Sai Sapphire Regency

Completed

Jalgaon (M Corp.), Jalgaon 425001 |Promoter: Kashinath Motiram Talele

Residential / Group HousingRERAP49900010682
31 Aug 2017Registered with MahaRERA
31 Dec 2017Promised completion
1Building
10Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential10 units in all
Land area for this project
488 sq m (5,250 sq ft)
Permissible built-up area
683 sq m (7,350 sq ft)
Sanctioned built-up area
683 sq m (7,350 sq ft)
Address
Plot No 30, Survey No 472/3, Cts 6386, MehrunPIN 425001
Designated bank account
The Jalgaon Peopels Cooperative Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.97019, 72.84596
Sai Sapphire Regency is at latitude 18.97019, longitude 72.84596.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
31 Aug 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P4990001068231 Aug 201731 Dec 2017—Kashinath Motiram TaleleProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sai Sapphire Regency610

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

10 units registered

Residential · 10 units
TypeCarpet areaUnits
Residential563.9 sq m · 6,070 sq ft10

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000010
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Sai Sapphire Regency

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyCompeted fully100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Completed fully100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingCompleted fully100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 22 filings listed on MahaRERA's project page

Title report

Commencement certificate (2)

Form B

Form 1

Form 2

Registration certificate

Occupancy / completion certificate (3)

  • Occupancy / completion certificate5 Sep 2019ViewSource
Show all 39 documentsShow fewer documents

Occupancy / completion certificate (3)

  • Occupancy / completion certificate5 Sep 2019ViewSource
  • Occupancy / completion certificate5 Sep 2019ViewSource

Form 4 (2)

Other

Layout plan

Building plan (2)

Allotment letter

Document library

  • Copy of Layout Approval (in case of layout)Not Applicable.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterSai Saipphare draft.pdf · uploaded 16 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentimg04396-min-1-1.pdf · uploaded 16 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentimg04396-min-2-2.pdf · uploaded 16 Aug 2017View
  • Declaration in FORM BForm B.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)002-170813-0001-min.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)002-170813-0002-min-compressed3.pdf · uploaded 16 Aug 2017View
  • Copy of the legal title reportTitle Search Report.pdf · uploaded 16 Aug 2017View
  • Details of encumbrancesTitle Search Report.pdf · uploaded 16 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer's Certificate.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 16 Aug 2017View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION593.pdf · uploaded 5 Sep 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION729.pdf · uploaded 5 Sep 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION754.pdf · uploaded 5 Sep 2019View
  • Architect’s Certificate on Completion of Project (Form 4)form-4.pdf · uploaded 22 Feb 2020View
  • Architect’s Certificate on Completion of Project (Form 4)form-4005.pdf · uploaded 25 Feb 2020View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 16 Aug 2017View
  • Legal Title reportTitle Search Report.pdf · uploaded 16 Aug 2017View

Technical documents

  • Layout ApprovalNot Applicable.pdfView
  • Building Plan Approval002-170813-0001-min.pdfView
  • Building Plan Approval002-170813-0002-min-compressed3.pdfView

Proforma allotment letter

  • Proforma allotment letterSai Saipphare draft.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Jalgaon (M Corp.), Jalgaon taluka

Survey, CTS, gat or plot numbers

30472/36386CTS 6386PLOT NO 30SURVEY NO 472/3

As published on MahaRERA's project page

PLOT NO 30, SURVEY NO 472/3, CTS 6386, MEHRUN

Boundaries

North
Plot No 43
South
Open Road
East
Plot No 29
West
Plot No 31

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectLalit S Rane—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology