Estate 2 · Prakash Estates
Jalgaon (M Corp.) · RERA P49900002142
IDBLD_0064498 floorsCompleted
8Sanctioned habitable floorsregistration certificate
14 Dec 2018Promised completion
Floors
8 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- Sanctioned habitable floors
- 8
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 38.3 m² (413 sq.ft) | 1 | not published |
| 1BHK | 38.9 m² (419 sq.ft) | 1 | not published |
| 1BHK | 43.7 m² (470 sq.ft) | 1 | not published |
| 1BHK | 44 m² (473 sq.ft) | 1 | not published |
| 1BHK | 44.3 m² (477 sq.ft) | 2 | not published |
| 2BHK | 44.3 m² (477 sq.ft) | 1 | not published |
| BASEMENT | 51.3 m² (553 sq.ft) | 1 | not published |
| SHOP | 10.2 m² (110 sq.ft) | 1 | not published |
| SHOP | 13.2 m² (142 sq.ft) | 2 | not published |
| SHOP | 14.4 m² (155 sq.ft) | 1 | not published |
| Total | 12 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 2 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)100%
- Plinth100%
- Stilt Floor100%
- Slabs of Super Structure100%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
- Sanitary Fittings within the flats / premises100%
Show all 11 activitiesShow fewer activities
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology