Vrudavan Heights

Lapsed

Jalgaon (M Corp.), Jalgaon 425001 |Promoter: Vrundavan Heights

15 Mar 2018Registered with MahaRERA
30 Sep 2020Promised completion
1Building
22Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Buildings
1
Unit types
2BHK, Residential Store, Shop22 units in all
Land area for this project
520 sq m (5,597 sq ft)
Permissible built-up area
1,196 sq m (12,874 sq ft)
Sanctioned built-up area
1,196 sq m (12,874 sq ft)
Address
Plot No.6 / CTS No.6940 / S.No.486/1D, Plot No.6, S.No.486/1D, POSTAL COLONYPIN 425001
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.99947, 75.53827
Vrudavan Heights is at latitude 20.99947, longitude 75.53827.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2020

The latest completion date on record passed 6 years and 1 month ago.

Registered
15 Mar 2018
Promised
30 Sep 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990001564715 Mar 201830 Sep 2020—Vrundavan HeightsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vrudavan Heights922

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

22 units registered

2BHK · 18 unitsResidential Store · 1 unitShop · 3 units
TypeCarpet areaUnits
2BHK51.4 sq m · 553 sq ft6
2BHK52.56 sq m · 566 sq ft6
2BHK54.1 sq m · 582 sq ft6
Residential Store37.93 sq m · 408 sq ft1
Shop10.76 sq m · 116 sq ft2
Shop22.18 sq m · 239 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00009
Open Space00009

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vrudavan Heights

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Water SupplyBOREWELL DONE100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)COMPLETED100%
  • Storm Water DrainsNot applicable
  • Storm Water DrainsCOMPLETED100%
  • Landscaping & Tree PlantingNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCOMPLETED100%
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsCOMPLETED100%
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationCOMPLETED100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • Open ParkingCOMPLETED100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 15 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificates

Form b

Form 1

Registration certificate

Completion

Other

Layout plan

Allotment letter

Document library

  • Declaration in FORM BForm B.pdf · uploaded 5 Mar 2018View
  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 5 Mar 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCH CERTI.pdf · uploaded 5 Mar 2018View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCE CIRTI 1.pdf · uploaded 5 Mar 2018View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCE CIRTI 2.pdf · uploaded 5 Mar 2018View
  • Building Plan Approval (IOD)BUILDING PLAN.pdf · uploaded 5 Mar 2018View
  • Details of encumbrancesENCUMBRANCE.pdf · uploaded 5 Mar 2018View
  • Proforma of Allotment letterSALE DEED.pdf · uploaded 6 Mar 2018View
  • Copy of Layout Approval (in case of layout)BUILDING PLAN.pdf · uploaded 6 Mar 2018View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION_CERT.pdf · uploaded 16 Nov 2022View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 5 Mar 2018View
  • Legal Title reportSEARCH REPORT.pdf · uploaded 5 Mar 2018View

Technical documents

  • Building Plan ApprovalBUILDING PLAN.pdfView
  • Layout ApprovalBUILDING PLAN.pdfView

Proforma allotment letter

  • Proforma allotment letterSALE DEED.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

Survey, CTS, gat or plot numbers

Plot No.6 / CTS No.6940 / S.No.486/1DPlot No.6 / CTS No.6940 / S.No.486/1Dat Jalgaon

As published on MahaRERA's project page

Plot No.6 / CTS No.6940 / S.No.486/1D

Boundaries

North
Plot no 5
South
Road
East
Plot no 3
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnand A Mukund—
EngineerAnand Mukund—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology