaded 29 Jun 2026View
  • Disclosure of Sold and Booked InventoryJune2023.pdf · uploaded 30 Jun 2026View
  • Form 1June 2023.pdf · uploaded 30 Jun 2026View
  • Form 2form 2 Q1 2023-24.pdf · uploaded 30 Jun 2026Source
  • Form 1July 2023 to Sept 2023.pdf · uploaded 30 Jun 2026View
  • Form 2July 2023 to Sept 2023.pdf · uploaded 30 Jun 2026View
  • Disclosure of Sold and Booked InventoryJuly 2023 to Sept 2023.pdf · uploaded 30 Jun 2026View
  • Form 1October 2023 to December 2023.pdf · uploaded 30 Jun 2026View
  • Form 2October 2023 to December 2023.pdf · uploaded 30 Jun 2026View
  • Disclosure of Sold and Booked InventoryOctober 2023 to December 2023.pdf · uploaded 30 Jun 2026View
  • Form 1January 2024 to March 2024.pdf · uploaded 30 Jun 2026View
  • Form 2January 2024 to March 2024.pdf · uploaded 30 Jun 2026View
  • Disclosure of Sold and Booked InventoryJanuary 2024 to March 2024.pdf · uploaded 30 Jun 2026View
  • Form 1June 24.pdf · uploaded 30 Jun 2026View
  • Form 2form 2 Q1 2024-25.pdf · uploaded 30 Jun 2026View
  • Disclosure of Sold and Booked Inventoryjune2024.pdf · uploaded 30 Jun 2026View
  • Form 1Sept2024.pdf · uploaded 30 Jun 2026View
  • Form 2form 2 Q2 2024-25.pdf · uploaded 30 Jun 2026View
  • Disclosure of Sold and Booked Inventorysept2024.pdf · uploaded 30 Jun 2026View
  • Form 1dec2024(2).pdf · uploaded 30 Jun 2026View
  • Form 2form 2 Q4 2024-25.pdf · uploaded 30 Jun 2026View
  • Disclosure of Sold and Booked InventoryDec2024.pdf · uploaded 30 Jun 2026View
  • Form 1march2025.pdf · uploaded 30 Jun 2026View
  • Form 2form 2 Q4 2024-25.pdf · uploaded 30 Jun 2026View
  • Disclosure of Sold and Booked InventoryMar 2025.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1june2025.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2form 2 Q1 2025-26.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1june2025.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2form 2 Q1 2025-26.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1june2025.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2form 2 Q1 2025-26.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1sept2025.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2form 2 Q2 2025-26.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1sept2025.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2form 2 Q2 2025-26.pdf · uploaded 30 Jun 2026View
  • Form 5 (FY 2025-2026)Form 5 FY 2025-26.pdf · uploaded 30 Jun 2026View
  • Form 2A (FY 2025-2026)Final 2A - FY 25-26.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1dec2025.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2form 2 Q3 2025-26 (1).pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 1march2026.pdf · uploaded 30 Jun 2026View
  • Withdrawal Update Form 2form 2 Q4 2025-26.pdf · uploaded 30 Jun 2026View

Promoter documents

  • Legal Title reportSEARCH REPORT.pdf · uploaded 27 Aug 2017View
  • Declaration Form BAFFIDAVIT.pdf · uploaded 29 Aug 2017View

Technical documents

  • Layout ApprovalPLOT LAYOUT.pdfView
  • Building Plan ApprovalBASEMENT PLAN.pdfView
  • Building Plan ApprovalFIRST AND SECOND FLOOR PLAN.pdfView
  • Building Plan ApprovalTHIRD FLOOR PLAN.pdfView

Financial documents

  • Other – FinanceCompletion Certificate.pdf · uploaded 20 Feb 2025View
  • Other – FinanceClarification Letter.pdf · uploaded 20 Feb 2025View

Proforma allotment letter

  • Proforma allotment letterAGREEMENT TO SALE.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pachora (M Cl), Pachora taluka

Survey, CTS, gat or plot numbers

1 OF 20882687A2689 TO 2693CTS 2669 TO 2672AND 2679 TO 2687

As published on MahaRERA's project page

CTS 2669 TO 2672AND 2679 TO 2687 AND 2687A AND 1 OF 2088 AND 2689 TO 2693

Boundaries

North
Existing V P Road
South
Adjoining Cts No 2700
East
Cts 2688 Part
West
Existing 15 Mt Wide Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSanjay Mhalas—
Chartered accountantSpak And Co—
Chartered accountantS S Dhamne & Co—
EngineerMilind Rathi—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology