Skip to content
Deedo home
Menu

Estate 2 · Prakash Estates

Jalgaon (M Corp.) · RERA P49900002142

IDBLD_0064498 floorsCompleted
8Sanctioned habitable floorsregistration certificate
14 Dec 2018Promised completion

Floors

8 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P49900002142 · registered 31 Jul 2017
Promised completion
14 Dec 2018
Sanctioned habitable floors
8

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
1BHK38.3 m² (413 sq.ft)1not published
1BHK38.9 m² (419 sq.ft)1not published
1BHK43.7 m² (470 sq.ft)1not published
1BHK44 m² (473 sq.ft)1not published
1BHK44.3 m² (477 sq.ft)2not published
2BHK44.3 m² (477 sq.ft)1not published
BASEMENT51.3 m² (553 sq.ft)1not published
SHOP10.2 m² (110 sq.ft)1not published
SHOP13.2 m² (142 sq.ft)2not published
SHOP14.4 m² (155 sq.ft)1not published
Total12

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0002
Open Space0000

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
Show all 11 activitiesShow fewer activities
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology