Jalgaon (M Corp.), Jalgaon 425001 |Promoter: M/S. Faith Build Constructions

Residential / Group HousingRERAP49900048617
10 Jan 2023Registered with MahaRERA
31 Dec 2027Promised completion
1Building
10Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Buildings
1
Unit types
2BHK10 units in all
Land area for this project
279 sq m (3,001 sq ft)
Permissible built-up area
1,111 sq m (11,963 sq ft)
Sanctioned built-up area
811 sq m (8,733 sq ft)
Address
Plot No 11, Cts No. 8170, S. No. 282/1, Jeevan Vikas Colony, JalgoanPIN 425001
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2027

Registered
10 Jan 2023
Promised
31 Dec 2027

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990004861710 Jan 202331 Dec 2027—M/S. Faith Build ConstructionsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Udyog Ishwar610

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 units registered

2BHK · 10 units
TypeCarpet areaUnits
2BHK69.74 sq m · 751 sq ft10

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000015

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Udyog Ishwar

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure5%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER NATURAL SOURCES80%
  • Sewerage (Chamber, Lines, Septic Tank , STP)LINES80%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTING100%
  • Street LightingLED60%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS REQUIRED0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER SANCTION PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

33 documents held by Deedo, 38 filings listed on MahaRERA's project page

Title

Encumbrances

Commencement certificates

Form bs

Form 1s

Form 2s

Form 2as

Allotment letters

Others

Registration certificate

Form 5s

Layout plan

Building plan

Document library

  • Copy of the legal title report2 Copy of the legal title report.pdf · uploaded 8 Sep 2022View
  • a Details of encumbrances concerned to Finance3 DETAIL OF ENCU FOR FINANCE.pdf · uploaded 8 Sep 2022View
  • b Details of encumbrances concerned to Legal4 DETAIL OF ENCU FOR LEGAL.pdf · uploaded 8 Sep 2022View
  • Copy of Layout Approval (in case of layout)5 Copy of Layout Approva.pdf · uploaded 8 Sep 2022View
  • Building Plan Approval / NA Order for plotted development6 BUILDING PERMISSION PLAN.pdf · uploaded 8 Sep 2022View
  • Commencement Certificates / NA Order for plotted development7 COMMENCEMENT CERTIFICATE.pdf · uploaded 8 Sep 2022View
  • Declaration about Commencement Certificate8 DECLARATION ABOUT COMMENCEMENT.pdf · uploaded 8 Sep 2022View
  • Declaration in FORM B9 FORB - B -PROMOTOR.pdf · uploaded 8 Sep 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)10 ARCHITECTS CERTIFICATE.pdf · uploaded 8 Sep 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)11 ENGINEER CERTIFICATE.pdf · uploaded 8 Sep 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)12 ENGINEER CERTIFICAT -2A.pdf · uploaded 8 Sep 2022View
  • Declaration in FORM B9 FORB - B CO-PROMOTOR.pdf · uploaded 8 Sep 2022View
  • Proforma of Allotment letterMODEL FORM OF ALLOTMENT LETTER.pdf · uploaded 22 Nov 2022View
  • Deviation Report with respect to Allotment letterDEVIATION IN ALLOTMENT LETTER AND AGREEMENT.pdf · uploaded 22 Nov 2022View
  • Deviation Report with respect to model copy of AgreementDEVIATION IN ALLOTMENT LETTER AND AGREEMENT.pdf · uploaded 1 Dec 2022View
  • Proforma of Agreement for saleDRAFT COPY -ATS FOR UDYOG ISWAR.pdf · uploaded 2 Dec 2022View
  • CERSAI detailsNEW CERSAI_Search_Report_200253241568_For_Asset_Based_Search_26_11_2022_10_50_02_904.pdf · uploaded 8 Dec 2022View
  • CERSAI detailsNEW 1 CERSAI_Search_Report_200253242112_For_Asset_Based_Search_26_11_2022_11_00_24_765.pdf · uploaded 8 Dec 2022View
  • Disclosure of Interest in Other Real Estate OrganizationsDISCLOSURE OF INTEREST IN OTHER ORGANIZATION.pdf · uploaded 2 Jan 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A for separate Babnk account.pdf · uploaded 3 Jan 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)AR CERTI -UDYOG ISHWAR.pdf · uploaded 26 Sep 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENG FORM 2 -UDYOG ISHWAR.pdf · uploaded 26 Sep 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ENG FORM 2A -UDYOG ISHWAR.pdf · uploaded 26 Sep 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 UDYOG ISHWAR.pdf · uploaded 15 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH - CERTIFICATE QUARTER - 1.pdf · uploaded 21 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH - CERTIFICATE QUARTER - 2.pdf · uploaded 21 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCH - CERTIFICATE QUARTER - 3.pdf · uploaded 21 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2 QUARTER – 1.pdf · uploaded 21 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2 QUARTER – 2.pdf · uploaded 21 Nov 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineer Certificate Form 2 QUARTER – 2.pdf · uploaded 21 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2 QUARTER – 3.pdf · uploaded 21 Nov 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)ishwar FORM 5.pdf · uploaded 17 Dec 2024View

Promoter documents

  • Legal Title report2 Copy of the legal title report.pdf · uploaded 8 Sep 2022View
  • Declaration Form B9 FORB - B -PROMOTOR.pdf · uploaded 8 Sep 2022View
  • Declaration Form B9 FORB - B CO-PROMOTOR.pdf · uploaded 8 Sep 2022View

Technical documents

  • Layout Approval5 Copy of Layout Approva.pdfView
  • Building Plan Approval6 BUILDING PERMISSION PLAN.pdfView

Proforma allotment letter

  • Proforma allotment letterMODEL FORM OF ALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalgaon (M Corp.), Jalgaon taluka

Survey, CTS, gat or plot numbers

11282/18170CTS NO. 8170PLOT NO 11S. NO. 282/1

As published on MahaRERA's project page

PLOT NO 11, CTS NO. 8170, S. NO. 282/1

Boundaries

North
30 Fit Wide Road
South
S No 283
East
Plot No 12 Of The Same Lay-Out
West
Plot No 10 Of The Same Lay-Out

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Rohit S Raka—
Chartered accountantS B Deshmukh—
EngineerSunil M Raka—

Source: MahaRERA project page. Contact details are not shown.