Skip to content
Deedo home
Menu

Commercial Complex · Commercial Complex On Plot No 92 To 95

Neri Bk. · RERA P49900009686

IDBLD_0064731 floorCompleted
1Sanctioned habitable floorsregistration certificate
30 Jun 2023Promised completion

Floors

1 sanctioned habitable floor, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P49900009686 · registered 22 Aug 2017
Promised completion
30 Jun 2023
Sanctioned habitable floors
1

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
SHOP 118.9 m² (204 sq.ft)1not published
SHOP 1022.5 m² (243 sq.ft)1not published
SHOP 1122.5 m² (243 sq.ft)1not published
SHOP 1222.5 m² (243 sq.ft)1not published
SHOP 1322.5 m² (243 sq.ft)1not published
SHOP 1422.5 m² (243 sq.ft)1not published
SHOP 1522.5 m² (243 sq.ft)1not published
SHOP 1622.5 m² (243 sq.ft)1not published
SHOP 1722.5 m² (243 sq.ft)1not published
SHOP 1822.5 m² (243 sq.ft)1not published
Show all 28 unit typesShow fewer unit types
TypeCarpet areaUnitsBooked
SHOP 1922.5 m² (243 sq.ft)1not published
SHOP 222.5 m² (243 sq.ft)1not published
SHOP 2022.5 m² (243 sq.ft)1not published
SHOP 2122.5 m² (243 sq.ft)1not published
SHOP 2218.9 m² (204 sq.ft)1not published
SHOP 2318.9 m² (204 sq.ft)1not published
SHOP 2418.9 m² (204 sq.ft)1not published
SHOP 2518.9 m² (204 sq.ft)1not published
SHOP 2618.9 m² (204 sq.ft)1not published
SHOP 2718.9 m² (204 sq.ft)1not published
SHOP 2818.9 m² (204 sq.ft)1not published
SHOP 322.5 m² (243 sq.ft)1not published
SHOP 422.5 m² (243 sq.ft)1not published
SHOP 522.5 m² (243 sq.ft)1not published
SHOP 622.5 m² (243 sq.ft)1not published
SHOP 722.5 m² (243 sq.ft)1not published
SHOP 822.5 m² (243 sq.ft)1not published
SHOP 922.5 m² (243 sq.ft)1not published
Total28

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
Show all 11 activitiesShow fewer activities
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology